About the Arctic Gateway Group

About the Arctic Gateway Group

THE ARCTIC GATEWAY GROUP IS OWNED BY FIRST NATIONS AND BAYLINE COMMUNITIES, FAIRFAX AND AGT FOODS, BUILDING A NATURAL RESOURCES CORRIDOR THROUGH THE ARCTIC TO THE WORLD. ABOUT THE ARCTIC GATEWAY GROUP The Arctic Gateway Group LP owns and operates the Port of Churchill, Canada’s only Arctic seaport serviced by rail, on the Hudson Bay Railway, running from The Pas to Churchill, Manitoba. Strategically located on the west coast of Hudson Bay, the Arctic Gateway is the front door to Western Canada, linking Canadian trade in resources to the global marketplace. HUDSON BAY RAILWAY The Arctic Gateway’s logistical advantage, rail assets and unique location provide direct and efficient routes to markets for Canada’s abundant natural resources and manufactured products, while connecting Canadian consumers and importers to the world marketplace via the North. THE ARCTIC GATEWAY OFFERS LOCAL COMMUNITIES... Local business contracting opportunities Local training and development initiatives to Lasting economic activity create lasting wealth and prosperity for Northern Employment Manitoba First Nations and communities Arctic Gateway Group LP Arctic_Gateway ArcticGateway 728 Bignell Ave. ArcticGateway The Pas, MB R9A 1L8 1-888-445-1112 [email protected] www.arcticgateway.com PORT OF CHURCHILL trategically located on the west coast Open Water Days Per Year S of Hudson Bay, the Port of Churchill 200 Average Increase: 1.14 days/year brings Atlantic Ocean trade to the doorstep 180 of Western Canada. 160 The Port of Churchill offersfour deep-sea berths for loading 140 and unloading grain, manufactured, mining and forest 120 commodities, general cargo, and tanker vessels. Connected Season (Days) of Open Water Length to the rest of Canada via the Hudson Bay Railway, the Port 1985 1990 1995 2000 2005 2010 of Churchill is closer to 25% of Canada’s western grain production than any other port in the world. murmansk 5,202 KM cambridge bay hall beach 1,265 KM 1,277 KM BATHURST INLET beijing 1,141 KM The Port’s ideal location eliminates time-consuming and high- 8,695 KM cost transportation through the Great Lakes and St. Lawrence port of deception bay churchill 1,160 KM antwerp james bay 5,768 KM Seaway, providing unique opportunities for shipping products 1,023 KM to Europe, Russia, Africa, Latin America and the Middle East. 4 loading berths | depth Grain Storage 140,000 mt Shipping Capacity 1,200 mt/hr Peak Capacity (year) 736,449 mt (1977) Fuel 10 m Berth 11.5 m Indoor Storage 82,000 sqft Receiving Capacity 1,100 mt/hr Yearly Average (1995-2015) 459,514 mt Layby 10 m Berth 9 m Ample Outdoor Storage Cleaning Capacity 850 mt/hr 32,318,150 mt of grain handled since opening, Approach Channel 8.5 m Maximum 225m LOA CGC-Approved Sampling Systems approx. $8.9 billion CAD in value* *Based on current durum wheat commodity prices HUDSON BAY RAILWAY he Hudson Bay Railway is made up of (CN, KRC) port of T 627 miles of trackage, with a network port location interchange churchill that connects with CN in The Pas, running hudson bay railroad (hbr) agg HBR operating agg railroad agreement north through Manitoba to the Hudson Bay and Port of Churchill. lynn lake kelsey gillam The Hudson Bay Railway is a vital transportation link in pukatawagan thompson ilford Northern Manitoba’s important resource-based industries, as sherridon thicket Flin Flon well as a primary link in the supply chain to serve communities in sherritt jct wabowden Manitoba and the Kivalliq region of Nunavut, hauling consumer Cranberry portage goods, grain, fuel, mining and manufactured products, as well the pas the pas jct as serving the tourism industries of Churchill and the North. HUDSON BAY RAILWAY Key Stops The Pas, Flin Flon, Thompson, Gillam, Churchill Car Storage 600 Cars Avg. Trip Time* 4.5 days *The Pas to Churchill, barring additional slow time CHURCHILL MARINE TANK FARM he Churchill Tank Farm is a vital link in the transportation T of petroleum products to Northern Canada. The 50 million litre tank farm is currently undergoing planning for infrastructure upgrades to expand storage and flow capacities. This significant capital investment will result in a modern petroleum transload facility..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us