INSPECTION REPORT-WBL11190-Dry And

INSPECTION REPORT-WBL11190-Dry And

To, THE DIRECTOR OF BOILERS, WEST BENGAL New Secretariat Building (8th floor) 1, K.S. Roy Road, KOLKATA - 700001 Sir, Name of the Owner: National Thermal Power Corporation Ltd. Locality: Farakka Super Thermal Power Project Farakka-742236, P.O : Nabarun, Murshidabad, Boiler Registration No: WBL11190, Boiler Type: Water Tube, Date of Inspection: 13-05-2021 Sub : Recommendation for extension of steaming certificate of boiler as per Reg.376 (ff) of IBR, 1950 for a period of 12 months w.e.f. 26.05.2021 Ref : Form XIX submitted by the owners on dt. 17.04.2021 With reference to above this is to report that the owners in their letter under reference, have applied for extension of steaming certificate of the boiler for a period of 12 months w.e.f. 26.05.2021 and submitted required data as per Appendix-'JA' along with Form-XIX. The relevent documents have been checked and found as follows : 1. The steaming certificate of the boiler was issued on 26.05.20 after thorough overhauling for a period of 12 months (i.e. 26.05.20 to 25.05.21) 2. The information given in Appendix-JA and in Form-XIX have been checked and found to be in order. 3. There is no report of major failure of boiler pressure parts since last inspection. 4. The W.P. of the boiler is more than 100 Kg/cm2 and the age of the boiler is more than 20 years. Previous RLA was carried out during the year 2018, with a conclusion that the boiler may be operated for another 6 years. 5. The owners have already submitted requisite fees for inspection along with duly filled in Form B-I. So, considering the owners' appeal, the steaming certificate of the boiler may be extended for a period of twelve months w.e.f. 26.05.2021 as per Reg.376 (ff) of IBR, 1950. Yours faithfully, Arindam Chakraborty Deputy Director of Boilers, W.B. No. WB/R/2021/0596.date 13-05-2021 Copy forwarded for information and necessary action to:- i)National Thermal Power Corporation Ltd., Farakka Super Thermal Power Project Farakka-742236, P.O. : Nabarun, Murshidabad, ii)Sri Arindam Chakraborty, Deputy Director of Boilers, W.B. Joint Director of Boilers, W.B. Powered by TCPDF (www.tcpdf.org).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us