World Bank Document

World Bank Document

PROCUREMENT PLAN Public Disclosure Authorized 1US$ = 6.8 RMB TOTAL COSTS WB loan Proposed Schedule Procure. Review by Contract CP N° CONTENT Supply & Contractor's Name Contract Price Comments *106 RMB *106 US$ *106 US$ % Method Bank Bid Period* Civil works Signing Date Installation Water Supply 01ws - ZHUJI (ZJ) WSZJ1C - a 40,000 m3/d Qingshan water 2010/09- 2011/01- Zhejiang Hongda Construton Engineering WSZJ1C CW of WTP and intake pipe 24.29 3.58 2.41 68.0% NCB PRIOR 20101220 21,119,694.20 treatment plant. 2010/12 2012/03 Co.,Ltd. Water distribution pipeline of Public Disclosure Authorized 2011/10- 2012/04- WSZJ2C-1 Caota and main pipe of 20km x DN300 ~ DN800 52.16 7.67 4.61 68.0% NCB PRIOR 20120410 Huadi Construton Co.,Ltd. 43,238,635.00 2012/03 2013/05 Datang Town Water distribution pipeline of 2011/10- 2012/02- Shaoxing Shuilian Constrution Engineering WSZJ2C-2 Wangjiajing/Paitou/Anhua 23.8km x DN300 20.93 3.08 1.85 68.0% NCB POST 20120215 20,283,003.00 2011/12 2013/04 Co., Ltd. and inside pipe of Datang WSZJ1S - SIC of goods for 40,000 m3/d Qingshan 2011/04- 2011/06- WSZJ1S SIC of WTP 13.78 2.03 1.38 68.0% NCB PRIOR 20110720 Zhejiang Zhu'an Construton (Group) Co.,Ltd. 11,980,000.00 water treatment plant. 2011/05 2012/03 Subotal Total Contract Packages 111.16 16.36 10.25 68.0% 96,621,332.20 Public Disclosure Authorized 02ws - JINHUA - WUCHENG (WC) WSWC1C - Civil works for Construction of (i) a 0.17 km x DN800 steel gravity main from Xinfan 2010/08- 2010/11- WSWC1C CW of WTP and intake pipe 23.26 3.42 3.21 94.0% NCB PRIOR 20101027 Zhejiang Shengyuan (Group) Co.,Ltd. 24,508,108.00 reservoir, and (ii) a 50,000 m3/d Tangxi water 2010/09 2011/12 treatment plant. WSWC2C - Civil works for a 12.73 km x DN800 ~ 2010/10- 2011/03- WSWC2C CW main distribution pipe 26.09 3.84 3.60 94.0% NCB PRIOR 20110131 Zhejiang Honglin Construton Co.,Ltd. 19,683,279.00 DN900 clear water main 2011/01 2012/01 SIC of goods for water WSWC1S - SIC of goods for 50000m3/d water 2010/12- 2011/05- Zhejiang Installation Engineering Co.,Ltd. Of WSWC1S 13.73 2.02 1.89 94.0% NCB PRIOR 20110511 13,236,464.83 treatment plant treatment plant 2011/02 2011/12 Zhongtian Constrution Group Yiwu City Hydropower Construction constucted clear water main WSWC3C - NBF - 3.2 km x DN800 clear water Public Disclosure Authorized Engineering Co., Ltd./Jinhua City Wucheng WSWC3C - NBF from Jinxi WSP to main pipe, and a 1,500 m3 Dongmenshan high 11.54 1.70 NBF NA 20100507 12,225,518.00 District Hydropower Construction and Dongmenshan level clear water tank. Installation Company constructed secondary network WSWC4C - NBF - civil work for 24.38km DN110- Jinhua City Wucheng District Hydropower WSWC4C - NBF 10.54 1.55 NBF NA 20080514 6,162,295.00 in Jiangtang DN315 pipes in Jiangtang town. Construction and Installation Company constructed secondary network WSWC5C - NBF - civil work for 15.21km DN110- Yongkang City Hydropower Construction and WSWC5C - NBF 9.09 1.34 NBF NA 20090605 7,230,000.00 in Tangxi DN600 pipes in Tangxi town. Installation Company Subotal Total Contract Packages - NBF excluded 63.08 9.28 8.70 94.0% 57,427,851.83 Total Total Water Supply - NBF excluded 174.24 25.64 18.95 73.9% Wastewater 03ww - JIANDE (JD) WWJD1C - Civil works for 19,000 m3/d expansion 2013/05- 2013/07- WWJD1C CW of WWTP of Chendong WWTP and 30,000 m3/d upgrading 30.39 4.47 3.10 70.0% NCB POST 2013/07 2014/12 from 1B to 1A CW of network in Genglou WWJD2C - 13km sewerage(DN300~800) for 2014/01- 2014/03- WWJD2C 18.29 2.69 1.87 70.0% NCB POST Community genglou and xin'anjiang urban area . 2014/03 2014/12 WWJD3C - 4500m3/d Pumping Station (including CW of network in Yangxi 2011/08- 2012/01- WWJD3C civil work and equipment and installation),and 8.60 1.26 0.86 70.0% NCB PRIOR 20111231 Zhongtai Construction Group Co., Ltd. 8,403,610.00 Community 2011/12 2014/12 pressure pipe of outlet. WWJD1S -SIC of goods for 19,000 m3/d 2013/05- 2013/08- WWJD1S SIC of goods in WWTP expansion of Chendong WWTP and 30,000 m3/d 18.61 2.74 1.90 70.0% NCB POST 2013/07 2014/12 upgrading from 1B to 1A Subotal Total Contract Packages 75.89 11.16 7.73 70.0% 8,403,610.00 04ww - QUZHOU - QUJIANG (QJ) TOTAL COSTS WB loan Proposed Schedule Procure. Review by Contract CP N° CONTENT Supply & Contractor's Name Contract Price Comments *106 RMB *106 US$ *106 US$ % Method Bank Bid Period* Civil works Signing Date Installation Water Supply 2011/05- 2011/10- WWQJ1C CW of WWTP 30.85 4.54 3.33 73.0% NCB PRIOR 20110926 Zhejiang Jieyu Group Co., Ltd. 33,744,444.00 2011/09 2012/12 WWQJ2C - 4.1km ww pipes,1.4km storm pipes CW of network in new district 2013/04- 2013/06- WWQJ2C and 1.4km water supply pipes for Tongjiang / Xinan 10.00 1.47 1.07 73.0% NCB POST expansion area 2013/05 2013/12 roads CW of network in northwest WWQJ3C - 2.2km ww pipes and 6.3km storm 2013/09- 2013/11- WWQJ3C 8.32 1.22 0.89 73.0% NCB POST area pipes in Qiuzhi / Kangning / Fanggui roads 2013/10 2015/06 WWQJ4C - 14.2km ww pipes, 8.1km storm pipes,14.4km water supply pipes and 5.6km electrical power pipes in Tongpu / Xingfeng/ 2011/05- 2011/09- Zhejiang Guangsha Municipal Engineering WWQJ4C part 1 of Xiafei road west 17.45 2.51 1.84 73.0% NCB PRIOR 20110818 17,205,746.00 Chayuan/ Roads, Zhenxinyi/ Zhenxing'er/ 2011/08 2012/12 Co., Ltd. Zhenxingsan Roads( to the east of Bingang Road) and Dongji'er/ Dongjisan roads. WWQJ5C - 17.8km ww pipes, 8.5km stormwater pipes,20.3km water supply pipes and 7.8km electrical power pipes ,including Meilin / Dangui / 2012/08- 2012/10- WWQJ5C part 2 of Xiafei road west 27.59 4.06 2.96 73.0% NCB PRIOR 20120929 Quzhou Municipal Engineering Co., Ltd. 25,282,484.00 Tongjiang / Daqiao / Xianyan / Shangjin roads, 2012/09 2014/10 Zhenxingyi / Zhenxing'er/ Zhenxingsan Roads(to the West of Bingang Roa WWQJ1S - SIC of goods for 20000m3/d 2012/09- 2012/12- WWQJ1S SIC of goods in WWTP 36.81 5.41 3.97 73.0% NCB PRIOR 20121231 Zhejiang Zhuan Construction Group Co., Ltd.. 24,984,665.00 Chengdong WWTP. 2012/11 2013/08 WWQJ6C - NBF - 4.2km sewers & 3.0km Shaoxing Construction Group Co., Ltd. an underconstruction package 2010/03- WWQJ6C - NBF stormwater pipes,including zhengxingxi/tongjiang 7.74 1.14 NBF NA 20100401 (tenderⅠ) /Quzhou 5th Construction 7,740,000.00 in west xiafei road 2010/12 road. Engineering Co., Ltd. (tenderⅡ) Subotal Total Contract Packages - NBF excluded 131.02 19.22 14.08 73.0% 101,217,339.00 05WW - LANXI - YOUBU (YB) CW of WWTP and discharge 2010/07- 2010/09- WWYB1C WWYB1C - civil work for 5,000 m3/d WWTP 8.47 1.25 0.79 64.0% NCB PRIOR 20100826 Zhejiang Tianxia Construton Co.,Ltd. 6,650,000.00 pipe 2010/08 2011/06 WWYB2C - 3km WW pipes in south part of new CW of WW pipe in south and 2013/03- 2013/05- WWYB2C area and 3.3km DN600 main WW pipe to WWTP 8.89 1.31 0.83 64.0% NCB POST north part area and collector 2013/04 2014/05 & 5.8km ww in north part of new area WWYB3C -1.7km ancient road renovation with 根据兰溪项目办要求,将WWYB3C和W CW of ancient road and CW of 2013/05- 2013/06- WWYB3C associated ww/storm water pipes & 0.74km guxi 19.41 2.85 1.81 64.0% NCB POST WYB6C两个合同合并采购,合同内容不 river rinovation 2013/06 2013/12 river renovation 变 WWYB4C -1.5km new 2012/10- 2012/12- WWYB4C CW of new road road(tianfu/yongxin/yongfu)with associated 18.84 2.77 1.76 64.0% NCB POST 20121210 Zhejiang Zhongyi Construton Co.,Ltd. 11,963,115.00 2012/11 2013/05 sewerage & stormwater pipe JV Zhejiang Bohua Environmental Technology 2010/10- 2011/05- Engineering Co.,Ltd. And The 7th. WWYB1S SIC of WWTP goods WWYB1S - SIC of goods for 5000m3/d WWTP 9.35 1.38 0.87 64.0% NCB PRIOR 20110510 6,927,742.74 2011/02 2012/05 Construction Engineering of Guizhou Constrution and Engineering Group Subotal Total Contract Packages 64.96 9.55 6.07 64.0% 25,540,857.74 06ww - PAN'AN Jianshan (JS) CW and goods S&I of Jianshan WWJS1C - CW and goods supply and installation 2011/02- 2011/08- WWJS1C 43.65 6.42 4.72 76.0% NCB PRIOR 20110704 Hangzhou Equipment Installation Co., Ltd. 30,510,190.00 project of 6000m3/d WWTP,3 pumpstations and networks 2011/07 2012/12 Subotal Total Contract Packages 43.65 6.42 4.72 76.0% 30,510,190.00 07ww - PAN'AN Shenze (SZ) WWSZ1C - 2.3km Cuixi river embankment with 2011/08- 2012/03- WWSZ1C CW of cuixi river enbankment associated 2*2.3km WW pipes on the two sides of 54.79 8.06 5.09 63.0% NCB PRIOR 20111206 First Hydropower Construction Group Co., Ltd.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us