Supplemental Land Use and Economic Development Information and Supporting Documentation Templates for Small Starts Projects September 2017

Supplemental Land Use and Economic Development Information and Supporting Documentation Templates for Small Starts Projects September 2017

Virginia Street Bus RAPID Transitubmitted Extension by: Regional Transportation Commission of Washoe County Supplemental Land Use and Economic Development Information and Supporting Documentation Templates for Small Starts Projects September 2017 Submitted by: Regional Transportation Commission of Washoe County With support from: VIRGINIA STREET BUS RAPID TRANSIT EXTENSION PROJECT Page intentionally left blank Page | i VIRGINIA STREET BUS RAPID TRANSIT EXTENSION PROJECT Table of Contents Overview __________________________________________________________________________________________________ 1 Existing Land Use ________________________________________________________________________________________ 2 Existing Corridor and Station Area Development _________________________________________________________________ 2 The Districts _______________________________________________________________________________________________________ 3 UNR DISTRICT ____________________________________________________________________________________________________ 4 DOWNTOWN DISTRICT __________________________________________________________________________________________ 7 MIDTOWN DISTRICT ____________________________________________________________________________________________ 12 Existing Corridor and Station Area Development Character ____________________________________________________ 15 UNR DISTRICT ___________________________________________________________________________________________________ 15 DOWNTOWN DISTRICT _________________________________________________________________________________________ 17 MIDTOWN DISTRICT ____________________________________________________________________________________________ 18 Existing Station Area Pedestrian Facilities, including access for persons with disabilities ___________________ 19 UNR DISTRICT ___________________________________________________________________________________________________ 19 DOWNTOWN DISTRICT _________________________________________________________________________________________ 20 MIDTOWN DISTRICT ____________________________________________________________________________________________ 21 Existing Corridor And Station Area Parking Supply ______________________________________________________________ 22 Supplemental Parking Information_____________________________________________________________________________ 23 Economic Development _________________________________________________________________________________ 24 Transit Supportive Plans and Policies: Transit supportive corridor policies ___________________________________ 24 Plans and Policies to Increase Corridor and Station Area Development _____________________________________ 24 Plans and Policies to Enhance Transit-Friendly Character of Corridor and Station Area Development ___ 25 Plans to Improve Pedestrian Facilities, Including Facilities For Persons With Disabilities _________________ 26 Parking Policies __________________________________________________________________________________________________ 26 Transit Supportive Plans and Policies: Supportive Zoning Regulations Near Transit Stations _______________ 27 Zoning Ordinances That Support Increased Development Density in Transit Station Areas ______________ 27 Zoning Ordinances That Enhance Transit-Oriented Character of Station Area Development and Pedestrian Access _____________________________________________________________________________________________________________ 27 Zoning Allowances for Reduced Parking and Traffic Mitigation _____________________________________________ 28 Transit Supportive Plans and Policies: Tools to Implement Land Use Policies _________________________________ 29 Outreach to Government Agencies and the Community in Support of Transit Supportive Planning ______ 29 Regulatory and Financial Incentives to Promote Transit-Supportive Development ________________________ 30 Page | ii VIRGINIA STREET BUS RAPID TRANSIT EXTENSION PROJECT Efforts to Engage the Development Community in Station Area Planning and Transit-Supportive Development _____________________________________________________________________________________________________ 30 Performance and Impacts of Land Use Policies: Performance of Land Use Policies ___________________________ 32 Demonstrated Cases of Developments Affected by Transit-Supportive Policies ____________________________ 32 Station Area Development Proposals and Status ______________________________________________________________ 38 Performance and Impacts of Land Use Policy: Potential Impact of Transit Project on Regional Land Use __ 39 Adaptability of Station Area Land for Development __________________________________________________________ 39 Corridor Economic Environment _______________________________________________________________________________ 39 Tools to Maintain or Increase the Share of Affordable Housing _________________________________________________ 45 Evaluation of Corridor Specific Affordable Housing Needs and Supply _____________________________________ 45 Plans and Policies to Preserve and Increase Affordable Housing in the Region and/or Corridor _________ 47 Adopted Financing Tools and Strategies Targeted to Preserving and Increasing Affordable Housing in the Region and/or Corridor _________________________________________________________________________________________ 47 Evidence of Developer and Public Sector Activity to Preserve and Increase Affordable Housing in the Corridor __________________________________________________________________________________________________________ 48 Extent to Which Plans and Policies Account for Long-Term Affordability and Needs of the Very- and Extremely-Low Income Households in the Corridor __________________________________________________________ 49 Local Financial Commitment Checklist ________________________________________________________________ 50 Table of Figures Figure 1. Districts in the Virginia Street Corridor ............................................................................................................................. 2 Figure 2. Connecting UNR & Downtown Has Long Been a Goal of the City of Reno .......................................................... 3 Figure 3. UNR Points of Interest & Station Locations ...................................................................................................................... 4 Figure 4. University of Nevada, Reno Student Center and Library. Parking Lot on Lower Right was converted to the E.L. Wiegand Fitness Center. ............................................................................................................................................................... 5 Figure 5. The Standard at Reno (Student Housing) ......................................................................................................................... 6 Figure 6. RTC 4TH STREET STATION ...................................................................................................................................................... 7 Figure 7. Downtown District Points of Interest Map ....................................................................................................................... 8 Figure 8. Reno Arch and Whitney Peak Hotel (with exterior climbing wall) ........................................................................ 9 Figure 9. Non-Gaming Hotel Recently Opened near RTC 4TH STREET STATION (right) .............................................. 10 Figure 10. Recently Opened Innevation Center on the Virginia Street RAPID Route ...................................................... 10 Figure 11. Juniper Village Affordable Housing Development that Opened in 2015 in the RTC 4TH STREET STATION AREA................................................................................................................................................................................................ 10 Figure 12. Reno Bike Project (Left) and Martin Iron Works (Right)....................................................................................... 11 Figure 13. The Depot restaurant, which opened near RTC 4TH STREET STATION in 2015 ........................................ 11 Figure 14. Midtown District Points of Interest Map ....................................................................................................................... 12 Page | iii VIRGINIA STREET BUS RAPID TRANSIT EXTENSION PROJECT Figure 15. Reno's Riverwalk District..................................................................................................................................................... 13 Figure 16. Rendering of Park Lane Redevelopment Project (Currently Under Construction).................................... 14 Figure 17. Construction of the Student Achievement Center, Peavine Residence Hall, and Housing near the University (Image Credit: RTC) ............................................................................................................................................................... 15 Figure 18. UNR USDA Food Desert ........................................................................................................................................................ 16 Figure 19. Industry Type Breakdown of Downtown Reno (Data Credit: Infogroup, 2015) ......................................... 17 Figure 20. Whitney Peak Hotel; Downtown Reno Skyline; Staging for the Mayoral Bike Ride During Bike Week 2015; and

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    58 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us