Newmont Boddington Gold Life of Mine Extension Project T

Newmont Boddington Gold Life of Mine Extension Project T

Newmont Boddington Gold Life of Mine Extension Project Environmental Management Plan (EMP) Prepared for Newmont Boddington Gold Pty Ltd by Strategen August 2013 Newmont Boddington Gold Life of Mine Extension Project Environmental Management Plan (EMP) Strategen is a trading name of Strategen Environmental Consultants Pty Ltd Level 2, 322 Hay Street Subiaco WA ACN: 056 190 419 August 2013 Disclaimer and Limitation This report has been prepared for the exclusive use of the Client, in accordance with the agreement between the Client and Strategen (“Agreement”). Strategen accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any person who is not a party to the Agreement. In particular, it should be noted that this report is a qualitative assessment only, based on the scope of services defined by the Client, budgetary and time constraints imposed by the Client, the information supplied by the Client (and its agents), and the method consistent with the preceding. Strategen has not attempted to verify the accuracy or completeness of the information supplied by the Client. Copyright and any other Intellectual Property arising from the report and the provision of the services in accordance with the Agreement belongs exclusively to Strategen unless otherwise agreed. This document may not be reproduced or disclosed to any person other than the Client without the express written authority of Strategen unless the document has been released for referral and assessment of proposals. Client: Newmont Boddington Gold Pty Ltd Revision Strategen Submitted to Client Report Version Purpose No. author/reviewer Form Date Preliminary Draft Report Rev A For client review, C Ellis, R Chesney, Electronic 17/01/2013 excluding M Brook groundwater and surface water Draft Report Rev B For client review C Ellis, M Brook Electronic 1/02/2013 Draft Report Rev 0 Submission with C Ellis, M Brook Electronic 1/02/2013 PER to EPA Revised Draft Report Rev C For client review C Ellis, M Brook Electronic 22/04/2013 Final Draft Report Rev D For client review C Ellis, M Brook Electronic 21/05/2013 Final Draft Report Rev E For client review A Welker, J Mitchell Electronic 4/06/2013 Final Report Rev F For client review A Welker, J Mitchell Electronic 24/06/2013 Report to EPA Rev 1 Submission with M Brook Electronic 27/06/2013 PER to EPA Report to EPA Rev 2 Submission with M Brook Electronic 07/08/2013 PER to EPA Newmont Boddington Gold Life of Mine Extension Project Table of contents 1. Introduction 1 1.1 Background 1 1.1.1 Description of the proposal 1 1.2 Purpose and Scope 1 1.2.1 Potential Impacts Requiring Management 2 1.2.2 Management plans and documents 2 1.3 Environmental setting 2 1.4 Relevant legislation and policy 4 1.4.1 Project specific requirements 5 2. Management framework 8 2.1 Management and document structure 8 2.2 Responsibility and accountability 8 2.3 Communications and training 8 2.3.1 Internal communications 8 2.3.2 External communications 9 2.3.3 Induction and training 10 2.4 Stakeholder consultation 11 2.5 Performance review and continuous improvement 11 2.5.1 Monitoring 11 2.5.2 Reporting 12 3. Groundwater Quality Management Plan 14 3.1 Description 14 3.2 Environmental aspects to be managed 14 3.3 Environmental objectives, targets and performance indicators 14 3.4 Implementation strategy 15 3.4.1 Management actions 15 3.4.2 Monitoring actions 16 3.4.3 Contingency actions 16 4. Adaptive Groundwater Management Plan 18 4.1 Description 18 4.2 Environmental aspects to be managed 18 4.3 Environmental objectives, targets and performance indicators 18 4.4 Implementation strategy 18 4.4.1 Management actions 19 4.4.2 Monitoring program 19 4.4.3 Contingency actions 19 5. Surface Water Management Plan 20 5.1 Description 20 5.2 Environmental aspects to be managed 20 5.3 Environmental objectives, targets and performance indicators 20 5.4 Implementation strategy 21 5.4.1 Probabilistic Water Balance Model 21 5.4.2 Hotham River abstraction 22 5.4.3 Sediment control 22 5.4.4 Process water management 23 5.4.5 Management actions 24 5.4.6 Monitoring actions 25 5.4.7 Contingency actions 26 6. Vegetation and Flora Management Plan 27 6.1 Description 27 6.2 Environmental aspects to be managed 27 6.3 Environmental objectives, targets and performance indicators 27 6.4 Implementation strategy 28 6.4.1 Management actions 28 6.4.2 Monitoring actions 29 BGM 11099_01 R008 Rev 2 7-Aug-13 Newmont Boddington Gold Life of Mine Extension Project 6.4.3 Contingency actions 30 7. Terrestrial Fauna Management Plan 31 7.1 Description 31 7.2 Environmental aspects to be managed 31 7.3 Environmental objectives, targets and performance indicators 31 7.4 Implementation strategy 32 7.4.1 Management actions 32 7.4.2 Monitoring actions 34 7.4.3 Contingency actions 34 8. Black Cockatoo Management Plan 35 8.1 Description 35 8.2 Environmental aspects to be managed 35 8.3 Environmental objectives, targets and performance indicators 35 8.4 Implementation strategy 36 8.4.1 Management actions 36 8.4.2 Monitoring actions 38 8.4.3 Contingency actions 38 9. Indigenous Heritage Management Plan 39 9.1 Description 39 9.2 Environmental aspects to be managed 39 9.3 Environmental objectives, targets and performance indicators 39 9.4 Implementation strategy 40 9.4.1 Management actions 41 9.4.2 Monitoring actions 42 9.4.3 Contingency actions 42 10. Noise Management Plan 43 10.1 Description 43 10.2 Environmental aspects to be managed 43 10.3 Environmental objectives, targets and performance indicators 43 10.4 Implementation strategy 44 10.4.1 Management actions 44 10.4.2 Monitoring actions 44 10.4.3 Contingency actions 45 11. Air Quality Management Plan 46 11.1 Description 46 11.2 Environmental aspects to be managed 46 11.3 Environmental objectives, targets and performance indicators 47 11.4 Implementation strategy 47 11.4.1 Management actions 47 11.4.2 Monitoring actions 48 11.4.3 Contingency actions 48 12. References 50 BGM 11099_01 R008 Rev 2 7-Aug-13 Newmont Boddington Gold Life of Mine Extension Project List of tables Table 1 Australian Government and Western Australian government legislation relevant to environmental management 4 Table 2 Historical environmental assessment approvals 5 Table 3 Required reports 12 Table 4 Environmental objectives, targets and performance indicators for groundwater management 15 Table 5 Management actions required to achieve targets for groundwater quality management 15 Table 6 Monitoring actions for groundwater quality management 16 Table 7 Contingency actions for groundwater quality management 17 Table 8 Environmental objectives, targets and performance indicators for groundwater management 18 Table 9 Management actions required to achieve targets for adaptive groundwater management plan 19 Table 10 Monitoring actions for adaptive groundwater management plan 19 Table 11 Environmental objectives, targets and performance indicators for surface water management 21 Table 12 Management actions required to achieve targets for surface water management 24 Table 13 Monitoring actions for surface water 25 Table 14 Contingency actions for surface water management 26 Table 15 Environmental objectives, targets and performance indicators for vegetation and flora management 28 Table 16 Management actions required to achieve targets for flora and vegetation management 28 Table 17 Monitoring actions for flora and vegetation 29 Table 18 Contingency actions for flora and vegetation management 30 Table 19 Environmental objectives, targets and performance indicators for terrestrial fauna management 32 Table 20 Management actions required to achieve targets for terrestrial fauna management 33 Table 21 Monitoring actions for fauna 34 Table 22 Contingency actions for terrestrial fauna management 34 Table 23 Environmental objectives, targets and performance indicators for black cockatoo management 36 Table 24 Management actions required to achieve targets for black cockatoo management 37 Table 25 Monitoring actions for black cockatoo management 38 Table 26 Contingency actions for black cockatoo management 38 Table 27 Environmental objectives, targets and performance indicators for Aboriginal heritage management 40 Table 28 Management actions required to achieve targets for the management of Aboriginal heritage 41 Table 29 Monitoring actions for Aboriginal heritage 42 Table 30 Contingency actions for Aboriginal heritage 42 Table 31 Environmental objectives, targets and performance indicators for the mineral waste management 43 Table 32 Management actions required to achieve targets for noise management 44 Table 33 Monitoring actions for noise 45 Table 34 Contingency actions for noise management 45 Table 35 Environmental objectives, targets and performance indicators for air quality management 47 Table 36 Management actions required to achieve targets for the management of ambient air quality 47 Table 37 Monitoring actions for air quality 48 Table 38 Contingency actions for waste 49 List of figures Figure 1 Location of Newmont Boddington Goldmine 6 Figure 2 Indicative layout 7 BGM 11099_01 R008 Rev 2 7-Aug-13 Newmont Boddington Gold Life of Mine Extension Project 1. Introduction 1.1 Background The Proponent, Newmont Boddington Gold Pty Ltd (NBGPL) proposes to extend the life of the existing Newmont Boddington Goldmine (NBG). NBG is located in the Shire of Boddington, approximately 12 km northwest of the town of Boddington and 120 km southeast of Perth, Western Australia. The mine is situated in the Darling Range, within the catchment of Thirty Four Mile Brook (Figure 1). The gold and copper mining operations at Boddington first commenced operations in 1987, with mining of the shallower oxide material. The operations entered care and maintenance in 2001. Following a feasibility study, mining operations recommenced in 2006, involving the basement ore-mining phase, with an anticipated 15 – 20 year mine life.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    58 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us