PASCO COUNTY, FLORIDA I-75 and Overpass Road Interchange 2018

PASCO COUNTY, FLORIDA I-75 and Overpass Road Interchange 2018

2018 BUILD APPLICATION APPLICATION INFORMATION Type of Application: Capital Location: Pasco County, FL Urban Areas: Tampa Bay Metropolitan Area Amount Requested: $15.1 Million PASCO COUNTY, FLORIDA I-75 and Overpass Road Interchange PASCO COUNTY I-75 and Overpass Road Interchange EXECUTIVE SUMMARY Pasco County, Florida is ambitiously embarking on a journey to become “Florida’s Premier County.” By focusing on the principles of creating a thriving community, enhancing quality of life, stimulating economic growth, and improving organization performance, the agency is poised to take the community to the next level. In order to accomplish this, Pasco County must offer the region a healthy environment for mobility and connectivity. Since 2006, the East Pasco County area has been experiencing a dramatic increase in population and employment which has resulted in congested travel along Interstate 75 (I-75) and particularly at the CR/SR 54 and SR 52 interchanges of I-75. Additionally, this congestion has created negative impacts to Pasco County’s rural areas, specifically the Northeast Pasco Rural Protection District. In order to address these conditions, Pasco County, is pursuing funding for the I-75 and Overpass Road Interchange – a transportation improvement project that will improve mobility, increase accessibility, and afford new opportunities for economic development. Pasco County and the Metropolitan Planning Organization (MPO) have identified the I-75 and Overpass Road Interchange Project as the number one priority project in Pasco County. Additionally, this project has been endorsed by both the Florida Department of Transportation (FDOT), and the Federal Highway Administration (FHWA). An Interchange Justification Report (IJR) has been developed by the County concurrently with a Project Development and Environment (PD&E) Study. The IJR has been approved by FDOT and FHWA and the PD&E was approved in October 2017. The total project cost is $63.2 million (in 2017 dollar terms). The County has identified $33,045,528 for the project, which is being committed as local match. Additionally, FDOT has committed another $15 million. The region is pursuing $15,172,272 through the BUILD discretionary grant program to support this project. A Benefit-Cost Analysis (BCA) was conducted following BUILD guidelines to compare the benefits and costs associated with the proposed project. Results indicate that the project will yield 2.95 times benefits compared to costs. The project is not only a good use of federal dollars, but also a much needed investment for the mobility, connectivity, and economic vitality of the region. I-75 and Overpass Road Interchange Benefits Quality of Life Environmental Protection Improved Mobility & Access to Parks, $1.6 M Transportation Choices, 28,231 Jobs In Emissions Cost Savings & 5 Secondary Schools Safety Innovation $23.4 M In Accident Cost Savings Design/Build and implementation of FHWA’s 4 State Evacuation Routes Access “Every Day Counts” principles and SMART Goals State of Good Repair Economic Competitiveness $8.3 M 13.9 M VHT Saved & $100.1 M In Travel Time Savings Structure Residual Value 176.4 M VMT Saved & $24.4 M In Vehicle Operating Cost Savings TOTAL PROJECT MONETIZED BENEFITS:$157.8 M (in Present Value Terms) ES-1 Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grant – FY2018 PASCO COUNTY I-75 and Overpass Road Interchange Table of Contents EXECUTIVE SUMMARY ................................................................................................................................. ES-1 SECTION I: PROJECT DESCRIPTION ............................................................................................................... 1 Economic Development ................................................................................................................................................................. 1 Rural Community Benefits ............................................................................................................................................................. 1 Transportation Challenges ............................................................................................................................................................ 2 An Interchange Ready for Implementation ................................................................................................................................... 2 SECTION II: PROJECT LOCATION .................................................................................................................... 3 Area Characteristics ...................................................................................................................................................................... 3 Project Location Transportation Connections ................................................................................................................................. 3 SECTION III: GRANT FUNDS, SOURCES, & USES OF ALL PROJECT FUNDS .............................................. 9 Project Costs ................................................................................................................................................................................. 9 Funding Commitments .................................................................................................................................................................. 9 SECTION IV: MERIT CRITERIA ....................................................................................................................... 11 Safety ......................................................................................................................................................................................... 11 State of Good Repair ................................................................................................................................................................... 14 Economic Competitiveness .......................................................................................................................................................... 14 Environmental Protection ............................................................................................................................................................ 16 Quality of Life ............................................................................................................................................................................. 17 Innovation .................................................................................................................................................................................. 18 Partnership ................................................................................................................................................................................. 20 Non-Federal Revenue for Transportation Infrastructure ............................................................................................................. 21 Results of the Benefit-Cost Analysis - Summary .......................................................................................................................... 21 SECTION V: PROJECT READINESS................................................................................................................. 23 Technical Feasibility .................................................................................................................................................................... 23 Engineering .......................................................................................................................................................................... 23 Financial Feasibility ............................................................................................................................................................. 24 Assessment of Project Risks and Mitigation Strategies ........................................................................................................ 24 Schedule ..................................................................................................................................................................................... 25 Required Approvals .................................................................................................................................................................... 25 NEPA Approval ..................................................................................................................................................................... 25 Permitting ............................................................................................................................................................................ 25 Public Involvement .............................................................................................................................................................. 25 Additional Approvals ........................................................................................................................................................... 26 Federal Wage Rate Certification .................................................................................................................................................. 27 APPENDICES ....................................................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    33 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us