
Midlands Register 2019 HERITAGE AT RISK 2019 / MIDLANDS Contents The Register IV Bassetlaw 73 Broxtowe 77 Content and criteria IV Gedling 78 Key Statistics VI Mansfield 79 Newark and Sherwood 79 Key to the Entries VII Rushcliffe 82 Entries on the Register by local planning IX Rutland (UA) 84 authority Herefordshire, County of (UA) 84 Derby, City of (UA) 1 Shropshire (UA) 95 Derbyshire 2 Amber Valley 2 Staffordshire 111 Bolsover 4 East Staffordshire 111 Chesterfield 5 Lichfield 111 Derbyshire Dales 5 Newcastle-under-Lyme 113 Erewash 7 South Staffordshire 114 High Peak 8 Stafford 115 North East Derbyshire 9 Staffordshire Moorlands 116 Peak District (NP) 10 Tamworth 117 South Derbyshire 10 Stoke-on-Trent, City of (UA) 118 Leicester, City of (UA) 13 Telford and Wrekin (UA) 120 Leicestershire 16 Warwickshire 122 Charnwood 16 North Warwickshire 122 Harborough 18 Nuneaton and Bedworth 125 Hinckley and Bosworth 20 Rugby 125 Melton 21 Stratford-on-Avon 127 North West Leicestershire 25 Warwick 131 Lincolnshire 26 West Midlands 133 Boston 26 Birmingham 133 East Lindsey 28 Coventry 138 Lincoln 36 Dudley 141 North Kesteven 38 Sandwell 143 South Holland 41 Walsall 143 South Kesteven 43 Wolverhampton, City of 145 West Lindsey 48 Worcestershire 147 North East Lincolnshire (UA) 53 Bromsgrove 147 North Lincolnshire (UA) 55 Malvern Hills 148 Northamptonshire 59 Redditch 151 Worcester 151 Corby 59 Wychavon 152 Daventry 59 Wyre Forest 155 East Northamptonshire 62 Kettering 64 Northampton 65 South Northamptonshire 65 Wellingborough 69 Nottingham, City of (UA) 69 Nottinghamshire 72 Ashfield 72 II HERITAGE AT RISK 2019 / MIDLANDS THE REGISTER Many structures fall into the ‘not applicable’ category, The Heritage at Risk Register includes historic for example: ruins, walls, gates, headstones or boundary buildings and sites at risk of being lost through stones. neglect, decay or deterioration. Condition is assessed as ‘very bad’, ‘poor’, ‘fair’ or It includes all types of designated heritage assets, ‘good’. The condition of buildings or structures on including Conservation Areas, which are designated the Register is typically very bad or poor, but can be and assessed by Local Planning Authorities. fair or, very occasionally, good. This reflects the fact that some buildings or structures are vulnerable The aim of the Register is to focus attention on because they are empty, underused or face those places in greatest need. Historic England, in redundancy without a new use to secure their partnership with others, is able to help tackle future. Assessing vulnerability in the case of buildings heritage at risk. We work with owners, friends in fair condition necessarily involves judgement and groups, developers and other stakeholders to find discretion. A few buildings remain on the Register in imaginative solutions for historic places and sites at good condition, having been repaired or mothballed, risk across England. but still awaiting a new use or occupancy. More information about our role, the advice and Buildings or structures are removed from the funding available, and useful publications and Register when they are fully repaired/consolidated, guidance is available on our website. and their future secured either through occupation and use, or through the adoption of appropriate Criteria for inclusion management. on the Register PLACES OF WORSHIP To be considered for inclusion on the Register, places RISK ASSESSMENTS of worship must be listed grade I, grade II* or grade II on the National Heritage List for England, and be used Heritage assets included on the Register are assessed as a public place of worship at least six times a year. according to the nature of the site. The risk assessment methodologies outlined below are based Places of worship are assessed on the basis of on factors which can threaten the different types of condition only. If a place of worship is in very bad or heritage assets and lead to them becoming at risk. poor condition, it is added to the Register. This includes places of worship which are generally in fair BUILDINGS AND STRUCTURES or good condition but have major problems with one key element, like the tower. To be considered for inclusion on the Register, buildings or structures must be: Once on the Register, places of worship can move through the condition categories (e.g. from very bad • listed on the National Heritage List for England; to poor, to fair, even good) as repairs are and implemented and the condition improves, until they • in secular (non-worship) use. are fully repaired and can be removed from the And either: Register. This means that there are some places of • a grade I or II* listed building, or worship in good condition on the Register but with • a grade II listed building in London, or outstanding issues still to be resolved at the time when • a structural scheduled monument with they were assessed. upstanding remains. ARCHAEOLOGY Buildings or structures are assessed on the basis of condition and, where applicable, occupancy (or use) To be considered for inclusion on the Register, reflecting the fact that a building which is occupied archaeological sites must be listed as scheduled is generally less vulnerable than one that is not. monuments and included on the National Heritage List for England. Occupancy (or use) is assessed as ‘vacant’, ‘part- occupied’, ‘occupied’, ‘not applicable’, or occasionally, Archaeology assessments cover scheduled ‘unknown’. earthworks and buried archaeology. III HERITAGE AT RISK 2019 / MIDLANDS The risk assessment is based on their condition and Wreck sites are assessed based on their current vulnerability, the trend in their condition, and their condition, vulnerability and the way they are being likely future vulnerability. A site’s condition is managed. expressed in terms of the scale and severity of adverse effects on it, ranging from ‘extensive Wrecks are vulnerable to both environmental and significant problems’ to ‘minor localised problems’. human impacts. Risks that contribute to inclusion on the Register range from unauthorised access to Archaeological entries are removed from the erosion and fishing damage. The monitoring process Register once sufficient progress has been made to ensures that the significance of the site is identified address the identified issues, and a significant and maintained. In spite of the inherent difficulties in reduction in the level of risk has been demonstrated. caring for this type of site, careful management must be maintained. PARKS AND GARDENS Wrecks are removed from the Register once an To be considered for inclusion on the Register, parks appropriate management and monitoring regime and gardens must be listed as grade I, grade II* or is operational. grade II and included on the National Heritage List for England. Parks and gardens are assessed in terms of CONSERVATION AREAS condition and vulnerability. Steps being taken by owners to address problems are also taken into Once a year Historic England asks every local consideration. authority in England to consider the state of its conservation areas and fill in (and update as Parks and gardens assessed as being at risk are typically appropriate) risk assessment questionnaires for affected by development and neglect. They have those that cause concern, or are believed to no frequently been altered by development or are faced longer be at risk. with major change. The original function of these landscapes has often changed and divided ownership Conservation areas that are deteriorating, or are in leads to the loss of their cohesive historic design. very bad or poor condition and not expected to change significantly in the next three years, are Park and garden entries are removed from the defined as being at risk. Register once steps have been taken to address issues and positive progress is being made. The approach taken to assess conservation areas at risk has been refined since the first survey in 2008/2009. An BATTLEFIELDS overall category for condition, vulnerability and trend is included for each conservation area on the Heritage at To be considered for inclusion on the Register, Risk Register. Conservation areas identified as at risk in battlefields must be listed and included on the 2009, but not reassessed since using the revised National Heritage List for England. Battlefields methodology, are included on the Register but with deemed to be at risk of loss of cultural significance limited information. are included on the Register. Conservation areas are removed from the Register The principal risks and threats are: once plans have been put in place to address the • development pressure e.g. issues that led to the conservation area being at risk, encroachment of buildings; and once positive progress is being made. • pressures of particular use within the site e.g. arable cultivation; • damage e.g. unregulated metal detecting. Battlefields are removed from the Register either when damaging activities cease/are managed, or when threats recede due to effective planning. WRECK SITES To be considered for inclusion on the Register, wrecks must be listed and included on the National Heritage List for England. IV HERITAGE AT RISK 2019 / MIDLANDS Key statistics Nationally, damage from arable cultivation is the greatest cause of risk affecting 37.6% of BUILDINGS AND STRUCTURES archaeological entries on the Register. In the Nationally, 748 (3.3%) of grade I and II* Midlands the proportion is 49.4%. listed buildings (excluding places of worship) are on the Register. In the Midlands the PARKS AND GARDENS percentage is 5.2% (192 listed secular buildings). 102(6.1%) of England’s 1,669 registered parks and gardens are on the Register. Of the 302 registered parks and gardens in the 16 building or structure entries have been Midlands, 16 (5.3%) are on the Register. removed from the 2018 Midlands Register because their futures have been secured, and 7 have been added. 2 park and garden entries have been added to the 2018 Register for the Midlands, and none have been removed.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages166 Page
-
File Size-