DEMAND NO.21 - HIGHWAYS and MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways

DEMAND NO.21 - HIGHWAYS and MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 4551 01 102 JA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 4551 CAPITAL OUTLAY ON HILL AREAS 01 Western Ghats 102 Soil and Water Conservation JA Formation of Roads under Western Ghats Development Programme 16 Major Works ( DPC 4551 01 102 JA 16 07 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ... ... 1 ... ... TOTAL - 4551 01 102 JA ... ... 1 ... ... 1 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 01 337 JA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 01 National Highways 337 Road Works JA Original Works 16 Major Works ( DPC 5054 01 337 JA 16 00 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ... ... 1 ... ... Tirunelveli (NH) Division 2. AS / TS / RAS: 4400 Shifting of Electric Poles and Transformers for the work Widening from 44,00 ... 44,00 44,00 1 double lane to 10.0 Metre width in Km 25/0-45/0 and Strengthening and Improvements to wearing surface of Srivilliputhur - Sivakasi - Virudunager - Aruppukottai - Tiruchuli- road. G.O (D) No 62 Highways and Minor Porsts (HV2) Department dated 4.3.2016 64 Lands ( DPC 5054 01 337 JA 64 09 ) Madurai(NH) Division 1. AS / TS / RAS: 154 LAOP Case 58/1987- National Highways - Madurai (NH) Division- 1,54 ... ... 1,54 1 Lands acquired for Widening Of NH 7 in Thadi Kombu Village Dindugul District - Enhanced Compensation. G.O (D) No 93 Highways and Minor Porsts (HV2) Department dated 21.7.2016 TOTAL - 5054 01 337 JA 45,54 ... 44,01 45,54 2 2 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads of Inter State of Economic Importance 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 1. AS / TS / RAS: 9900 Construction of box culverts at Km 18/10,19/8,20/4,20/8(i) 20/8(ii) 99,00 ... ... ... 59,00 21/10,29/2,29/8,29/10 & 31/10 of Maduranthagam-Vennangupattu Road CRF-TN-2016-17-81 2. AS / TS / RAS: 13800 Improvement to Chittor-Tirutani-Renigunda road kanchipadi road 1,38,00 ... ... ... 98,00 km0/0-2/0 CRF-TN-2016-17-113 3. AS / TS / RAS: 18700 Improvements to East Coast Road to Vaswa Samudhram Road km 0/0 1,87,00 ... ... ... 1,47,00 – 2/6 CRF-TN-2016-17-118 4. AS / TS / RAS: 14500 Improvements to Echur Thiruporur Road to Thirunilai Harijan Colony 1,45,00 ... ... ... 1,05,00 Road km 0/0 – 2/0 CRF-TN-2016-17-78 5. AS / TS / RAS: 19300 Improvements to GNT road to Ayyanallur road km0/0-3/0 1,93,00 ... ... ... 1,53,00 CRF-TN-2016-17-77 6. AS / TS / RAS: 25100 Improvements to Km 8/6 of Cuddalore - Thirukovilur - Sankarapuram 2,51,00 ... ... ... 2,11,00 road to Sathankuppam road (via) Thirumanikuzhi road km 0/0 - 5/6. CRF-TN-2016-17-121 7. AS / TS / RAS: 19600 Improvements to Ottivakkam to Manappakkam Road km 0/0 – 2/8 1,96,00 ... ... ... 1,56,00 CRF-TN-2016-17-79 3 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads of Inter State of Economic Importance 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 8. AS / TS / RAS: 30100 Improvements to Periyapattu-Andarmullipallam - Poochimedu road km 3,01,00 ... ... ... 2,61,00 0/0-4/8 CRF-TN-2016-17-74 9. AS / TS / RAS: 64400 Providing CC pavement in Km 50/8-54/0 of Virudhachalam-Ulundurpet- 6,44,00 ... ... ... 6,04,00 Villupuram Road CRF-TN-2016-17-75 10 . AS / TS / RAS: 14000 Strengthening to Chidambaram - Pitchavaram Tourist Centre road km 1,40,00 ... ... ... 1,00,00 10/4 - 13/0 CRF-TN-2016-17-80 11 . AS / TS / RAS: 38400 Strengthening to Keerapalayam - Sethiyathope Road km 5/0 - 12/6 3,84,00 ... ... ... 3,44,00 CRF-TN-2016-17-73 12 . AS / TS / RAS: 123900 Strengthening to Thiruvannamalai Thiyagadurgam road km 19/2 - 39/20 12,39,00 ... ... ... 11,49,00 CRF-TN-2016-17-70 13 . AS / TS / RAS: 104000 Widening from SL to IL Moogilthuraipattu to Thiruvarangam Km 0/0- 10,40,00 ... ... ... 10,00,00 18/8 CRF-TN-2016-17-135 14 . AS / TS / RAS: 24700 Widening single lane to intermediate and strengthening Agaram colony 2,47,00 ... ... ... 2,07,00 – Gangaiyadikuppam road km0/0-3/2 CRF-TN-2016-17-76 4 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads of Inter State of Economic Importance 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 15 . AS / TS / RAS: 31200 Widening single lane to intermediate and strengthening GNT road – 3,12,00 ... ... ... 2,72,00 Agaram colony km0/0-4/0 CRF-TN-2016-17-71 16 . AS / TS / RAS: 45600 Widening to SL to IL Chunambedu – Perumbair road in km 7/2-12/0 4,56,00 ... ... ... 3,66,00 CRF-TN-2016-17-72 17 . AS / TS / RAS: 74000 Improvements in Km.48/0-51/0 & 52/0-58/0 of Cuddalore - 7,40,00 ... ... ... 1 Thirukovilur - Sankarapuram road CRF-TN-2015-863, dt.14.05.15 18 . AS / TS / RAS: 109800 Providing paved shoulders and strengthening in Km 18/0 - 25/0 of 10,98,00 ... ... ... 1 Thandalam - Perambakkam road to Thakolam - Arugilpadi road CRF-TN-2015-874, dt.14.05.15 19 . AS / TS / RAS: 72400 Widening from SL to IL in Km.0/0 - 7/2, 12/0 - 13/0 and 19/0 - 19/8 of 7,24,00 ... ... ... 1 Chunambedu - Perumbair road CRF-TN-2015-882, dt.14.05.15 20 . AS / TS / RAS: 200000 Reconstruction of High level bridge in lieu of existing causeway at 20,00,00 ... ... ... 1 Km.25/2 of Thiruvannamalai - Thiyagadurgam road CRF-TN-2015-893, dt.14.05.15 Vellore (NH) Division 21 . AS / TS / RAS: 107000 Improvement of Gudiyattam- Gadambur- Kailasagiri - Vaniyambadi 10,70,00 ... ... ... 10,30,00 Road Km.22/570- 30/4 & 37/6 - 42/0 CRF-TN-2016-17-116 5 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads of Inter State of Economic Importance 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 22 . AS / TS / RAS: 10000 Improvements for curves at km 3/6 Realignment of Tank Bund 1,00,00 ... ... ... 60,00 Portion at km 13/6 of Tirupattur - Singarapet Road CRF-TN-2016-17-122 23 . AS / TS / RAS: 60000 Improvements of Abdullapuram-Asanampattur-Alangayam-Tirupattur 6,00,00 ... ... ... 5,60,00 road Km 65/0-71/6 CRF-TN-2016-17-85 24 . AS / TS / RAS: 110000 Improvements to Arcot - Kannamangalam Road (SH-129) Km 3/0 - 8/9 11,00,00 ... ... ... 10,60,00 including reconstruction of Culverts at Km 4/2, 4/6, 4/8, 6/8, 8/8 & 8/10 CRF-TN-2016-17-84 25 . AS / TS / RAS: 41000 Improvements to Cheyyar Vandavasi Polur road to Desur road (Via) 4,10,00 ... ... ... 3,70,00 Kuthampattu Kandavaratti Km 0/0-8/2 CRF-TN-2016-17-137 26 . AS / TS / RAS: 32000 Improvements to Ponnur road to Thellar Mazhaiyur road (Via) Kilputhur 3,20,00 ... ... ... 2,80,00 Km 0/0-2/6 & 5/0-8/8 CRF-TN-2016-17-138 27 . AS / TS / RAS: 41000 Improvements to Sembur S.katteri road (via) Theyyar Km 7/0-15/2 4,10,00 ... ... ... 3,70,00 CRF-TN-2016-17-139 28 . AS / TS / RAS: 17000 Junction Improvements at Km 4/4( (Kunnumurinji), Km 10/2(Randam 1,70,00 ... ... ... 1,30,00 ), Km 15/4 (Mangalam ), Km 16/8 (Arpakkam )& Km 17/8 (Vedanthavadi) of Tiruvannamalai Avalurpet road. CRF-TN-2016-17-129 6 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2016 2016-17 2016-17 2017-18 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads of Inter State of Economic Importance 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 29 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    190 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us