Project Design Approvals

Project Design Approvals

PROJECT DESIGN APPROVALS July 1991 - present State/ Total Project Regent's ENR/ Construction Campus Project Name Nonstate Budget Approval CCCI GSF Cost/GSF ($000) Date at Approval BERKELEY Building for Walter A. Haas School of Business NS 45,000 11/15/1990 210,000 161.90 Faculty Housing (Presentation High) NS 8,350 7/18/1991 111,000 Minor Hall NS 8,000 7/18/1991 22,000 249.00 Dwinelle Hall Expansion S 10,330 3/18/1993 5153 71,117 169.66 2100 Channing Student Housing NS 11,700 7/15/1993 5153 63,300 104.93 Law School Expansion and Renovation* NS 12,250 6/15/1995 5595 164,542 60.01 Environment, Health and Safety Facility S & NS 9,589 9/14/1995 5595 23,697 239.44 Silver Laboratory Expansion G & NS 13,870 11/16/1995 5153 42,284 212.54 Lawrence Hall of Science Addition NS 8,000 11/16/1995 5341 27,500 187.27 Haas Pavilion G & NS 39,500 1/16/1997 5817 249,195 126.16 Hearst Memorial Mining Bldg Seism & Prog Imp S & G 67,600 7/17/1997 5734 137,213 330.65 University Village Redevelopment, Step 1 NS 55,400 3/19/1998 6415 432,500 84.34 Seismic Safety Corrections, Wurster Hall S & NS 27,775 3/18/1999 3722 230,028 89.60 Seis. Safety Corr. FEMA Prog Ph 1: Barrows, FEMA,S,NS 24,822 3/16/2000 3909 192,489 97.34 Hildebrand, FEMA,S,NS 34,099 3/16/2000 3909 137,973 108.51 Latimer, FEMA,S,NS 16,485 3/16/2000 3909 183,910 68.65 & Silver Space Sciences Lab FEMA,S,NS 13,837 3/16/2000 3909 45,124 221.10 Seismic Replacement Building 1 S 18,748 9/13/2000 3909 78,615 169.73 Oxford Tract Parking Facility NS 7,145 9/13/2000 3909 64,580 83.62 Central Dining and Office Facility NS 41,593 11/15/2000 4065 90,000 277.33 College-Durant Student Housing NS 11,430 11/15/2000 3909 43,633 161.80 Hargrove Music Library NS 12,219 1/17/2002 4019 288,000 277.50 Stanley Quantitative Biosciences and Bioengineering Facility S 143,296 5/16/2002 4305 285,000 411.00 Channing-Bowditch Housing NS 23,436 5/16/2002 4335 72,522 215.00 Units 1 and 2 Infill Student Housing and Commons Areas NS 123,370 5/16/2002 4335 320,930 260.00 Davis Hall North Replacement Building S & NS 117,650 2/25/2003 4375 144,580 461.00 University Village Redevelopment Step 2 Project NS 118,795 6/30/2004 4300 545,412 132.00 C. V. Starr East Asian Library NS 46,400 3/15/2005 5054 67,000 444.00 Underhill Parking Facility and Field Replacement NS 42,667 7/19/2005 4660 306,000 80.00 Student Athlete High Performance Center NS 111,948 12/5/2006 4948 142,000 597.00 Biomedical & Health Sciences Building S & NS 256,653 5/15/2007 5380 200,000 902.00 Campbell Hall Seismic Replacement Building S & NS 73,224 3/18/2008 5179 81,618 634.00 Helios Energy Research Facility S & NS 198,246 5/13/2008 4890 144,000 898.00 Helios Energy Research Facility - design rescinded and EIR de-certified - - 11/12/2008 - - - Law School Infill NS 90,000 7/15/2008 5199 79,593 705.00 NavalArchitecture Building Restoration and Addition Private donor Private donor 2/3/2009 N/A 23,928 N/A Prepared by Design Construction Services 7/29/2010 Page 1 PROJECT DESIGN APPROVALS July 1991 - present State/ Total Project Regent's ENR/ Construction Campus Project Name Nonstate Budget Approval CCCI GSF Cost/GSF ($000) Date at Approval Anna Head West Student Housing NS 69,870 11/17/2009 5420 138,626 325.00 Helios Energy Research Facility S & NS 143,846 1/19/2010 4890 112,626 809.00 California Memorial Stadium (CMS) Seismic Corrections and West Program Improvements NS 321,000 1/19/2010 5276 405,735 412.00 DAVIS Ambulatory Care/Rehabilitation Project NS 84,150 11/19/1992 363,108 170.27 MED CTR. Facilities Support Services Building NS 8,983 3/19/1992 52,000 118.85 Patient Support Services Building NS 18,440 9/19/1991 51,250 172.83 Parking Structure II NS 12,904 6/16/1994 5621 279,000 33.06 Central Plant Replacement NS 64,562 7/14/1994 5741 54,010 141.92 Tower II NS 155,748 11/17/1994 6319 454,445 218.00 Tower II South Addition NS 27,000 5/14/1998 6584 64,425 296.59 UCDMC Hotel Private developer N/A 7/16/1998 N/A N/A N/A M.I.N.D. Institute S & NS 38,840 5/16/2001 4,075 99,607 254.40 Surgery and Emergency Services Pavilion S & NS 281,277 12/13/2002 4,350 414,930 406.33 Central Plant Phase II NS 12,400 9/4/2003 4,140 N/A N/A Education Building NS 40,311 6/30/2004 4,100 122,022 222.00 Cancer Center Expansion NS 35,400 3/14/2006 4,735 46,415 428.00 Telemedicine Resource Center and Rural Prime Facility S & NS 36,000 1/15/2008 4,890 51,379 404.00 Parking Structure III NS 46,515 9/16/2009 5,502 420,910 80.00 DAVIS Life Science Expansion/Briggs Hall Add. S & NS 29,932 3/18/93 5153 92,430 225.04 Primero Housing Replacement NS 33,627 5/20/93 5614 278,392 77.17 Environmental Design Building S 18,350 7/15/93 5153 90,783 144.51 Center for Comparative Medicine G 15,406 6/16/94 5153 43,509 232.14 Environmental Services Facility S 13,482 7/20/95 5595 44,006 202.00 Not UC funded for Faculty Housing at Aggie Village Private developer N/A 7/20/95 N/A construction Memorial Union Seismic Renovation NS 8,395 1/18/96 5600 44,000 125.00 Equine Analytical Chemistry Laboratory S & NS 11,374 3/14/96 5922 28,015 227.02 Contained Research S & NS 26,508 7/18/96 5595 73,003 253.40 East Hall NS 9,800 7/18/96 5679 46,642 148.32 62,741 Walker Hall Seismic Replacement Facility S & NS 19,462 6/19/97 5734 218.47 Student Apartments Private developer N/A 6/19/97 N/A construction Plant and Environmental Sciences Replcmt Facil S & NS 42,276 7/16/1998 3722 121,064 266.66 La Rue Student Housing Private developer N/A 7/16/1998 N/A N/A N/A Center for the Arts Performance Hall NS 53,500 11/19/1998 4000 100,925 392.98 So. Campus Development: Parking & Roadway Imp NS 19,405 11/19/1998 3936 220,000 40.76 Prepared by Design Construction Services 7/29/2010 Page 2 PROJECT DESIGN APPROVALS July 1991 - present State/ Total Project Regent's ENR/ Construction Campus Project Name Nonstate Budget Approval CCCI GSF Cost/GSF ($000) Date at Approval Veterinary Medicine Lab S & NS 16,596 7/19/2000 3909 47,614 237.79 Genome and Biomedical Sciences Facility G 95,050 11/15/2000 4128 211,334 325.00 DAVIS Activity and Recreation Center NS 46,500 1/17/2001 4153 154,753 202.82 cont'd The Jackson Laboratory JAX West Facility privately funded - 3/15/2001 - 74,000 - Center for Companion Animal Health NS 12,235 3/15/2001 4103 32,668 256.00 USDA Western Human Nutrition Research Center Federally funded 3/15/2001 - 45,000 - Genome Launch Facility NS 9,600 5/16/2001 4019 21,000 311.00 Sciences Laboratory Building S & NS 56,715 7/19/2001 4019 150,966 297.99 Veterinary Medicine 3A S 77,137 7/19/2001 4019 165,583 348.00 Aquatics Center NS 7,300 11/15/2001 4113 21,328 149.05 Segundo Commons Replacement NS 22,843 11/15/2001 4150 45,000 333.60 Segundo Infill Housing NS 29,607 11/15/2001 4158 115,338 191.80 Conference Center, Hotel, and Graduate School of Management NS 35,000 3/14/2002 N/A 163,700 N/A Veterinary Medicine Instructional Facility NS 24,849 9/18/2002 4246 55,390 279.00 Mathematical Sciences Building NS 22,036 12/13/2002 4163 64,400 234.00 West Entry Parking Structure NS 38,502 2/25/2003 4248 499,100 41.00 Tercero Housing and Dining Expansion NS 44,879 4/17/2003 4261 166,116 174.91 Robert Mondavi Institute for Wine and Food Science S & NS 54,800 2/18/2004 4019 129,581 319.00 Multi-Use Stadium NS 29,750 1/18/2005 4286 30,231 223.00 Physical Sciences Expansion S 49,721 3/15/2005 4328 88,362 412.00 King Hall Renovation and Expansion S 21,849 11/14/2006 4632 50,665 309.00 Health and Wellness Center NS 50,300 1/16/2007 4973 75,300 417.00 Veterinary Medicine 3B S & NS 89,032 7/17/2007 4890 118,935 554.00 Tercero South Student Housing Phase II NS 55,168 5/13/2008 5469 155,259 271.19 Los Rios Community College District Davis Center Private developer N/A 2/3/2009 N/A 20,000 N/A Brewery, Winery, and Food Pilot Facilities NS 16,500 2/3/2009 5445 31,800 384.00 IRVINE Humanities/Fine Arts Facilities S 35,154 3/18/1993 5153 134,438 165.33 Social Sciences Unit 2 S & NS 33,770 3/19/1992 148,821 158.57 Environmental Health & Safety Serv.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us