History of LRT in Calgary

History of LRT in Calgary

Investment in infrastructure to support Calgary’s growth History of LRT in Calgary Planning for the Future and Building Today. 1 History of LRT in Calgary • New LRT lines have started in the downtown and built in stages • Since 1978 Calgary has been building LRT • 9 expansions between 1987 – 2015 • Serves over 285,000 daily passengers • Most successful LRT system in North America • 59km and 45 Stations 2 Building on our past success: Red Line Core 1981 12.9 km 15 stations 1 maintenance and storage facility 3 Building on our past success: Blue Line Core 1985 9.8 km 7 stations 1 storage facility (Haysboro) 4 Building on our past success: Red Line Extension 1987 5.8 km 5 stations 5 Building on our past success: Red Line Extension 1990 0.8 km 1 stations 6 Building on our past success: Red Line Extension 2001 3.4 km 2 stations 7 Building on our past success: Red Line Extension 2003 3.0 km 1 stations 8 Building on our past success: Red Line Extension 2004 3.0 km 2 stations 9 Building on our past success: Blue Line Extension 2007 2.8 km 1 stations 1 maintenance and storage facility 10 Building on our past success: Red Line Extension 2008 3.6 km 1 stations 11 Building on our past success: Blue Line Extension 2012 2.9 km 2 stations 12 Building on our past success: Blue Line Extension 2012 8.2 km 7 stations 13 Building on our past success: Red Line Extension 2014 2.0 km 1 stations 14 Building on our past success: Green Line Core 2026 20.0 km 4 stations 1 storage and maintenance facility 15 Evolution of LRT Ridership 59.9km of LRT today serving 285,000 daily Calgary was ready to support rebound with 29.3km of Calgary LRT built began to build LRT 1980s Economic Downturn (10 yrs+) 16 Green Line Stage 1: 16 Avenue N (Crescent Heights) to 26 Avenue SE (Shepard) Planning for the future and building today Today Opening day 17 Planning for the Future Meet Darshan: Meet Erica: 23 year old 6 year old active professional kindergartner 18 Planning for the Future Darshan: Erica: Erica Community: Community: Douglas Glen Crescent Heights Destination: Destination: Downtown via Cultural events 302 BRT throughout the Today’s city Challenge: Today’s Reliability of Challenge: Darshan service, travel Access to time destinations 19 Planning for the Future Darshan’s Commute to Downtown - Douglas Glen to 7 Avenue SW Today’s challenge • Unreliability: traffic, weather • Driving costs: gas, maintenance, parking Current Driving Green Line Green Line benefits • Reliability • Time and cost savings • Mobility choice 20 Planning for the Future Erica 10 years later as a 16 year old teenager Green Line benefits • Increased accessibility to destinations across the city with 80km of LRT • Ability to work anywhere with transit access • Flexibility in not having a vehicle 21 Benefits of Stage 1 of the Green Line? 22.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us