Table 2: Long-Term CSO Control Plan by Receiving Water

Table 2: Long-Term CSO Control Plan by Receiving Water

Massachusetts Water Resources Authority Combined Sewer Overflow Control Plan Annual Progress Report 2015 Table 2: Long-Term CSO Control Plan by Receiving Water CSO Discharge Goals (Typical Year Rainfall) Capital Cost* Receiving Water Projects* Volume (millions) Activations (million gallons) Alewife Brook/Upper 7 untreated 7.3 • Cambridge/Alewife Sewer Separation $ 108.3 Mystic River • MWR003 Gate and Rindge Siphon Relief and 3 treated @ 3.5 • Interceptor Connections Upgrades Somerville • Connection/Floatables at Outfall SOM01A Marginal • Somerville Baffle Manhole Separation • Cambridge Floatables Control (portion) Mystic River/Chelsea 4 untreated 1.1 • Somerville Marginal CSO Facility Upgrade 92.0 Creek Confluence and • Hydraulic Relief at BOS017 Chelsea Creek and 39 treated 57.1 • BOS019 Storage Conduit @ Somerville • Chelsea Trunk Sewer Replacement Marginal • Chelsea Branch Sewer Relief • CHE008 Outfall Repairs • East Boston Branch Sewer Relief (portion) Charles River 3 untreated 6.8 • Cottage Farm CSO Facility Upgrade 88.8 (including Stony • Stony Brook Sewer Separation Brook and Back Bay and 2 treated @ 6.3 • Hydraulic Relief at CAM005 Fens) Cottage Farm • Cottage Farm Brookline Connection and Inflow Controls • Brookline Sewer Separation • Bulfinch Triangle Sewer Separation • MWRA Outfall Closings and Floatables Control • Cambridge Floatables Control (portion) Inner Harbor 6 untreated 9.1 • Prison Point CSO Facility Upgrade 47.5 • Prison Point Optimization and 17 treated 243.0 • East Boston Branch Sewer Relief (portion) @ Prison Point Fort Point Channel 3 untreated 2.5 • Union Park Treatment Facility 62.4 • BOS072-073 Sewer Separation and System and 17 treated 71.4 Optimization @ Union Park • BWSC Floatables Control • Lower Dorchester Brook Sewer Modifications Constitution Beach Eliminate • Constitution Beach Sewer Separation 3.7 North Dorchester Bay Eliminate • N. Dorchester Bay Storage Tunnel and Related 253.8 Facilities • Pleasure Bay Storm Drain Improvements • Morrissey Blvd Storm Drain Reserved Channel 3 untreated 1.5 • Reserved Channel Sewer Separation 70.6 South Dorchester Bay Eliminate • Fox Point CSO Facility Upgrade (interim) 126.8 • Commercial Pt. CSO Facility Upgrade (interim) • South Dorchester Bay Sewer Separation Neponset River Eliminate • Neponset River Sewer Separation 2.5 Regional • Planning, Technical Support and Land Acquisition 50.3 TOTAL 410 $ 906.6 Treated Portion 381 *Floatables controls are recommended at remaining outfalls and are included in the listed projects and capital budgets. 19 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us