![Final COV Specifications Ver 2007.2](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
TABLE OF CONTENTS CITY OF VICTORIA STANDARD SPECIFICATIONS TITLE DIVISION 01 Section 01010 - Summary of Work Section 01015 - Contractor Use of Premises Section 01025 - Measurement and Payment Section 01035 - Change Order Procedures Section 01040 - Coordination and Meetings Section 01045 - Cutting and Patching Section 01050 - Field Surveying Section 01090 - Reference Standards Section 01300 - Submittals Section 01380 - Construction Photographs Section 01410 - Testing Laboratory Services Section 01420 - Inspection Services Section 01500 - Temporary Facilities and Controls Section 01505 - Mobilization Section 01526 - Trench Safety System Section 01535 - Tree and Plant Protection Section 01563 - Control of Ground Water and Surface Water Section 01564 - Waste Material Disposal Section 01566 - Source Controls for Erosion and Sedimentation Section 01567 - Filter Fabric Fence Section 01568 - Reinforced Filter Fabric Barrier Section 01569 - Stabilized Construction Exit Section 01570 - Traffic Control and Regulation Section 01630 - Product Options and Substitutions Section 01700 - Contract Closeout Section 01720 - Project Record Documents DIVISION 02 Section 02100 - Right-of-Way Preparation Section 02221 - Embankment Section 02225 - Roadway Excavation Section 02227 - Excavation and Backfill for Utilities Section 02229 - Utility Backfill Materials Section 02230 – Proof Rolling Section 02231 - Crushed Stone Flexible Base Course Section 02233 - Cement Stabilized Base Course Section 02234 - Recycled Crushed Concrete Base Section 02235 - Flexible Base Section 02238 - Hot Mix Asphaltic Base Course Section 02241 - Lime Stabilized Subgrade Section 02252 - Cement Stabilized Sand 4/07 Table of Contents-1 Page 1 of 3 TABLE OF CONTENTS CITY OF VICTORIA STANDARD SPECIFICATIONS TITLE Section 02316 - Pipe and Casing Augering Section 02317 - Augering Pipe for Water Lines Section 02510 - Asphaltic Concrete Pavement Section 02514 - Recycling Existing Aggregate (Street Reclaiming) Section 02516 - Surface Treatments Section 02520 - Continuously Reinforced Concrete Paving Section 02521 - Concrete Paving Section 02523 - Concrete Joints Section 02525 - Concrete Pavement Curing Section 02530 - Concrete Sidewalks Section 02531 - Concrete Driveways Section 02532 - Curb, Curb & Gutter, & Headers Section 02570 - Pavement Repair and Resurfacing Section 02581 - Blast Cleaning of Pavement Section 02582 - Preformed Durable Pavement Marking Section 02583 - Raised Reflective Pavement Markers Section 02590 - Temporary and Removable Reflectorized Pavement Markings Section 02591 - Reflectorized Pavement Marking Section 02592 - Raised Pavement Markers Section 02600 - Cast-in-Place Manholes & Junction Boxes Section 02601 - Precast Concrete Manholes Section 02602 - Fiberglass Manholes Section 02603 - Frames, Grates, Rings, and Covers Section 02604 - Valve Boxes, Meter Boxes, and Meter Vaults Section 02605 - Cast-in-Place Inlets, Headwalls, and Wingwalls Section 02606 - Precast Concrete Inlets, Headwalls, and Wingwalls Section 02607 - Adjusting Manholes, Inlets, and Valve Boxes to Grade Section 02610 - Ductile Iron Pipe and Fittings Section 02612 - Copper Tubing Section 02615 - Reinforced Concrete Pipe Section 02616 - Monolithic Reinforced Concrete Box Sewer Section 02617 - Precast Reinforced Concrete Box Sewers Section 02618 - Centrifugally Cast Fiberglass Pipe Section 02619 - High Density Polyethylene (HDPE) Solid Wall Pipe Section 02620 - PVC Pipe Section 02626 - Tapping Sleeves and Valves Section 02629 - Polyurethane Coatings on Steel or Ductile Iron Pipe Section 02630 - Polyethylene Wrap Section 02640 - Gate Valves Section 02642 - Air Release and Vacuum Relief Valves Section 02643 - Pressure Reducing Valves Section 02645 - Fire Hydrant Assembly Section 02664 - Water Mains Section 02665 - Water Tap and Service Line Installation 4/07 Table of Contents-2 Page 2 of 3 TABLE OF CONTENTS CITY OF VICTORIA STANDARD SPECIFICATIONS TITLE Section 02667 - Wet Connections Section 02669 - Cut, Plug and Abandonment of Mains Section 02675 - Disinfection of Waterlines Section 02676 - Hydrostatic Testing of Pipelines Section 02720 - Storm Sewers Section 02730 - Gravity Santary Sewer Section 02731 - Sanitary Sewage Force Mains Section 02732 - Acceptance Testing for Sanitary Sewers Section 02752 - Plastic Liner for Concrete Sewer Structures Section 02762 - Sanitary Sewer Service Stubs or Reconnections Section 02765 - Abandonment of Sanitary Sewers Section 02800 - Installation of Traffic Signals Section 02801 - Vehicle Loop Detectors and Lead-in Cables Section 02802 - Installation of Pedestrian Pushbuttons Section 02803 - Traffic Signal Conduit, Cabinet Foundations, Ground Boxes and Installation Procedures Section 02804 - Multi- and Single-Conductor Traffic Signal Cable and Wire Section 02811 - Landscape Irrigation Section 02831 - Chain Link Fences and Gates Section 02901 - Landscape Planting Section 02920 - Topsoil Section 02932 - Hydromulch Seeding Section 02935 - Sodding Section 02953 - Trees and Shrubs DIVISION 03 Section 03100 - Concrete Formwork Section 03210 - Reinforcing Steel Section 03240 - Fibrous Reinforcing Section 03250 - Joints in Concrete Structures Section 03305 - Concrete for Utility Construction and Minor Paving Section 03310 - Structural Concrete Section 03311 - Seal Slabs Section 03345 - Concrete Finishing Section 03370 - Concrete Curing Section 03600 - Structural Grout Section 03700 - Concrete Repair and Rehabilitation 4/07 Table of Contents-3 Page 3 of 3 SECTION 01010 CITY OF VICTORIA STANDARD SPECIFICATIONS SUMMARY OF WORK ************************************************************************************************************************ RELATED SECTIONS - For use by Specifier. Do not include list in Project Specifications. Section 01015 - Contractor Use of Premises. Section 01040 - Coordination and Meetings: Contractor coordination of Work Section 01300 - Submittals ************************************************************************************************************************ ************************************************************************************************************************ This section must be prepared for each project. The text gives standard provisions, as they may be appropriate to an individual Project. Edit this text for Project requirements and provide additional text or delete text as appropriate renumbering paragraphs as necessary. ************************************************************************************************************************ PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Summary of the Work including work by Owner, Owner furnished products, Work sequence, future Work, Contractor use of Premises, and Owner occupancy. 1.02 WORK COVERED BY CONTRACT DOCUMENTS A. Work of the contract is for the [construction] [rehabilitation] [alteration] [demolition] [__________________] of [________________________]. 1.03 ALTERNATES A. Alternate bids quoted on Bid Forms will be reviewed and accepted or rejected at Owner’s option. B. Volunteer Alternates, any Alternate not specified in this Section, will not be considered. C. Accepted Alternates will be identified in the Agreement Between the Owner and Contractor. D. Bids will be evaluated on base bid price. After determination of lowest bidder, consideration will be given to Alternates and Bid Price adjustments. E. Description of Alternates: 1. Alternate No. 1: [______________________________________________]: Base Bid Item: Specification Sections [_____], [_____], and [_____] [_______]; and Drawings Numbered [_____], [_____], and [_____]; including referenced details. Alternate Item: Specification Sections [_____], [_____], and [_____] [_____]; and Drawings Numbered [_____], [_____], and [_____]; including referenced details. 2. (Continue listing of Alternates as appropriate. Delete if no alternates.) 1.04 WORK BY OWNER ************************************************************** Identify ‘NIC’ Work and coordinate the following with Engineer. Delete if not applicable. ************************************************************** A. Items noted as Not in Contract (NIC), [______] will be furnished and installed by Owner [beginning] [before] [after] [_________________]. B. Owner will remove and retain possession of the following items prior to start of work: 1. [____________________________]. 2. [____________________________]. 8/01 01010-1 Page 1 of 3 SECTION 01010 CITY OF VICTORIA STANDARD SPECIFICATIONS SUMMARY OF WORK 1.05 OWNER FURNISHED PRODUCTS A. Products purchased and paid for by Owner: 1. [____________________________]. 2. [____________________________]. B. Items Furnished by Owner for Installation and Final Connection by Contractor: 1. [_______________________________]. C. Contractor’s Responsibilities: 1. Arrange and pay for product delivery to site. 2. Receive and unload products at site; jointly with Engineer, inspect for completeness or damage. 3. Handle, store, install, and finish products. 4. Repair or replace damaged items. D. CONSTRUCTION PHOTOGRAPHS 1. Submit preconstruction (and post construction) photographs in accordance with Section 01380. 1.06 WORK SEQUENCE A. Construct Work in [stages] [phases] [to accommodate Owner occupancy requirements] [_________________] during the construction period, coordinate construction schedule and operations with Engineer: 1. [Stage] [Phase] 1: [_________________]. 2. [Stage] [Phase] 2: [_________________]. 3. [Stage] [Phase] 3: [_________________]. B. Coordination of the Work: Refer to Section 01040 - Coordination
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages429 Page
-
File Size-