Residence Inn Hotel Aurora, CO Traffic Impact Study

Residence Inn Hotel Aurora, CO Traffic Impact Study

Residence Inn Hotel Aurora, CO Traffic Impact Study Prepared For: Shiva Investments LLC 800 S. Abilene Street Aurora, CO 80012 City of Aurora Public Works Department 15151 E. Alameda Parkway, Suite 3200 Aurora, CO 80012 Prepared By: JR Engineering, LLC 7200 S. Alton Way, C400 Centennial, CO 80112 Contact: Eli Farney, PE, PTOE August 24, 2018 Residence Inn Hotel Aurora, CO Table of Contents Section 1: Introduction ........................................................................................................ 1 Section 2: Existing Conditions............................................................................................ 1 Proposed Zoning ............................................................................................................. 2 Study Area Boundaries ................................................................................................... 4 Existing Roadway and Transportation Network Description ......................................... 4 Data Collection ............................................................................................................... 5 Section 3: Proposed Conditions .......................................................................................... 7 Trip Generation ............................................................................................................... 7 Project Trip Distribution ................................................................................................. 7 Project Trip Assignment ................................................................................................. 8 Developer Committed Network ...................................................................................... 8 Section 4: Future Conditions ............................................................................................ 12 Background Traffic ....................................................................................................... 12 Total Traffic .................................................................................................................. 12 Section 5: Evaluation ........................................................................................................ 17 Level of Service ............................................................................................................ 17 Analyses of Existing Conditions ............................................................................... 17 Analyses of Year 2020 .............................................................................................. 19 Analyses of Year 2040 .............................................................................................. 20 Traffic Control Devices ................................................................................................ 22 Queuing ......................................................................................................................... 22 Safety ............................................................................................................................ 24 Intersection Sight Distance ....................................................................................... 24 Pedestrians ................................................................................................................ 24 Section 6: Conclusion/Recommendations ........................................................................ 25 Trip Generation, Distribution and Assignment ............................................................. 25 Traffic Operations and Project Impacts ........................................................................ 25 Existing Conditions and Year 2020 .......................................................................... 25 Year 2040 .................................................................................................................. 25 Recommendations ......................................................................................................... 25 List of Figures Figure 1 – Vicinity Map ...................................................................................................... 3 Figure 2 – Existing (2018) Traffic and Lane Geometry ..................................................... 6 Figure 3 – Directional Distribution of Site-Generated Traffic ......................................... 10 Figure 4 – Assignment of Site Generated Traffic ............................................................. 11 Figure 5 – Year 2020 Background Traffic ........................................................................ 13 Figure 6 – Year 2040 Background Traffic ........................................................................ 14 Figure 7 – Year 2020 Opening Day Traffic ...................................................................... 15 Figure 8 – Year 2040 Total Traffic ................................................................................... 16 Figure 9 – Recommended Traffic Control Devices .......................................................... 23 Traffic Impact Study Page i Residence Inn Hotel Aurora, CO List of Tables Table 1 – Trip Generation Table ......................................................................................... 9 Table 2 – Signalized Intersection ...................................................................................... 17 Table 3 – TWSC Intersection ........................................................................................... 18 Table 4 – LOS for Existing Conditions and Year 2020 .................................................... 19 Table 5 – LOS for Year 2040 ........................................................................................... 21 Appendices Appendix A: Traffic Counts and Signal Timing Appendix B: HCM 2010 Level of Service Reports Appendix C: Detailed Land Use Reports Appendix D: Queuing Reports Appendix E: Preliminary Site Plan Traffic Impact Study Page ii Residence Inn Hotel Aurora, CO Section 1: Introduction JR Engineering (JR) has completed a review of the traffic impacts of the proposed Residence Inn Hotel located near the northeast corner of the S. Abilene Street and E. Yale Avenue intersection in Aurora, Colorado. The purpose of this traffic impact study (TIS) is to assess the short-term and long-term effects of the proposed development project on both the local and regional transportation system. The Residence Inn Hotel project site is located within the southwest 1/4 of Section 30 of Township 4 South, Range 66 West, 6th Principal Meridian, City of Aurora, County of Arapahoe, and State of Colorado. The site is located between S. Abilene Street and S. Anaheim Street. Interstate 225 is located to the west of the site, a United States Postal Service (USPS) office to the north, and the St. Andrews Village retirement community to the south and east. The project site encompasses approximately 2.0 acres. The site is proposed to be developed into a single hotel with 102 rooms and 88 vehicular parking stalls. The preliminary site plan is included in Appendix E. The developer anticipates starting construction in 2019, and the hotel would open in 2019 or 2020. Access to the site is proposed in two locations, both located off S. Abilene Street. The northern access point will be referred to as “A1” in this study and will be restricted to a right-in/right-out (RIRO). The southern access point will be referred to as “A2” in this study and will be full movement. The access spacing between A1 and A2 is approximately 400 feet. The remainder of this report presents our findings concerning the traffic impacts of the proposed Residence Inn Hotel project. The existing, one year after completion of the development and Year 2040 will be evaluated in this study. Section 2: Existing Conditions The vicinity map is shown in Figure 1. The existing site is comprised of vacant land with minimal vegetation. A sidewalk with pedestrian lighting runs along the west side of the property. The sidewalk is attached to S. Abilene Street. The existing ground is minimally vegetated with native seeding. The soils are described as Blakeland Loamy Sand (BoD2) by the NRCS soil survey. The soils are all part of Hydrologic Soil Group A. The site slopes average from 1% to 9%. The site drains generally to the north and northeast. The surrounding area is similar to the project site and includes primarily existing buildings, paved areas and minimally-landscaped areas. A USPS office and 2-10 Home Buyers Warranty corporate office are located to the north, and the St. Andrews Village retirement community is located to the south and east. Traffic Impact Study Page 1 Residence Inn Hotel Aurora, CO Proposed Zoning The zoning for the property is B-3, which is a Highway Service District and is located within the Iliff Station Area Plan. The proposed use is permitted by the current zoning but subject to City of Aurora (City) Site Plan approval. Traffic Impact Study Page 2 Project Site A Westrian Company Residence Inn Hotel Aurora, CO Study Area Boundaries The City requested that the following intersections be analyzed in this study: • E. Iliff Avenue and S. Blackhawk Street • E. Yale Avenue and S. Abilene Street • S. Abilene Street and Project Site Access 1 • S. Abilene Street and Project Site Access 2 As previously discussed, the project site is located between S. Abilene Street and S. Anaheim Street. S. Abilene Street is located to the west of the site, a USPS office to the north, and the

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us