A Monte Carlo Simulation Approach to the Reliability Modeling of the Beam Permit System of Relativistic Heavy Ion Collider (Rhic) at Bnl* P

A Monte Carlo Simulation Approach to the Reliability Modeling of the Beam Permit System of Relativistic Heavy Ion Collider (Rhic) at Bnl* P

Proceedings of ICALEPCS2013, San Francisco, CA, USA MOPPC075 A MONTE CARLO SIMULATION APPROACH TO THE RELIABILITY MODELING OF THE BEAM PERMIT SYSTEM OF RELATIVISTIC HEAVY ION COLLIDER (RHIC) AT BNL* P. Chitnis#, T.G. Robertazzi, Stony Brook University, Stony Brook, NY 11790, U.S.A. K.A. Brown, Brookhaven National Laboratory, Upton, NY 11973, U.S.A. Abstract called the Permit Carrier Link, Blue Carrier Link and The RHIC Beam Permit System (BPS) monitors the Yellow Carrier link. These links carry 10 MHz signals health of RHIC subsystems and takes active decisions whose presence allows the beam in the ring. Support regarding beam-abort and magnet power dump, upon a systems report their status to BPS through “Input subsystem fault. The reliability of BPS directly impacts triggers” called Permit Inputs (PI) and Quench Inputs the RHIC downtime, and hence its availability. This work (QI). If any support system PI fails, the permit carrier assesses the probability of BPS failures that could lead to terminates, initiating a beam dump. If QI fails, then the substantial downtime. A fail-safe condition imparts blue and yellow carriers also terminate, initiating magnet downtime to restart the machine, while a failure to power dump in blue and yellow ring magnets. The carrier respond to an actual fault can cause potential machine failure propagates around the ring to inform other PMs damage and impose significant downtime. This paper about the occurrence of a fault. illustrates a modular multistate reliability model of the Other than PMs, BPS also has 4 Abort Kicker Modules BPS, with modules having exponential lifetime (AKM) that see the permit carrier failure and send the distributions. The model is based on the Competing Risks beam dump signals to Beam Abort System. The magnet Theory with Crude Lifetimes, where multiple failure dump is initiated by terminating the power supply modes compete against each other to cause a final failure, interlocks at individual PM location. The table shows the and simultaneously influence each other. It is also variants of the modules in BPS. dynamic in nature as the number of modules varies based on the fault trigger location. The model is implemented as Table 1: BPS Modules a Monte Carlo simulation in Java, and analytically validated. The eRHIC BPS will be an extension of RHIC Modules Number BPS. This analysis will facilitate building a knowledge Permit Module: Master (PM:M) 1 base rendering intelligent decision support for eRHIC BPS design. Permit Module: Slave with Quench detection 13 inputs (PM:SQ) INTRODUCTION Permit Module: Slave with No Quench detection 18 The peak energy stored in RHIC (Relativistic Heavy inputs (PM:SNQ) Ion Collider at BNL) in the form of beams and magnet Permit Module: Slave without any support system 1 current is about 72 MJ [1]. BPS is an important element input (PM:S) of the machine protection system and consistently observes the health of RHIC support systems like power Abort Kicker Module (AKM) 4 supplies, cryogenics, beam loss monitors, access controls, quench detection, vacuum etc. Upon sensing an anomaly, it is responsible for taking action for the safe disposal of RELIABILITY THEORY this energy [2]. Reliability [3] is the probability that a system will The BPS protects equipment and personnel from perform a required function under stated conditions for a dangerous fault consequences. The reliability of BPS thus specified period of time. The variable of interest is the directly impacts the reliability of RHIC. Hence, there is system lifetime, which depends upon its components’ an inherent need for high reliability of a safety critical lifetimes. The lifetimes are related to the Hazard system like BPS. The aim of this work is to calculate the Rate/Failure Rate, which represents number of failures probability of dangerous failures, which can lead to per unit time. The Bathtub curve [4] is generally used to significant downtime of the collider. model the lifetimes. The intrinsic failure period has a constant hazard function, which is used to model lifetimes RHIC BEAM PERMIT SYSTEM of electronic components [5] that have a relatively longer The basic unit of BPS is a Permit Module (PM). There intrinsic failure period. The constant hazard rate period are 33 PMs located around the ring at equipment has an exponential failure probability distribution locations. They are connected by three fiberoptic links function and has a peculiar property of being memory- _________________________________________ less. It implies that a used item that is functioning has the 2014 CC-BY-3.0 and by the respective authors *Work performed under Contract Number DE-AC02-98CH10886 with same failure distribution as a new item. The effect of c the auspices of the US Department of Energy ○ #[email protected] ISBN 978-3-95450-139-7 Personnel Safety and Machine Protection 265 Copyright MOPPC075 Proceedings of ICALEPCS2013, San Francisco, CA, USA aging starts in the wear-out period, which is far from the Depending on above module states, the BPS can have expected life of the system. the following system states in whole: Figure 1 shows the failure probability density function System No Dump: No trigger arrives that demands f(t), the cumulative failure distribution function F(t), the the action of BPS Survival function S(t) and the hazard function h(t) which System Good Dump: Input trigger arrives at a is equal to a constant λ. All the BPS module lifetimes are module, and causes a beam dump and/or magnet found to be exponentially distributed [6]. powerp dump. System False Beam Abort Failure: False trigger 2.5 generated within a module causes the beam dump. Exponential Distribution System False Quench Failure: False trigger 2 generated within a module causes beam dump and h(t) magnet power dump. 1.5 f(t) System Blind Failure: Any trigger is blocked in its way, which results in ignored beam dump (and 1 S(t) F(t) magnet power dump). System Dirty Dump Failure: Input trigger arrives at 0.5 a module and causes a beam dump and/or magnet power dump, but signal is not synchronized with the 0 abort gap and sweeps the beam across the dump. 0 0.2 0.4Time 0.6 0.8 1 Significant downtimes are imposed by the System False and System Blind failures. The false failure is a fail-safe Figure 1: Exponential distribution for = 2. condition that furnishes a downtime to power-up and re- initialize BPS, power supplies, beam abort system etc. The blind failure represents a failure to respond to an emergency. It is in fact far more dangerous than the false failure as it can actually cause damage to the RHIC sub- systems, inflicting downtime of several months. The Failure Modes System Dirty Dump increases the radiation levels inside The state of BPS at any given time depends upon the the machine. All these failures affect the reliability and state of its components i.e. PMs and AKMs. The PM can availability of RHIC. fail in three states namely a False Beam Abort (FB), a Competing Risks with Crude Lifetimes False Quench (FQ) and a Blind (B), which have three independent failure rates as λFB, λFQ and λB. The AKM In Competing Risks theory [8], several causes of failure can fail in three states namely a False Beam Abort (FB), or risks compete for the lifetime of an item. The observed Blind (B) and Dirty Dump (DD), which have three outcome comprises T, the time of failure and C, the mode independent failure rates as λFB, λB and λDD. Detailed of failure. Thus the basic probability framework here is a description of these modes is found here [6]. Bivariate Distribution, where T is a continuous random Figure 2 shows the Markov state diagrams [7] for PM, variable and C is a discrete random variable. Here T can AKM and input triggers. The input triggers PI and QI are assume continuous values between [0, ∞) and C assumes modeled as Poisson variable. Their time of arrival is also discrete values as {1, 2... k} exponentially distributed. While considering Crude Lifetimes, each risk is viewed in the presence of all other risks. The lifetimes are analyzed as if all risks are simultaneously acting on the λFB λFB item under examination. A Net Lifetime approach has FB λ FB FB FB been previously used [9] for Monte Carlo simulation λFQ λB where all the risks are viewed individually. Good FQ Good Good B λ The BPS modules are subjected to j = {1, 2... k} risks. B λ th λB B DD The hazard rate for j risk if viewed individually is λj. T is B DD the time of failure and t is the time of observation. The PM:M and PM:SQPM:SNQ and PM:S AKM crude probability distribution function of risk j is given by λ λ PI QI Input Input Good Good trigger trigger For exponentially distributed T: Permit Input Trigger Quench Input Trigger 2014 CC-BY-3.0 and by the respective authors Figure 2: Markov diagrams for BPS modules. ൌͳǡʹǤǤǡ c ○ (1) ISBN 978-3-95450-139-7 Copyright 266 Personnel Safety and Machine Protection Proceedings of ICALEPCS2013, San Francisco, CA, USA MOPPC075 The probability of failure from risk j is given by (3) Eq. 2 and Eq. 3 together generate the bivariate distribution of module lifetime. Simulation Flow The simulation has individual competing risks models The overall survival function ST(t) is the probability for all the BPS modules. Each iteration starts with distribution of survival from all the k risks given by generating exponentially distributed random lifetimes per Eq. 2 and Eq. 3, and the time and mode of failure for each module are recorded.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us