Mizoram Priority List 2005-06

Mizoram Priority List 2005-06

Mizoram Priority List 2005-06 Sl. Name of the Project Estimated Cost No. (Rs in crore) 1 Construction of Link road to proposed Bamboo Plantation Areas (From 15.12 Saiphal to Hortoki) - 0- 27.50 km 2 Construction of Link Road to proposed Bamboo Plantation Areas (From 23.83 Tuirial Airfield to Bukpui, Phase -1 (0-40 km) 3 Construction of Link Road to proposed Bamboo Plantation Areas (From 21.51 Tuirial Airfield to Bukpui, Phase -2 (40-79 km)) 4 Construction of Stadium at Aizawl and Champai 26.47 5 Bamboo Construction Board Industry at Bamboo Industries Complex, Sairang 4.95 6 Infrastructural Development of College Institutions 30 7 Computerisation of Cadastral Map Sheet, etc. 2.08 8 Construction of Community Halls 11.75 9 Improvement of Revenue Collection including metering and computerisation 2.27 10 Construction of Secondary Education School Buildings 18.44 11 Lower Sakawrdai Augmentation Water Supply Scheme 2.86 12 Construction of 33 kV D/C Transmission Line (Tower Type) Lawngtlai to Saiha 6.2 13 Tiabung Water Supply Scheme 4.34 14 Improvement of Sub Transmission and Distribution within Saiha Power Division 9.6 15 Improvement of Sub Transmission and Distribution of Kolasib town 14.29 16 Construction of Steel Girder Bridge over landslide area between Bara Bazar and District Council Secretariat within Lawngtlai Town 2.42 17 Improvement of Sub Transmission and Distribution network in and around Serchhip Town 11.7 18 Establishment of Vertinary Polyclinic at Aizawl 3.5 19 Construction of School Buildings (MADC) 3.86 20 Tuipanglui Minor Irrigation Project 2.25 21 Serzawl Minor Irrigation Project 2.3 22 Thingva Minor Irrigation Project 3.01 23 Composite Theiriat Pumping Scheme 3.62 24 Construction of Impouning Dam at N. Vanlaiphai 2.04 25 Establishment of Survey Training Institute 28.97 26 Reconstruction of Office Buildings and Residential Quarters (RD Department) 2.94 27 Improvement of Sub Transmission and Distribution Network in and around Mamit Town 13.87 28 132 kV S/C between Khawzawl and Champhai 5.62 29 Improvement of S/S and D within Lunglei Power Circle 24.81 30 Construction of official buildings within LADC 2.45 31 Infrastructure Development for the Department of Food, Civil Supplies & 10.16 Consumer Affairs 32 Improvement of Civil Hospital, Aizawl 2.45 33 Upgradation of Champai Hospital 7.8 34 Upgradation of Mamit Hospital 5.88 35 Comprehensive Cancer Treatment in Mizoram 9.1 36 Solid Waste Management Project of Aizawl City 26.24 Sl. Name of the Project Estimated Cost No. (Rs in crore) 37 Construction of Meidum - Hortoki Road (27 km) 4.8 38 Construction of Chhimluang - Zambira Road (11 km) 2.4 39 Champahi - Tuipui road 15.03 40 Construction of Serchhip- Thenzawl - Buarpui Road 9.66 41 Construction of Serkhan - Saipum Road 13.12 42 Construction of Tuipuibari - W. Kawnpui Road 2.74 43 Construction of Buarpui - Thenhlum Road 10.37 44 Construction of Tuipui - N. Vanlaiphai Road 10.01 45 Construction of Phairuang - Thenhlum Road 11.09 46 Construction of Bailey bridges 6.57 Total 454.49 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us