LITGRID Turtas AB INTRODUCTION to INVESTORS VILNIUS, JANUARY 10, 2011 COMPANY OVERVIEW Litgrid Group

LITGRID Turtas AB INTRODUCTION to INVESTORS VILNIUS, JANUARY 10, 2011 COMPANY OVERVIEW Litgrid Group

LITGRID Turtas AB INTRODUCTION TO INVESTORS VILNIUS, JANUARY 10, 2011 COMPANY OVERVIEW Litgrid group ● Registered on November 16, 2010, after spin-off from Lietuvos Energija AB Litgrid Turtas AB ● Manages electricity transmission system assets and its belongings ● Performs functions of electricity transmission operator Litgrid AB ● In Q1 2011 will be merged with Litgrid Turtas AB Baltpool UAB ● Performs market operator activity The spin-off has been performed following the EU Third Energy Package requirements to separate electricity generation and transmission activities Mission and goals ● Mission – to ensure reliable electricity transmission and create conditions for competition in the open electricity market ● Goals – to ensure system control efficiency in a most appopriate manner meeting interests of consumers and shareholders: – Maintaining company profitability – Reducing operational expenditure (Opex) – Not increasing electricity transmission tariff Activities Grid Control of Lithuanian develop- transmission system ment International Electricity strategic market projects organization Electricity system + market operator (Baltpool) = LITGRID Electricity market Generators BALTPOOL, electricity exchange Suppliers Transmission grid LITGRID Regulator Distribution network Source: Svenska Kraftnät Consumers 7 Electricity consumption tendencies Source: National energy strategy (draft), 2010. Strategic development projects ● Local grid development projects – To reinforce local grid; – To prepare for integration with ECN ● International strategic projects – To integrate Lithuanian transmission system into European continental networks; – To achieve national energy independence goals Electricity transmission system of Lithuania NordBalt project Internal grid Stage: Length of lines: 6 669 km manufacturing Transformers: 26 Completion: 2015 Substations: 230 Capacity: 700 MW Capacity of Value: EUR 552 m transformers: 3 843 MVA Transmitted during 11 months in 2010: 9.6 TWh LitPol Link project Stage: planning Completion: 2015-2020 Capacity: 500 MW + 500 MW Value: EUR 237 m Overview of balance sheets Actual balance sheet Spin-off balance sheet 2010.11.30, LTL million Lietuvos Lietuvos LITGRID Turtas AB Energija AB Energija AB . LITGRID Intangible assets 0.4 0.0 0.4 took over assets, Tangible non-current assets 2,645.2 590.1 2,055.1 Other non-current assets 827.7 789.7 38.0 comprising Non-current assets 3,473.3 1,379.9 2,093.5 transmission grid Inventories 2.3 0.6 1.6 Other current assets 103.5 103.5 0.0 . Lietuvos Energija Cash 126.7 83.9 42.8 retained electricity Current assets 232.4 188.0 44.4 generation capacities Non-current assets for sale 1.5 1.5 0.0 ASSETS 3,707.3 1,569.4 2,137.9 Share capital 993.6 489.3 504.3 Share premium 325.4 295.8 29.6 Reserves 311.4 -35.8 347.2 Retained earnings 1,679.5 692.1 987.4 Equity 3,309.9 1,441.3 1,868.6 Deferred income tax liabilities 217.5 22.2 195.4 Other non-current liabilities 92.3 33.9 58.4 Non-current liabilities 309.8 56.1 253.7 Trade payables 60.5 60.5 0.0 Other non-current liabilities 27.1 11.5 15.6 Non-current liabilities 87.6 72.0 15.6 EQUITY AND LIABILITIES 3,707.3 1,569.4 2,137.9 Average electricty price LTC/kWh 7.69 7.69 VIAP: +27% 6.39 7.36 Out of 6 components Litgrid Transmission tariff: retains a component for 4.89 balancing of renewable energy 5.31 and a component from funds for -13% 2.98 financing of strategic projects 3.41 6.01 4.73 15.5 16.0 2010 2011 Generation POS Transmission Supply Distribution in mid. voltage network Distribution in low voltage network PVM Source: National Control Commission for Prices and Energy INFORMATION FOR SHAREHOLDERS Why are we at the stock exchange? ● Lietuvos Energija, from which activity and assets were spun-off, establishing Litgrid Turtas AB, is a listed company – After spin-off of assets and activity, shareholders proportionally received shares of both companies ● Possibility to consider attracting funds to finance strategic projects through stock exchange Shares of utility companies Guaranteed and inevitable need of utility services Long-term and stable investment: fluctuation of utility company shares is lower than average in the market: 0.5 beta Source: http://pages.stern.nyu.edu/~adamodar/ Information about issuer ● Litgrid Turtas AB was included into the secondary trade list of NASDAQ OMX Vilnius on December 22, 2010 ● ISIN code LT0000128415 ● Abbreviation LGD1L ● Issue volume - 504 331 380 shares, nominal value of 1 share - 1 litas ● Share price today – €0,713/LTL2,46.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us