Sanchez-Piulachs Arquitectes S

Sanchez-Piulachs Arquitectes S

IMPROVEMENTS TO METRO STATIONS - Project in progress: restoration of the interchange in Urquinaona station of line 1 and line 4 of the underground in Barcelona. Collaboration with Infraes, S.A i Ingenium Civil SLP engineerings. Implementation project of actions on improvement of the evacuation and the accessibility. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Project in progress: restoration of the interchange of Catalunya station in line 1 and line 3 of the underground of Barcelona. Implementation project of architecture and facilities. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration plan for acoustic improvements of Muntaner and Plaça Espanya stations. Implementation project of architecture and facilities. Barcelona 2009. C.P.: 2.178.000€ / 2.963.692US$. Promoter: Ferrocarrils de la Generalitat de Catalunya. - Restoration of Gràcia station of Barcelona FGC (metro). Implementation project of architecture and facilities. Barcelona 2009. C.P.: 24.924.000€ / 33.915.084US$. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Restoration of Sarrià station of Barcelona FGC (metro). Implementation project of architecture and facilities. Barcelona 2008. C.P.: 31.272.000€ / 42.553.061US$. Collaboration with Auding Engineering. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - New access to Torre Baró-Vallbona station on Line 11 of the Barcelona metro. Implementation project of architecture and facilities. Barcelona 2007. C.P.: 3.100.000€ / 4.218.294US$. Promoter: Bagur,SA. - Sagrera Meridiana interchange of the Barcelona metro. Implementation project for the hall of C/ Garcialso, C/ Felip II, main hall and Line 1 and 5 platforms. Barcelona 2006. C.P.: 88.100.000€ / 118.881.194US$. Collaboration with engineering firm IDOM. Promoter: Generalitat de Catalunya / Direcció General de Transports (Gisa). - Restoration of Joanic station on Line 4 of the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 2005. C.P.: 1.500.000€ / 2.041.110US$. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration of Sants Estació station on Line 3 of the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 2005. C.P.: 1.700.000€ / 2.313.258US$. Promoter: Transports Metropolitans de Barcelona (TMB). - New hall in Arc de Triomf station on Line 1 of the Barcelona metro. Implementation project of architecture and facilities. Barcelona 2003. C.P.: 11.540.000€ / 15.702.940US$. Collaboration with Auding Engineering. Promoter: Generalitat de Catalunya. - Information office at Diagonal station (Lines 3 and 5) and Sagrada Família station (Lines 2 and 5) on the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 1999-2000. Promoter: Transports Metropolitans de Barcelona (TMB) - Restoration of Hostafrancs station on Line 1 of the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 1998-1999. C.P.: 255.000€ / 346.989US$. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration of Collblanc station on Line 5 of the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 1998-1999. C.P.: 220.000€ / 299.363US$. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration of Badal station on Line 5 of the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 1998-1999. C.P.: 225.000€ / 306.167US$. Promoter: Transports Metropolitans de Barcelona (TMB). - Redesign of underground rotunda under Plaça de Catalunya in Barcelona. Blueprint. Barcelona 1997. Promoter: Transports Metropolitans de Barcelona (TMB). - Restoration of the access and ticket hall in Fontana station on Line 3 of the Barcelona metro. Implementation project of architecture and facilities and Construction management. Barcelona 1996. Promoter: Transports Metropolitans de Barcelona (TMB). - Advisory team for the distribution of business units to Line 2 of the Barcelona metro. Barcelona 1995-1999. Promoter: Transports Metropolitans de Barcelona (TMB). - Transport sales and information booth in the middle of Plaça Catalunya in Barcelona. Implementation project of architecture and facilities. Barcelona 1995. Promoter: Transports Metropolitans de Barcelona (TMB) - Line 2 of the Barcelona metro. Sant Antoni, Passeig de Gràcia, Tetuan and Monumental stations. Construction supervision and management. Barcelona 1992-1995. Promoter: Generalitat de Catalunya. - Feasibility study and elimination of architectural barriers to Ferrocarril Metropolità de Barcelona. Barcelona 1991. Promoter: Generalitat de Catalunya. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us