Newcastle Light Railway Review of Environmental Factors

Newcastle Light Railway Review of Environmental Factors

Newcastle Light Rail Review of Environmental Factors April 2016 This report has been prepared by GHD for Transport for NSW and may only be used and relied on by Transport for NSW for the purpose agreed between GHD and Transport for NSW as set out in section 1.3 of this report. GHD otherwise disclaims responsibility to any person other than Transport for NSW arising in connection with this report. GHD also excludes implied warranties and conditions, to the extent legally permissible. The services undertaken by GHD in connection with preparing this report were limited to those specifically detailed in the report and are subject to the scope limitations set out in the report. The opinions, conclusions and any recommendations in this report are based on conditions encountered and information reviewed at the date of preparation of the report. GHD has no responsibility or obligation to update this report to account for events or changes occurring subsequent to the date that the report was prepared. The opinions, conclusions and any recommendations in this report are based on assumptions made by GHD described in this report (refer to section 1.4 of this report). GHD disclaims liability arising from any of the assumptions being incorrect. Whilst every care has been taken to prepare the maps for this report, GHD and LPI makes no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason. © 2016. Contents Abbreviations ............................................................................................................................................. i Definitions ................................................................................................................................................. ii Executive summary ................................................................................................................................. iv 1. Introduction.................................................................................................................................. 1.1 1.1 Background to the proposal .............................................................................................. 1.1 1.2 Key features of the proposal ............................................................................................. 1.2 1.3 Scope of the REF .............................................................................................................. 1.3 2. Location and setting .................................................................................................................... 2.1 2.1 Proposal site location and description .............................................................................. 2.1 2.2 The study area .................................................................................................................. 2.1 3. Statutory considerations .............................................................................................................. 3.1 3.1 Approvals pathway ............................................................................................................ 3.1 3.2 Requirements under other NSW environmental planning instruments and legislation .......................................................................................................................... 3.2 3.3 Approvals under Commonwealth legislation .................................................................... 3.5 3.4 Summary of approval requirements .................................................................................. 3.6 3.5 The assessment process .................................................................................................. 3.7 4. Community and stakeholder consultation ................................................................................... 4.1 4.1 Consultation objectives and approach .............................................................................. 4.1 4.2 Consultation prior to REF preparation .............................................................................. 4.1 4.3 Consultation during REF preparation ............................................................................... 4.4 4.4 Consultation during public display .................................................................................... 4.5 4.5 Post determination consultation ........................................................................................ 4.6 5. Strategic context, need and design development ....................................................................... 5.1 5.1 Strategic planning and project need ................................................................................. 5.1 5.2 Concept design development ........................................................................................... 5.3 5.3 Route alignment options ................................................................................................... 5.6 5.4 Light rail stop options ...................................................................................................... 5.10 5.5 Other options investigated .............................................................................................. 5.12 6. Description of the proposal features and operation .................................................................... 6.1 6.1 Overview of the proposal .................................................................................................. 6.1 6.2 Light rail infrastructure ...................................................................................................... 6.8 6.3 Road and transport infrastructure ................................................................................... 6.19 6.4 Design and development requirements .......................................................................... 6.24 6.5 Operation of the proposal ............................................................................................... 6.28 6.6 Maintenance ................................................................................................................... 6.31 7. Construction of the proposal ....................................................................................................... 7.1 Transport for NSW | Newcastle Light Rail – Review of Environmental Factors 7.1 Outline approach ............................................................................................................... 7.1 7.2 Construction methodology ................................................................................................ 7.6 7.3 Construction resources ................................................................................................... 7.10 7.4 Construction compounds ................................................................................................ 7.12 7.5 Construction traffic, transport and access management ................................................ 7.12 8. Traffic, transport and access ....................................................................................................... 8.1 8.1 Assessment approach and methodology.......................................................................... 8.1 8.2 Existing environment......................................................................................................... 8.3 8.3 Impact assessment ........................................................................................................... 8.7 8.4 Mitigation measures ........................................................................................................ 8.16 9. Noise and vibration ..................................................................................................................... 9.1 9.1 Assessment approach and methodology.......................................................................... 9.1 9.2 Existing environment......................................................................................................... 9.3 9.3 Noise and vibration management levels/criteria ............................................................... 9.6 9.4 Impact assessment ........................................................................................................... 9.9 9.5 Mitigation measures ........................................................................................................ 9.20 10. Non-Aboriginal heritage ............................................................................................................ 10.1 10.1 Assessment approach and methodology........................................................................ 10.1 10.2 Existing environment....................................................................................................... 10.1 10.3 Impact assessment ......................................................................................................... 10.9 10.4 Mitigation measures ...................................................................................................... 10.11 11. Aboriginal heritage ...................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    279 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us