Greater Sydney Water Quality Modelling

Greater Sydney Water Quality Modelling

Greater Sydney Water Quality Modelling Integrated Water quantity and quality modelling for Sydney Supply System (CARM – Greater Sydney) CARM – Greater Sydney Vision “To have a decision-making support system to manage the Greater Sydney Drinking Water catchments and supply for our customers based on best available science, forecast and planning models.” WaterNSW eWater Conference 1-2 December 2020 Why we are doing this? • Creating a complete set of linked quantity and quality models for: – Catchment – Reservoir – Supply • Quantitative comparison and justification of interventions • Ability to conduct Economic assessments • More robust, efficient operations 3 WaterNSW eWater Conference 1-2 December 2020 Where? • Warragamba catchment • Upper Nepean catchment • Shoalhaven catchment • Blue Mountains catchment • Prospect 4 WaterNSW eWater Conference 1-2 December 2020 What parameters? • 3 models – Catchment model – Lake model – Supply model • Contaminants: – Physical – Nutrient – Pathogens – Algae 5 WaterNSW eWater Conference 1-2 December 2020 How do we manage the project? 6 WaterNSW eWater Conference 1-2 December 2020 Modelling framework & data connection eWater Source Models External advice Hydrological/river Ops Model Research projects WaterNSW databases Water Quality Model Subject matter experts Hydstra/DRS/SCARMS GIS databases WQDB DHI Workbench Workflow Hydrohub Lake Models management 2D Data Process/Profiles Data Storage visualisation Inflow tracking Data postprocessing External agencies BoM Wathnet Models Climate/weather data Long term storage/inflow WWTP data Arc Dashboard models Data visualisation Programs Decision Support Planning Output Output Output Scenario assessment Source selection Catchment storage planning for Program evaluation Offtake level selection quality Input: Catchment Input: Risk assessment conditions and change Pre-event Catchment Input: conditions Catchment conditions and change 7 WaterNSW eWater Conference 1-2 December 2020 Climate conditions Three models interlinked • Catchment models for declared areas - in Source 5 • Sydney Water WWTP plugin Catchment Model • CSIRO SedNET Plugin • Use outputs from Source catchment models as input • Lake models for 7 key supply dams Lake Model • A supply system model - in Source 5. • model will use the outflow settings from the lake model Supply Model • route flows through upper canal/pipeline/riverine network 8 WaterNSW eWater Conference 1-2 December 2020 Catchment modelling • Points of interest (POI) – POI maps each catchment model – Each POI – output from the model • Modelled Parameters – Discharge – Turbidity, TSS, temp, DO, Example conductivity POI Maps – NO3, NOx, NH4, TN, TP, FRP – E. coli, FC – Silicate, metals (AL, Fe, Mn) 9 WaterNSW eWater Conference 1-2 December 2020 Catchment modelling Catchment models • Developed in Source 5 • WWTP plugin from Sydney Water • Sediment modelling (CSIRO SedNET) Calibration • Calibration/verification periods for inflow points into lakes – gauged flow data – 80-20 split of flow 10 WaterNSW eWater Conference 1-2 December 2020 Catchment modelling Fire modelling • Calibration periods – excluding periods of bushfire (base case) 2019/20 20 • catchment area u/s of gauges developed • cut-off 10% of area affected by fire • Post fire periods – analysed to quantify 2001/20 02 resulting impact 11 WaterNSW eWater Conference 1-2 December 2020 Catchment modelling: WWTP Plug-in • WWTP plug-in - by Sydney Water • A “Sewage Treatment Plant” node in Source – For each WWTP • Parameterize WWTP nodes using best available data • Data Source: from Councils, WaterNSW archives etc. 12 WaterNSW eWater Conference 1-2 December 2020 Catchment modelling: SedNET plug-in • The CSIRO SedNET plug-in will be used • Based on assessing the soil loss using RUSLE equation • Mean Annual Soil Loss (tonnes/ha/yr)= R K L S C P – R = Rainfall erosivity factor – K = soil erodibility factor (spatially variable) – L = Hillslope length – S = Hillslope gradient factor – C = ground cover factor – P = Supporting practise factor (=1)* • *P=1 as the C value is covering the soil coverage 13 WaterNSW eWater Conference 1-2 December 2020 Reservoir modelling • ELCOM-CAEDYM Existing reservoir model bathymetry developed by CWR, University of Western Lake Burragorang Australia would be used • Update existing lake models – Lake Burragorang – Prospect Reservoir – Fitzroy Falls – Wingecarribee – Yarrunga • Develop new lake models • Modelling conducted by Hydronumerics. Prospect Reservoir 14 WaterNSW eWater Conference 1-2 December 2020 Reservoir modelling Example 2D plot • Modelled Parameters: – Reservoir dynamics (e.g., level/outflow) – Turbidity, TSS, Temp, DO, Conductivity, pH – NO3, NOx, NH4, TN, TP, FRP – E. coli, FC, Cyanobacteria, Diatoms – Silicate, metals (AL, Fe, Mn) – DOC, POC, DIC – DOP, POP, PIP – DON, DOP, DIN 15 WaterNSW eWater Conference 1-2 December 2020 Supply system modelling • Outflow selection from Dams – Measured – Modelled • Routing through supply system to Water Filtration Plants • Mixing of water supplies through the system – Parameters of concern identified 16 WaterNSW eWater Conference 1-2 December 2020 Supply system modelling • Discharges from the dams – Operators decide flow settings from lake model. – Inflows into the supply system set through Mike Operations – Connect to the Source model 17 WaterNSW eWater Conference 1-2 December 2020 Supply system modelling • Calibration & Validation – Data collection points in: • River • Upper Canal • Pipeline – Parameters: • Flow • Level • TSS / Turbidity • Temperature • Conductivity • Nitrogen • Phosphorus 18 WaterNSW eWater Conference 1-2 December 2020 Supply system modelling • Water Filtration Plants – Demand on the system – Identify quality provided – Forecasted quality to be delivered to our clients – Calibration against measured data 19 WaterNSW eWater Conference 1-2 December 2020 Dashboarding and information sharing • Mike Operations 2020 platform - DHI – Workflow management – Input data preparation and processing – Data storages 20 WaterNSW eWater Conference 1-2 December 2020 Dashboarding and information sharing • Development of CARM GS Spatial Portal – ArcInsight – Data visualisation – Viewing results – Reporting and publications 21 WaterNSW eWater Conference 1-2 December 2020 Challenges… • Dashboarding/interfaces/ICT issues: intrinsically complex product/service • Data limitations: – Availability of historical data for calibration – GIS data status (availability of updated data prior to model build) • Colour modelling – How to model colour? Research programs in place. • Heavy metal modelling – Research to develop empirical models • Onsite wastewater modelling – part of land-use definitions or not? • WWTP modelling – data provision and collaboration with externals • Mining impact modelling – research on mining impacts on Water Quality (ARC DARE program) – Data provision and collaboration with mining companies and EPA • Swamp modelling – currently excluded. Will this impact the modelling? • COVID 19 – Applying agile has allowed us to stay closely connected 22 WaterNSW eWater Conference 1-2 December 2020 Thank You! Marlène van der Sterren Rizwana Rumman 23.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us