River Basin Management Plan for Ireland 2018 - 2021 Natura Impact Statement 2018 - 2021

River Basin Management Plan for Ireland 2018 - 2021 Natura Impact Statement 2018 - 2021

River Basin Management Plan for Ireland River housing.gov.ie River Basin Management Plan for Ireland 2018 - 2021 Natura Impact Statement 2018 - 2021 Department of Housing, Planning and Local Government River Basin Management Plan - NIS TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................................ 1 1.1 LAYOUT OF THE NIS .................................................................................................................... 1 1.2 LEGISLATIVE CONTEXT FOR APPROPRIATE ASSESSMENT ......................................................................... 2 1.3 PURPOSE OF THE AA PROCESS .......................................................................................................... 3 1.4 OVERLAP WITH THE STRATEGIC ENVIRONMENTAL ASSESSMENT OF THE RBMP ......................................... 3 1.5 CONSULTATION .............................................................................................................................. 3 2 THE RBMP ........................................................................................................................ 9 2.1 INTRODUCTION .............................................................................................................................. 9 2.2 APPROACH TAKEN TO DEVELOPING THE PLAN..................................................................................... 12 2.3 CONTENTS AND MAIN OBJECTIVES OF THE PLAN ................................................................................ 14 3 ASSESSMENT METHODOLOGY ........................................................................................ 16 3.1 GUIDANCE DOCUMENTS ON AA ...................................................................................................... 16 3.2 GUIDING PRINCIPLES AND CASE LAW ............................................................................................... 17 3.3 STAGES OF APPROPRIATE ASSESSMENT ............................................................................................ 17 3.4 INFORMATION SOURCES CONSULTED ............................................................................................... 19 3.5 IMPACT PREDICTION...................................................................................................................... 19 4 OVERVIEW OF THE RECEIVING ENVIRONMENT ................................................................ 21 4.1 IDENTIFICATION OF EUROPEAN SITES ............................................................................................... 21 4.2 CONSERVATION OBJECTIVES ........................................................................................................... 24 4.3 CONSERVATION STATUS OF EU PROTECTED HABITATS AND SPECIES ...................................................... 25 4.4 EXISTING THREATS AND PRESSURES TO EU PROTECTED HABITATS AND SPECIES ...................................... 26 4.5 RELEVANT BIODIVERSITY POLICY ...................................................................................................... 28 5 STAGE 1 SCREENING FOR AA........................................................................................... 29 5.1 POTENTIAL FOR LIKELY SIGNIFICANT EFFECTS ..................................................................................... 29 5.2 SCREENING FOR APPROPRIATE ASSESSMENT CONCLUSION................................................................... 32 6 STAGE 2 APPROPRIATE ASSESSMENT OF THE DRAFT RBMP ............................................. 33 6.1 INTRODUCTION ............................................................................................................................ 33 6.2 APPROACH TO ASSESSMENT ........................................................................................................... 33 6.3 IMPACT PREDICTION...................................................................................................................... 34 6.4 ASSESSMENT OF EFFECTS OF DRAFT RBMP ...................................................................................... 37 7 SCREENING OF CHANGES TO FINAL RBMP ....................................................................... 85 8 MITIGATION MEASURES / RECOMMENDATIONS ........................................................... 137 MGE0618Rp0002F02 i River Basin Management Plan - NIS 9 CONCLUSIONS .............................................................................................................. 143 10 REFERENCES ................................................................................................................. 144 APPENDICES Appendix A Consultation Submissions Appendix B Special Areas of Conservation (SACs) Republic of Ireland Appendix C Special Protection Areas (SPAs) Republic of Ireland Appendix D Special Areas of Conservation (SACs) Northern Ireland Appendix E Special Protection Areas (SPAs) Northern Ireland Appendix F Screening for Appropriate Assessment Appendix G EU Condition Assessment Appendix H Generic Threats and Pressures Considered Relevant to the RBMP Appendix I NPWS List of water dependent habitats and species LIST OF FIGURES Figure 2-1 River Basin Districts for the 1st Cycle of the WFD (2009 – 2015) ........................................... 9 Figure 2-2 Ireland’s River Basin Districts for the Second Cycle of WFD (2015 – 2021) ........................ 10 Figure 2-3 Proposed Governance and Co-ordination Structures .......................................................... 11 Figure 2-4 Water Framework Directive Cycle (Source: DECLG) ............................................................ 12 Figure 4-1 European Sites ..................................................................................................................... 23 MGE0618Rp0002F02 ii River Basin Management Plan - NIS LIST OF TABLES Table 1-1 Responses to SWMI Public Consultation ................................................................................ 4 Table 1-2 Issues Raised in SWMI Public Consultation............................................................................. 5 Table 1-3 Summary of sub-themes identified from the RBMP Public Consultation Process. Sub- themes are ordered with those more frequently raised listed first in each column. ............................ 7 Table 1-4 Summary of sub-themes identified from the LAWCO Public Consultation Process. Sub- themes are ordered with those more frequently raised listed first in each column. ............................ 8 Table 4-1 European Sites within the ZoI of the RBMP .......................................................................... 22 Table 5-1 Aspects of the plan with potential for significant effects ..................................................... 29 Table 6-1 Main Ecological Impacts Associated with the RBMP ............................................................ 36 Table 6-2 Rural diffuse and point source pollution .............................................................................. 38 Table 6-3 Urban Waste Water and Urban Run Off ............................................................................... 44 Table 6-4 Forestry ................................................................................................................................. 48 Table 6-5 Peatlands ............................................................................................................................... 51 Table 6-6 Aquatic and Riparian Invasive Alien Species ......................................................................... 54 Table 6-7 The Physical Condition of the Water Environment............................................................... 56 Table 6-8 Abstraction Pressures ........................................................................................................... 59 Table 6-9 Other Pressures ..................................................................................................................... 60 Table 6-10 Protected Areas and High Status Waters ............................................................................ 63 Table 6-11 Economic Analysis ............................................................................................................... 71 Table 6-12 In-Combination Impacts with Other Plans and Strategies .................................................. 75 Table 7-1 Rural Diffuse and Point Source Pollution .............................................................................. 86 Table 7-2 Urban Waster Water and Urban Run-off .............................................................................. 94 Table 7-3 Forestry ................................................................................................................................. 98 Table 7-4 The Harvesting of Peatlands ............................................................................................... 100 Table 7-5 Invasive Species................................................................................................................... 105 Table 7-6 Improving the Physical Condition of the Water Environment ............................................ 107 Table 7-7 Abstraction Pressures ......................................................................................................... 108 Table 7-8 Overview of Measures to Address Other Pressures ........................................................... 111 Table 7-9 Protected Areas and High

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    273 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us