Clifton Corridor Transit Initiative Fact Sheet Spring 2018

Clifton Corridor Transit Initiative Fact Sheet Spring 2018

Clifton Corridor Transit Initiative Fact Sheet Spring 2018 What is the Clifton Corridor Transit Initiative? A transit expansion project connecting the Red/Gold and Blue MARTA rail lines to major employment, educational, healthcare, and shopping destinations, while providing transportation options along a congested corridor. Destinations: Type: Funding Source: Service Areas: • Lindbergh Center Station • Clairmont Road Retail • Light Rail • Local/Federal • City of Atlanta • Cheshire Bridge Road • Suburban Plaza Retail Transit (LRT) (Capital • DeKalb County • Centers for Disease • DeKalb Medical Center Investment Control and Prevention Grant) • City of Decatur • Your DeKalb Farmers Market • Emory University • Avondale Station ▶ How will the project benefit the Clifton Corridor? Increases Service Improves Access Provides Emergency Provides Alternate Reliability and Frequency and Connectivity Evacuation Option Transportation Options ▶ Cost & Ridership Phase 1 Full Build Ridership Only (MOS) (including Phase 1) $900M - $1.3B $1.8 - $2.1B 23,300 Contact Us On the Web Bryan Hobbs http://www.itsmarta.com/clifton-corridor-overview.aspx 404-848-5733 | [email protected] PLANNING Clifton Corridor Transit Initiative Fact Sheet Spring 2018 ▶ Project Schedule We are Here 2012 2015 2018 2022 2026 Planning Environmental Engineering Construction Operation review (NEPA) This timeline is an estimate and is subject to change. ▶ Project Area Clifton Corridor Transit Initiative Alternative 6 (Light Rail) LINDBERGH At grade, non-roadway alignment CENTER At grade, median roadway alignment At grade, lateral roadway alignment Aerial section . D R CHESHIRE F Cut and cover tunnel F I BRIDGE L C R Proposed stations - alt 6 A I R B Y. W D H R E SAGE HILL/ CDC/EMORY L X PHASE 2 IL O V N BRIARCLIFF E E CONFERENCE CENTER L ALIGNMENT C N E R W EMORY/CDC A CITY OF L ATLANTA EMORY- ANDREWS SUBURBAN DEKALB MEDICAL ROLLINS CIRCLE PLAZA CENTER N. DECATUR RD. N. D ECA TU PHASE 1 R R IRWIN D. TO NORTH NORTH DECATUR/ DECATUR/ . WAY CLAIRMONT ST H C CLAIRMONT R CL U AI H RM C O YOUR DEKALB N T R D FARMERS MARKET . FULTON COUNTY FULTON DEKALB COUNTY CITY OF SCOTT BLVD. DECATUR 0 ¼ ½ ¾ 1 N Miles EAST LAKE AVONDALE Contact Us On the Web Bryan Hobbs http://www.itsmarta.com/clifton-corridor-overview.aspx 404-848-5733 | [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us