EB Platforms (For Info)

EB Platforms (For Info)

EB platforms (for info) Michèle Dion-Demaël WG AS convener 23 Sept. 2020 MESC 1 PICASSO & MARI On 13 July, PICASSO and MARI (implementation projects for the aFRR- and mFRR- Platforms) organised a detailed public workshop, covering the respective balancing processes and products, the bidding design, the activation optimisation functions, pricing principles, accession roadmaps and timeline, gate closure times and monitoring and reporting. The workshop was attended by 507 participants – thank you for your attendance! The balancing platforms will organise public workshops every year. 2 PICASSO Some information given in the workshop: 3 PICASSO aFRR-Platform Accession Roadmap Last updated on 24/04/2020 based on latest information available. 2020 2021 2022 aFRRIF Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 5.4.(b)(ii) AOF 5.4.(b)(ii) TSO-TSO settlement 5.4.(b)(vi) Testing functions & aFRR operation aFRR-Platform 5.4.(b)(iii) TSOs Interoperability test 5.4.(b)(iv) Operational test (parallel run) 5.4.(b)(v) TSOs Connection to aFRR platform / Go-live 5.4.(b)(vi) aFRR-Platform Go-live 2020 2021 2022 Country TSO Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Germany 50 Hertz Greece ADMIE Germany Amprion Aus tria APG Czech republic ČEPS Slovenia ELES Belgium Elia Denmark* Energinet Bulgaria ESO Finland* Fingrid Croatia HOPS Hungary MAVIR Poland PSE Spain REE Portugal REN France RTE Slovakia SEPS Norway* Statnett Sweden* SVK Switzerland Swissgrid Netherlands Tennet BV Germany Tennet GmbH Italy Terna Romania Transelectrica Germany TransnetBW 5.4.(b)(i) National terms and conditions development 5.4.(b)(i) National terms and conditions entry info force 5.4.(b)(iii) Interoperability tests between TSO and aFRR-Platform 5.4.(b)(v) TSO connection to aFRR-platform / Go-live 5.4.(b)(vii) EBGL Article 62 Derogation considered / requested / granted 4 *) For Denmark, Finland, Norway and Sweden accession is possible Q3 2023 - Q2 2024. MARI Some information given in the workshop: 5 MARI 6 TERRE The RR TSOs are consulting stakeholders on a proposal for amendments to the RRIF (counter- activations, alignment with methodologies approved by ACER and entities): https://consultations.entsoe.eu/markets/all-rr-tsos-consultation-on-amended-rrif/ - deadline 21 Sept. Information is regularly updated in the TERRE website: https://www.entsoe.eu/network_codes/eb/terre/ 7 IGCC Information is regularly updated in the IGCC website: https://www.entsoe.eu/network_codes/eb/imbalance-netting/ 8.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us