Design-Bid-Build

Design-Bid-Build

Project Delivery Options: Pros and Cons Traditional Design-Bid-Build Pros Cons Design-bid-build’s linear Construction costs are not firmly process is easy for owners to established until design stage is manage and understand completed Owners can actively participate If bids run over budget, redesign, value in the design process engineering, and rebidding processes Scheduling is straightforward can lead to project delays and since design and construction additional design costs phases are sequential, not Architect does not typically receive overlapping benefit of the contractor’s advice on Design-bid-build process constructability and costs during the benefits from the architect’s design phase professional responsibility to Knowledge of some advanced design a quality building and act construction technology offered by on behalf of the owner specialty subcontractors and general Once the contractor makes a contractors is not as readily available in cost commitment, it is usually this approach reliable because it is based on Since most contractors compete on the nearly completed design basis of the lowest bid, any gaps or documents alterations in the design documents Design and construction roles may lead to opportunities for are separate and well- contractors to delay construction understood, making both and/or request change orders responsibility and liability This approach’s relatively long process relatively clear may be unacceptable for owners Owners have the opportunity to Since process is linear, any delay in one review competitive bids for of the phases usually sets back the construction costs entire schedule Contractors are familiar with Construction delays may result in process and work well under added costs to owner and architect this approach Adversarial relationships and potential Architects are more active in for litigation can develop between construction administration architect and contractor, due to their than in other project delivery separate contracts with the owner methods so design intentions are carried through construction Legal Disclaimer: Nothing in this material should be construed as investment, financial, brokerage, or legal advice. Moreover, the facts and circumstances relating to your particular project may result in material changes in the processes, outcomes, and expenses described herein. Consult with your own professional advisors, including your financial advisors, accountants, and attorneys, before attempting to consummate any transaction described in this material. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us