GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY RAJYA SABHA UNSTARRED QUESTION NO. 880 TO BE ANSWERED ON 24.07.2017 MODALITIES FOR SETTING UP OF NATIONAL SOLAR MISSION 880. DR. VIKAS MAHATME: Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state: (a) whether Government has finalized the modalities of setting up of the National Solar Mission in the country; (b) if so, the details thereof and if not, the reasons for delay; and (c) the time by which the modalities are likely to be finalized? ANSWER THE MINISTER OF STATE FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (INDEPENDENT CHARGE) (SHRI PIYUSH GOYAL) (a) & (b): The National Solar Mission has already been launched on 11th January, 2010. Initially, the target of 22,000 MW of solar power installation was fixed as detailed under: (i) deployment of 20,000 MW of grid connected solar power by 2022, (ii) 2,000 MW of off-grid solar applications including 20 million solar lights by 2022, (iii) 20 million sq. m. solar thermal collector area. In June, 2015, the target was revised from 20,000 MW to 1,00,000 MW by 2022 for grid connected solar power projects. The Year-wise targets for grid connected solar power capacity installation are given below: Year/Category Rooftop Solar Large Scale Solar Power Total (In MW) Projects (In MW) (In MW) 2015-16 200 1,800 2,000 2016-17 4,800 7,200 12,000 2017-18 5,000 10,000 15,000 2018-19 6,000 10,000 16,000 2019-20 7,000 10,000 17,000 2020-21 8,000 9,500 17,500 2021-22 9,000 8,500 17,500 Total 40,000 57,000 97,000* *3,743 MW commissioned upto 2014-15. In order to achieve the new target, the Government has launched following schemes: i. Solar Park Scheme for setting up of over 25 Solar Parks and Ultra Mega Solar Power Projects targeting over 20,000 MW of solar power projects (Target capacity recently enhanced to 40,000 MW). ii. Scheme for setting up 1000 MW of Grid-Connected Solar PV Power Projects by Central Public Sector Undertakings (CPSUs) and various Government of India organisations with Viability Gap Funding (VGF). iii. Scheme for setting up 300 MW of Grid-Connected Solar PV Power Projects by Defence Establishments and Para Military Forces with VGF. iv. Pilot-cum-demonstration projects for development of grid connected solar PV power plants on canal banks and canal tops. v. Bundling Scheme – 15,000 MW grid-connected solar PV power plants through NTPC Ltd./ NVVN. vi. VGF Scheme for setting up of 2,000 MW of Grid Connected Solar PV Power Projects through SECI. vii. VGF Scheme for setting up of 5,000 MW of Grid Connected Solar PV Power Projects through SECI. viii. Installation of Grid Connected Solar Rooftop Power Plants. (c): Question does not arise. ****** .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us