Offshore Wind Transmission Risk Technical Conference

Offshore Wind Transmission Risk Technical Conference

Offshore Wind Transmission Risk Technical Conference February 26, 2020 2/26/2021 www.nj.gov/bpu 1 Opening Remarks: Abe Silverman General Counsel, NJ BPU 2/26/2021 www.nj.gov/bpu 2 Presentation: Richard Levitan President, Levitan & Associates 2/26/2021 www.nj.gov/bpu 3 Comparison of OSW Transmission Options February 26, 2021 Richard Levitan, [email protected] Transmission Study Options Study Goals Identify commercial, technical, environmental, and operational (dis)advantages Evaluate relative strength of radial export cables and ocean grid designs around 7.5 GW goal Assess “power corridor” concept with multiple OSW projects delivering power to a single POI via HVDC Review lessons learned from the EU and UK re network grids, centralized approach, project risk 5 Information Sources Initial stakeholder input Nov 2019 – 4 panels • Connecting Generation through Shared Transmission Facilities • Optimal OSW Transmission Framework to meet NJ’s OSW Goals • Technical Considerations • Cost Responsibility and Business Model Considerations Stakeholder meetings July-Aug 2020 • Contacted 80 representatives from 54 entities • Arranged 12 teleconferences (commonality of interests) EU OSW transmission studies • NYPA: Offshore Wind - EU Perspective • DIW ECON: Market Design for Efficient Transmission • Navigant: Connecting OSW Farms - A Comparison of Development Models • Atlantic Grid: Transmission Policy Lessons from the EU 6 BOEM Lease Areas 7 Option 1: Radial Export Cables Relatively straight- forward option • Appropriate for single OSW projects • 1,000-1,200 MW project would use 3 subsea HVAC cables • Bundles generation and transmission • Typically connects to 1 POI 500 kV 230 kV 138 kV Substation Collector Station HVAC Cable 8 Findings – Radial Export Cables Bundles generation with transmission • Traditional approach in NJ, NY, New England, MD Advantages • Financeability • Project development and operating risk borne by developer • Build what’s needed when needed • Straightforward project cost evaluation and procurement process Disadvantages • Higher environmental impacts from multiple shoreline and marine construction efforts • Must punch through to 500 kV backbone system upon depletion of headroom at coastal POIs 9 Option 2: Ocean Grid Connect multiple OSW projects to POIs • HVDC technology • Delivery cables to shore plus inter- project cables • Inter-project reliability concerns • Optimized power flow • Larger nameplates 500 kV limit usefulness 230 kV 138 kV Substation Collector Station Converter Station HVAC Cable HVDC Cable 10 Option 4: Power Corridor Extension of hybrid system concept for NJ • Multiple HVDC export cables from a single offshore POI in one onshore ROW to 500kV POI • Environmental impacts minimized due to HVDC (1 cable) and single 500 kV construction program 230 kV 138 kV • No inter-project Substation reliability impacts Collector Station Converter Station HVAC Cable HVDC Cable Power Corridor 11 Findings – Ocean Grid and Power Corridor A coordinated transmission solution • PJM SAA defines development and regulatory path • SAA permits cost caps, encourages innovation • Would be a regulated PJM transmission asset Advantages • Environmental benefits of reduced shoreline and marine impacts with single HVDC cables and coordinated construction program • Leverages headroom at coastal POIs and the 500kV backbone Disadvantages • Raises project-on-project risks • HVDC more expensive for short distances • Challenge of optionality, i.e., which OSW sites • Ratepayer onus re fixed non-bypassable charges • Procurement alignment / timing cycles 12 Option 3: Hybrid System Reflects strong central role of TSOs in nascent EU planning and development • TSOs (Germany, Denmark) extend onshore grids offshore Connects multiple OSW projects to offshore collector platforms • Designed for smaller nameplates, i.e., 250-400 MW • Advantages dissipate with larger nameplates, i.e., 1,000+ MW • OSW projects use HVAC radial export cables to connect to offshore collector platforms Large NJ project nameplates eliminate hybrid system but may pave the way for a power corridor 13 Current State of Technology Play OSW nameplates now 1,000 MW+ HVAC and HVDC subsea cables are reliable • NJ lease areas are relatively close to shore • HVAC losses increase with distance; HVDC losses do not but converters impose their own losses • A coordinated transmission project would likely use HVDC technology • HVDC equipment not compatible across vendors Technology progress may increase cable voltage & capacities • May not be useable in NJ if injections >1200 MW trigger PJM reliability costs Construction Issues • An ocean grid in one stage represents a formidable undertaking • Staging ocean grid construction likely undermines economy • Power corridor less complicated / more manageable 14 EU Lessons Learned 22 GW operational BOY 2020 / 70 GW by 2028 • WTG size, water depth, and distance to shore steadily increased • No ocean grids North Sea Power Hub in early planning stages UK prefers “developer led” approaches with bundled G&T • Developers responsible for interconnection (PJM approach) • Radial transmission cables sold off to third parties EU TSOs build offshore “network grids” • Extensions of onshore grids, different from ocean grids • Appropriate for planning / controlling early OSW development • Early “wrong turns” (project-on-project risk) very expensive Studies have inconsistent conclusions • Larger WTGs and projects have led to lower costs • Separate G&T requires significant coordination efforts 15 Business Structure and Finance Bundled OSW G&T projects financeable • OSW developers have shown strong preference for bundled G&T Coordinated transmission must be a regulated asset • Merchant transmission model infeasible SAA coordinated transmission solution • Competition provides incentives for innovation & low cost • State / BPU cost assignment of fixed non-bypassable charges • Assured cost recovery should lower financing costs absent FERC equity adders • Potential achievement of effective cost caps, other risk mitigation measures Capital formation predicated on • Coordinated transmission solution approved by PJM • NJ agrees ratepayers will bear costs • PJM administers billing and collections 16 Environmental & Fisheries Impacts NOAA charts for context BOEM GIS shows many existing cables, mostly transatlantic telecom Cables do not cross sensitive barrier islands Habit areas of particular concern are vulnerable to degradation Future proofing to avoid multiple construction efforts 17 Environmental & Fisheries Impacts Radial export cables • More cables have greater potential impacts Ocean grids • Single construction effort may reduce permitting risk • HVDC means fewer shoreline trenches / boreholes • Additional inter-project cables required Power corridors • Single construction effort may reduce permitting risk • HVDC means fewer shoreline trenches / boreholes • HVDC cables clustered together in single ROW further minimizes impacts 18 Long-Term Planning and Flexibility Radial export cables provide limited opportunities future- proofing • Suitable for individual 1,000-1,200 MW projects • Flexible – build what’s need when needed • May not optimize POI utilization • Future projects will likely need to reach the 500kV backbone Ocean grids and power corridors provide future-proofing • Fosters optimum long-term OSW buildout • Power corridors plan for medium-term OSW buildout 19 Conclusions No single correct approach / no easy answers Objective function requires tradeoffs, i.e., environmental, cost, ratepayer risk • Reliability, in-state economic benefits, and technology choice are not meaningful differentiators Environmental efficiency and achievable mitigation strategies may drive long term solutions • SAA process should provide innovative, cost-effective options • Procurement alignment challenges appear manageable 20 Presentation: Joe DeLosa Bureau Chief of Federal and Regional Policy, NJ BPU 2/26/2021 www.nj.gov/bpu 21 State Agreement Approach Joe DeLosa Board of Public Utilities Staff February, 2021 November 18, 2020 Board Order • New Jersey has a goal of 7,500 MW of offshore wind before 2035 › Executive Order 92 • Legislation found potential benefits of shared approach to transmission & authorizes “transmission first approach: › Allows approval of an “open access offshore wind transmission facility … located either in the Atlantic Ocean or onshore, used to facilitate the collection of offshore wind energy or its delivery to the electric transmission system in this State.” N.J.S.A. 48:3-51. See also N.J.S.A. 48:3-87.1(e). › See also Energy Master Plan Goal 2.2.1, NJ OSW Strategic Plan, and November, 2019 BPU Offshore Wind technical conference. • On November 18, the Board formally requested that PJM incorporate New Jersey’s offshore wind goals into PJM’s RTEP. www.nj.gov/bpu 23 PJM State Agreement Approach (“SAA”) Collaboration • The SAA set forth in PJM’s Operating Agreement provides a vehicle for states to propose a state public policy project to PJM for inclusion in the RT EP. › PJM to post Public Policy Assumptions, pursuant to OA, Schedule 6, §§ 1.5.6(b) and 1.5.8(b). › PJM to convene a project proposal window pursuant to OA, Schedule 6, § 1.5.8(c). • New Jersey is the first state to take advantage of the PJM SAA process. • BPU Staff collaborated with PJM on preliminary analyses. › Screening Analysis » Provided information to rank potential injection locations. › Scenario Analysis » Comprehensive evaluation of scenarios created resulting from Phase 1 Screening Analysis.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    110 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us