Project Summary the Minnesota Department of Transportation Will Be Resurfacing U.S

Project Summary the Minnesota Department of Transportation Will Be Resurfacing U.S

U.S. Highway 75 Project Summary The Minnesota Department of Transportation will be resurfacing U.S. Highway 75 from Township Road 127 to the east junction of Highway 7 using cold-in-place recycling plus three inches of new pavement. The project includes upgrading sidewalks and pedestrian ramps to meet Americans with Disabilities (ADA) standards in the city of Bellingham and make them more accessible for everyone. Culverts along the project area will be lined and guardrail will be replaced. Shoulders are being increased from two-feet wide to six-feet wide and will be paved. A chip seal will be applied to the new pavement. This project will require a detour due to the extensive nature of the resurfacing. Project Location • U.S. Highway 75 from Township Road 127 to the east junction of Highway 7 Project Benefits • Smoother road surface • Enhanced safety • Improved drainage • Upgraded sidewalks and pedestrian crossings in Bellingham Project Cost • $7.9 million Contractor • Duininck, Inc. Project Timeline • Construction begins: July 6, 2020 • Construction ends: October 30, 2020 Additional Project Details • Cold-in-place recycling is a method of removing and reusing the existing asphalt surface. • Chip seals, also referred to as seal coats, protect the pavement, increase skid resistance and extend the life of the road. Although it seems natural to avoid a road that has been recently coated or fixed, chip sealing is unique in that it does not keep drivers off the road. Hwy 75 Resurfacing Project (June 2020) 1 • You can drive on a freshly chip-sealed road after it has been swept. • A road that has been chip sealed will not be as quiet as a new pavement. After a winter of plowing, the vehicle noise will diminish and you will notice that the road will not sound as loud. Contacts Nsikan Ebong, Construction Supervisor 507-537-2049 [email protected] Sandra Schlagel, Public Affairs 320-214-6362 [email protected] For more information on the project, please visit mndot.gov/d8/projects/hwy75madisontobellilngham. Hwy 75 Resurfacing Project (June 2020) 2 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us