MUMBAI SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF (MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel no. – 022-66405484 E-mail – [email protected] Ref n o. EE/City/MSIB / e-tender/Labour Soc. / 07 / 2020-21 e-TENDER NOTICE for Labour Co-op. Society registered under DDR Mumbai City District (City) Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room no. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051 for the various work from the Labour Co-Op. Society registered under appropriate class with DDR Mumbai City District (City) e- Name of Works Estimated Security Registration Tender Time limit Tender Cost. Rs. Deposit 1% of (Class) of Price for No. Estimated cost L.C.S. under including completion Rs. Deputy 12% GST of work (50% initially District in Rs. & 50% Register through bill) 1 Renovation of Sabhagruha for Sant 2136936.00 21369.00 Class-A 560.00 12 Rohidas at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 2 Concreting Work and Fixing 2059697.00 20597.00 Class-A 560.00 12 Ladikaran Near Sant Rohidas and above Months Sabhagruha at Dharavi (including (MPSSVY) (Dharavi) monsoon) 3 Renovation of Vyayamshala at Ashok 2136936.00 21369.00 Class-A 560.00 12 Mill Compound, Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 4 Construction of Wall at Ashok Mill 2136936.00 21369.00 Class-A 560.00 12 Compound, Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 5 Construction of Open Sabhagruha and 2136936.00 21369.00 Class-A 560.00 12 Fixing Shahbad Ladi Near Shahu and above Months Collage at Dharavi (including (MPSSVY) (Dharavi) monsoon) 6 Renovation of Sabhagruha for Dr. 2136936.00 21369.00 Class-A 560.00 12 Babasaheb Ambedkar at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 7 Construction of Abhyasika Behind 1716414.00 17164.00 Class-A 560.00 12 Khamba Devi Mandir at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 8 Fixing Equipment's for Open 2136936.00 21369.00 Class-A 560.00 12 Vyayamshala at N. Shivraj Udyan at and above Months Dharavi (MPSSVY) (Dharavi) (including monsoon) 9 Renovation of Abhyasika Near Mata 2059697.00 20597.00 Class-A 560.00 12 Mahakali Mandir at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 10 Concreting Work Near Bal Gopal 2059697.00 20597.00 Class-A 560.00 12 Mitra Mandal at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 11 Concreting Work at Shankar Kavade 2059697.00 20597.00 Class-A 560.00 12 Chawl at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 12 Construction of Open Sabhagruha at 2059697.00 20597.00 Class-A 560.00 12 Soneri Maidan at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 13 Construction of Toilet at Prem Nagar, 2136936.00 21369.00 Class-A 560.00 12 Dharavi (MPSSVY) (Dharavi) and above Months (including monsoon) 14 Providing and Laying Drainage Line, 2059697.00 20597.00 Class-A 560.00 12 Concreting Work and Fixing Shahbad and above Months Ladi in Premises of Kalyani Building (including at Dharavi (MPSSVY) (Dharavi) monsoon) 15 Providing and Laying Drainage Line, 1930966.00 19310.00 Class-A 560.00 12 Concreting Work and Fixing Shahbad and above Months Ladi in Premises of Ishwari Building (including at Dharavi (MPSSVY) (Dharavi) monsoon) 16 Providing and Laying Drainage Line, 2128353.00 21284.00 Class-A 560.00 12 Concreting Work and Fixing Shahbad and above Months Ladi in Premises of Netaji Building at (including Dharavi (MPSSVY) (Dharavi) monsoon) 17 Providing and Laying Drainage Line, 2136936.00 21369.00 Class-A 560.00 12 Concreting Work and Fixing Shahbad and above Months Ladi in Premises of Uday Building at (including Dharavi (MPSSVY) (Dharavi) monsoon) 18 Renovation of Sabhagruha for 2136936.00 21369.00 Class-A 560.00 12 Gitanjali Building at Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 19 Renovation of Balwadi at Ward 2136936.00 21369.00 Class-A 560.00 12 No.184, Dharavi and above Months (MPSSVY) (Dharavi) (including monsoon) 20 Construction of Retaining Wall at 1544773.00 15448.00 Class-A 560.00 12 Aayodhya Nagar Near Vashinaka, and above Months Chembur (including (RW) (Mumbai South Central) monsoon) 21 Construction of Retaining Wall at 1630593.00 16306.00 Class-A 560.00 12 Kukreja Compound Near Vashinaka, and above Months Chembur (including (RW) (Mumbai South Central) monsoon) 22 Construction of Retaining Wall Near 1458952.00 14590.00 Class-B 560.00 9 Months Panjrapol, Chembur and above (including (RW) (Mumbai South Central) monsoon) 23 Construction of Retaining Wall Near 2102607.00 21026.00 Class-A 560.00 12 Gaondevi Mandir, Byculla and above Months (RW) (Byculla) (including monsoon) 24 Construction of Retaining Wall Near 2145518.00 21455.00 Class-A 560.00 12 Vyayamshala Near Bardan Karkhana and above Months (RW) (Byculla) (including monsoon) 25 Providing and Laying Drinking Water 686566.00 6866.00 Class-B 560.00 9 Months Supply Pipe Line, Construction of and above (including Drain and Passage at Ganeshmurty monsoon) Nagar, Cuffe Parade (MLA-LAD) (Colaba) 26 Providing and Laying Drinking Water 514924.00 5149.00 Class-B 560.00 9 Months Supply Pipe Line, Construction of and above (including Drain and Fixing Ladikaran at Dr. monsoon) Babasaheb Ambedkar Nagar, Cuffe Parade Old Ambedkar Nagar Behind World Trade Building (MLA-LAD) (Colaba) 27 Providing and Laying Drinking Water 772386.00 7724.00 Class-B 560.00 9 Months Supply Pipe Line, Construction of and above (including Drain and Passage at Dr. Babasaheb monsoon) Ambedkar Nagar, Cuffe Parade (MLA-LAD) (Colaba) 28 Providing and Laying Drinking Water 686566.00 6866.00 Class-B 560.00 9 Months Supply Pipe Line, Construction of and above (including Drain and Passage at Macchimar monsoon) Nagar No.5, Cuffe Parade (MLA-LAD) (Colaba) 29 Construction of Drain and Fixing 686566.00 6866.00 Class-B 560.00 9 Months Ladikaran at Shivshakti Nagar Behind and above (including Tata Power Near Dhobhi Ghat monsoon) (MLA-LAD) (Colaba) 30 Construction of Drain, Fixing Ladi 686566.00 6866.00 Class-B 560.00 9 Months and Concreting Work at Sundari and above (including Nagari Nevy Dival and Near Darya, monsoon) Colaba (MLA-LAD) (Colaba) 31 Construction of Drain and Passage at 1004102.00 10041.00 Class-B 560.00 9 Months Dhobhighat, Dockyard Road, and above (including Mazgaon, Mumbai monsoon) (MLA-LAD) (Byculla) 32 Providing and Fixing Paver Block at 1141415.00 11414.00 Class-B 560.00 9 Months Shivdi Police Station, Darukhana, and above (including Mazgaon, Mumbai monsoon) (MLA-LAD) (Byculla) 33 Construction of Drain, Passage and 858207.00 8582.00 Class-B 560.00 9 Months Fixing Ladikaran at Ashirwad and above (including Building Compound, N. M Joshi monsoon) Marg, Mumbai (MLA-LAD) (Byculla) 34 Construction of Drain, Passage and 2145518.00 21455.00 Class-A 560.00 12 Fixing Ladikaran at Lakadi Bunder and above Months Road, Byculla (E) (including (NDVSY) (Byculla) monsoon) 35 Construction of Drain and Passage 2102607.00 21026.00 Class-A 560.00 12 and Fixing Ladikaran at B. I. T. and above Months Chawl, Agripada (NDVSY) (Byculla) (including monsoon) 36 Providing and Laying Drainage Line 2480218.00 24802.00 Class-A 560.00 12 and Construction of Drain, Passage in and above Months front of Lakhpati Hotel, Byculla (including (NDVSY) (Byculla) monsoon) 37 Construction of Drain, Passage and 2441599.00 24416.00 Class-A 560.00 12 Fixing Ladikaran Behind Punarvasit and above Months MHADA Building, Byculla (including (NDVSY) (Byculla) monsoon) 38 Construction of Shed and Providing 2469062.00 24691.00 Class-A 560.00 12 and Fixing Paver Block Behind and above Months MHADA Building, Sunder Gully (including (NDVSY) (Byculla) monsoon) 39 Providing and Fixing Tiles, Railing 858207.00 8582.00 Class-B 560.00 9 Months and Beautification Work in Open and above (including Premises at Kaveri, Krushna, Koyna, monsoon) Navi Chikhalwadi, Grant Road (MPSSVY) (Malbar Hill) 40 Construction of Vidyut Meter Cabin 858207.00 8582.00 Class-B 560.00 9 Months and Beautification Work Premises at and above (including Aruna Niwas, Lady Pochkhanwala monsoon) Road, Grant Road (MPSSVY) (Malbar Hill) 41 Providing and Laying New Drainage 858207.00 8582.00 Class-B 560.00 9 Months Line and Fixing Ladikaran at and above (including Chitrakut Building, Altamount Road monsoon) (MPSSVY) (Malbar Hill) Sr. Stage Desc. Date of Time period No 1 Publishing Date 09..12.2020, 10.00 2 Document sale start 09.12.2020, 10.05 3 Document sale end 23.12.2020, 17.35 4 Bid Submission start 09.12.2020, 10.05 5 Bid Submission end 23.12.2020, 17.35 6 Technical Bid Opening 28.12.2020, 17.35 onward 7 Price Bid Opening 29.12.2020, 17.35 onward 1. The Complete biding process will be online (etendering) in two bid system. All the notifications and detailed terms and conditions regarding this tender notice hereafter will be published on line on website http://mahatenders.gov.in MHADA Website – http://mhada.maharashtra.gov.in 2. Bidding documents can be loaded on the website http://mahatenders.gov.in from Date 09.12.2020 at 10.05 to Date 23.12.2020 upto 17.35. 3. The payment for Tender Form Fee must be made online 4. Technical bids will be opened on 28.12.2020, 17.35 onward & Price bids will be Opened on 29.12.2020, 17.35 onward at the office of the Executive Engineer (City)/MSIB Room no. 539 4th floor Mhada Kalanagar Bandra (East) Mumbai–400051 on web site http://mahatenders.gov.in 5.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-