State of Hawaii Projects

State of Hawaii Projects

OAHU TRANSPORTATION IMPROVEMENT PROGRAM, FYS 2004-2006 AS OF AMENDMENT #13 Project Status Report for Federally-Funded Projects in Federal Fiscal Year 2005 As of September 30, 2005 STATE OF HAWAII PROJECTS ESTIMATED TEA-21 OBLIGATED Project Phase in FY 2005 FUNDING STATUS (Yes/No) (x $1,000) CATEGORY FEDERAL HIGHWAY ADMINISTRATION Farrington Highway, Bridge Tl P Am #13 split Replacement, Makaha Bridges up ROW into2 #3 and #3A parts, prelim in Replace timber bridges in the FY '05 and Acq. 52 ROW 1,300 Bridge On-System No vicinity of Makaha Beach Park. in FY '06. Prelim ROW was obligated in FY '04. Fort Barrette Road Widening, Farrington Highway to Franklin D. Roosevelt Avenue Minimum S6 Widen the roadway to four lanes. ROW 170 Guarantee Improvements include right- and Yes lefHuming lanes, sidewalks, bikeways, highway lighting, drainage, traffic signals, and landscaping. Fort Weaver Road Widening, Vicinity of Aawa Street to Congestion Geiger Road Mitigation and Air CON 45,800 Quality Yes S7 Widen the roadway to six lanes. Improvements include turning ROW 100 Congestion lanes, traffic signal modifications, Mitigation and Air and additional highway lighting. Quality Interstate Route HM1, Guardrail and Shoulder Improvements, Waikele Bridge to Airport Section 106 Interchange Interstate could not be S17 CON 4,300 Install and/or upgrade the existing Maintenance processed in No. guardrails, end terminals, time. Will be transitions, bridge railing, bridge proposed to be endposts, and crash attenuators, added to FY '06. Project will also reconstruct and pave road shoulders. Interstate Route H~1, Highway Lighting Improvements, Vicinity of Kaimakani Overpass Interstate S18 ESD 600 Yes to Vicinity of Gulick Avenue Maintenance Upgrade and replace existing highway lighting. Interstate Route HM1, Interstate S22 Rehabilitation, Kaahumanu CON 15,000 Maintenance Yes Street to Kaimakani Street Resurface existing roadway. OAHU TRANSPORTATION IMPROVEMENT PROGRAM, FYS 2004-2006 AS OF AMENDMENT #13 Project Status Report for Federally-Funded Projects in Federal Fiscal Year 2005 As of September 30, 2005 STATE OF HAWAII PROJECTS ESTIMATED TEA-21 OBLIGATED Project Phase in FY 2005 FUNDING STATUS (Yes/No) (X $1 ,000) CATEGORY Interstate Route H-1, Waiawa Interchange, Westbound, Additional Westbound Lane Local funds only. Construct an additional lane National Highway 527 DES 2,500 No In FY '07 of FYs through the Waiawa Interchange, System '06-'08 STIP. beginning in the vicinity of the Pearl City Viaduct and ending at the Paiwa Interchange. Interstate Route H-1, Waiawa Interchange, Westbound, Local funds only. Waipahu Off-Ramp Interstate 528 DES 3,000 No In FY '07 of FYs Improvements Maintenance '06-'08 STIP. Widen the Waipahu off·ramp from one to two lanes. Interstate Route H-1, Ward Avenue On-Ramp to University Interchange National Highway Local funds only. 529 PLN 1,500 No Improve eastbound traffic flow System No PM. from the Ward A venue on~ramp to the University interchange. James Campbell National Wildlife Refuge Public Lands 534 DES 30 No Dropped. To be administered by the U.S. Discretionary Fish and Wildlife Service. Kalanianaole Highway, Bridge Replacement, lnoaole Stream Bridge (Near Bellows Air Force Station, Deferred. Waimanalo). Replace existing National Highway Proposed for 536 ROW 525 No bridge wl1h a larger bridge. System addition to FY Project will include improvements '06. to the roadway approaches, detour road, and utility relocations. Kalanianaole Highway Improvements, Olomana Golf Course to Waimanalo Beach Park Improvements include the National Highway Deferred. In FY S38 construction of turning lanes, DES 625 No System '06. sidewalks, wheelchair ramps, bike paths or bike lanes, traffic signal upgrades, utility relocations, and drainage improvements. OAHU TRANSPORTATION IMPROVEMENT PROGRAM, FYS 2004-2006 AS OF AMENDMENT #13 Project Status Report for Federally-Funded Projects in Federal Fiscal Year 2005 As of September 30, 2005 STATE OF HAWAII PROJECTS ESTIMATED TEA-21 OBLIGATED Project Phase in FY 2005 FUNDING STATUS (Yes/No) (x $1,000) CATEGORY Kalanianaole Highway, Deferred. Intersection Improvements at National Highway Proposed for 840 Hanauma Bay CON 2,000 No System addition to FY Construction of left-turn lane into '06. Hanauma Bay. Kamehameha Highway, Bridge Replacement, Kaluanui Stream Bridge (Hauula, near Sacred Falls State Park) Replace the existing bridge 845 ROW 700 Bridge On-System Yes with a concrete structure that meets current design standards. The new structure will accommodate sidewalks and bridge railings. Kamehameha Highway, Bridge Replacement, Waiahole Bridge Replace the existing bridge with a Deferred. concrete structure that meets 640 Bridge On-System Proposed for 852 current design standards. The ROW No 6,055 Bridge On-System addition to FY new structure will accommodate CON '06. two 12-foot wide lanes, shoulders, sidewalks, and bridge railings. Kamehameha Highway, Highway Lighting Improvements, MP 20.7 to MP National Highway Obligated with 853 DES 400 Yes 23.8 System 818 and 869. Upgrade and replace existing highway lighting. Kamehameha Highway Improvements, Waipahu Street to Ka Uka Boulevard Improve traffic operations and do National Highway 854 other improvements, such as ROW 150 Yes System sidewalk, bikeway, highway lighting, drainage along this segment of Kamehameha Highway. Kamehameha Highway, Rehabilitation of Laieloa Stream Bridge 856 (Laie) Rehabilitate the existing DES 725 Bridge On-System Yes bridge to meet current design standards. The bridge will be widened and have bridge railings. OAHU TRANSPORTATION IMPROVEMENT PROGRAM, FYS 2004-2006 AS OF AMENDMENT #13 Project Status Report for Federally-Funded Projects in Federal Fiscal Year 2005 As of September 30, 2005 STATE OF HAWAII PROJECTS ESTIMATED TEA-21 OBLIGATED Project Phase in FY 2005 FUNDING STATUS (Yes/No) (x $1 ,000) CATEGORY Kamehameha Highway, Rehabilitation of Waipilopilo Stream Bridge 859 (Hauula) Rehabilitate the existing DES 590 Bridge On-System Yes bridge to meet current design standards. The bridge will be widened and have bridge railings Kamehameha Highway, Rockfall Protection at Waimea Bay, MP 5.4 to MP 5.52 (Kahaluu) Construct various rockfall/slope protection and National Highway Local funds only. S61 DES 1.000 No slope stabilization measures at System No PM. various locations. Such measures include rock bolts, rock catchment fences, recutting and/or revegetation of slopes. 864 Kamehameha Highway Widening, Lanikuhana Avenue to Ka Uka Boulevard National Highway Widen Kamehameha Highway to PLN 1,500 Yes System a four-lane divided facility with shoulders for bicycles and disabled vehicles. S66 Leeward Community College (LCC) Second Access Improvements 1,000 Deferred to FY Construct a second access to DES Local No 500 '07. LCC between the West side of ROW Local the LCC campus to the Waipio Point Access Road. 868 Moanalua Freeway and Interstate H~2 Freeway, Guardrail and Shoulder Interstate Improvements DES 250 Yes Maintenance Install and/or upgrade the existing guardrails. Reconstruct and pave road shoulders. 869 Moanalua Freeway, Highway Lighting Improvements MP 0 to Interstate Obligated with MP 0.73 and MP 1.12 to MP 4.09 DES 100 Yes Maintenance S18&S53. Upgrade and replace existing highway lighting. 870 Moanalua Freeway, Seismic Retrofit, Puuloa Interchange, Puuloa Separation DES 1,230 Bridge On-System Yes Retrofit current bridge to meet - current State seismic criteria. OAHU TRANSPORTATION IMPROVEMENT PROGRAM, FYS 2004-2006 AS OF AMENDMENT #13 Project Status Report for Federally-Funded Projects in Federal Fiscal Year 2005 As of September 30, 2005 STATE OF HAWAII PROJECTS ESTIMATED TEA-21 OBLIGATED Project Phase in FY 2005 FUNDING STATUS (Yes/No) (x $1,000) CATEGORY 574 North/South Road, Kapolei Parkway to Vicinity of ROW 500 STP Flexible Interstate Route H-1 CON 6,750 STP Flexible Yes Construct a three-lane roadway CON 13,250 High Priority from Kapolei Parkway to Interstate Route H-1. 583 Oahu Railway and Land (OR&L), Repair Tracks, Fort Weaver Road to Kahe Point Environmental Purchase cross-ties, spikes and docs not ready. EQP 50 STP Enhancement No other track hardware to restore May go all local the historic OR&L right-of-way funds. from Fort Weaver Road in Ewa to Tracks Beach at Kahe Point. Sand Island Tunnel - Kalihi Channel This project was Demolish the existing Sand National Highway 576 PLN 2,000 No dropped by Island Bridge and construct a System Harbors Division. new four-lane Sand Island Tunnel beneath the Kalihi Channel. Vanpool Program Congestion Encourage ridesharing during the Mitigation and Air peak commuting hours to reduce Quality congestion by providing qualified OPER 800 FHWA funds sao Yes users with a State-subsidized OPER 1,040 transferred van. from FTA Sec. 5307 (C17 below) Elderly & Persons w/ Disabilities Program Vehicle Acquisition for Urban Areas The FTA Section 5310 program provides assistance for the S84 purpose of providing EQP 415 FTA §5310 transportation seNices to meet the special needs of elderly and disabled persons where mass transportation seNices are unavailable, insufficient, or inappropriate. OAHU TRANSPORTATION IMPROVEMENT PROGRAM, FYS 2004-2006 AS OF AMENDMENT #13 Project Status Report for Federally-Funded Projects in Federal Fiscal Year 2005 As of September 30, 2005 CITY AND COUNTY OF HONOLULU PROJECTS ESTIMATED TEA-21 OBLIGATED Project Phase in FY 2005 FUNDING STATUS (Yes/No) (x $1,000) CATEGORY FEDERAL HIGHWAY ADMINISTRATION Bridge Inspection and Appraisal Programming Program documents for Inventory, inspect, and appraise planning funds C1 City bridges, including underwater PLN 350 Bridge Off-System No have not been inspections, scour analyses, submitted to the surveys, and preparation of plans State. Will not for bridge repairs. program funds. Computerized Traffic Control Ph 6 System Construction - Upgrade and expand fiberoptic Programming of fines, CCTV cameras, data funds completed collection, and signal control in on 9/14/05. urban center and outlying areas STP-001 (23) for connectivity to the Traffic PH 9 Design- Control Center. Programming of Phase 6 funds completed C2 CON 1,945 STP Flexible Yes Phase 9 on 8/8/05.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us