Galveston District

Galveston District

FY20 CONTRACT SCHEDULES GALVESTON DISTRICT Christopher Frabotta Deputy Chief, Operations Galveston District Southwestern Division Date: 13 November 2019 2 GALVESTON DISTRICT NAVIGATION PROJECTS . 6 Deep-draft Navigation Complexes . 1,000+ Miles of Deep- and shallow-draft channels . 379-miles of GIWW . 8 Jetty Systems . 2 Sets of Nav Structures . 3 Strategic Ports . 600M+ tons of Commercial Cargo during 2017 . 20-30 million cubic yards / year . 21.4% of Nation’s Tonnage . 29.2% of Nation’s Exports . 11.6% of Nation’s Tonnage through Galveston Entrance 3 SOUTHWESTERN DIVISION & GALVESTON DISTRICT POINTS-OF-CONTACT SOUTHWESTERN DIVISION Elaine Newbaker-London Navigation Businessline Manager 469-487-7050 [email protected] GALVESTON DISTRICT GALVESTON DISTRICT Joe Hrametz Aron Edwards Chief, Operations Division Operations Manager 409-766-3070 409-766-3028 [email protected] [email protected] Chris Frabotta Belynda Kinman Deputy Chief, Operations Division Operations Manager 409-766-3071 409-766-6323 [email protected] [email protected] Tricia Campbell Carlos Tate Operations Manager Project Manager 409-766-3153 409-766-3819 [email protected] [email protected] Seth Jones Franchelle Craft Operations Manager Project Manager 409-766-3068 409-766-3187 [email protected] [email protected] 4 GALVESTON DISTRICT O&M NAVIGATION FUNDING HISTORY 5 6 SABINE-NECHES WATERWAY - OUTER BAR & BANK CHANNELS 7 SABINE-NECHES WATERWAY - ANCHORAGE BASIN NO. 1 (NEW WORK) 8 SABINE-NECHES WATERWAY - ANCHORAGE BASIN NO. 1 (NEW WORK) 9 10 GALVESTON HARBOR – GALVESTON HARBOR MAINTENANCE & NEW WORK 11 12 TEXAS CITY – MAIN CHANNEL & TURNING BASIN 13 14 HOUSTON SHIP CHANNEL – EXXON TO CARPENTERS & JACINTOPORT 15 16 FREEPORT HARBOR – JETTY CHANNEL & INSIDE CHANNEL (TASK ORDER) 17 18 MATAGORDA SHIP CHANNEL – MATAGORDAG PENINSULA TO POINT COMFORT 19 20 CORPUS CHRISTI SHIP CAHANNEL – INNER BASIN TO VIOLA CORPUS CHRISTI SHIP CAHANNEL – 21 CHANNEL IMPROVEMENT PROJECT (LOWER BAY REACH) 22 CORPUS CHRISTI SHIP CHANNEL – CHANNEL IMPROVEMENT PROJECT (CONTRACT NO. 3) 23 24 BRAZOS ISLAND HARBOR – JETTY CHANNEL 25 EXAMPLE SLIDES 26 MOUTH OF THE COLORADO – JETTY & MAIN CHANNELS 27 CHANNEL TO VICTORIA – MAINTENANCE DREDGING 28 CHANNEL TO PORT MANSFIELD – JETTY & MAIN CHANNELS MAINTENANCE DREDGING 29 GULF INTRACOASTAL WATERWAY – ROLLOVER TO CAUSEWAY & BOLIVAR FLARE 30 GULF INTRACOASTAL WATERWAY – CAUSEWAY TO BASTROP 31 GULF INTRACASTAL WATERWAY – FREEPORT TO UPPER MATAGORDA BAY 32 GULF INTRACOASTAL WATERWAY – MATAGORDA BAY TO CORPUS CHRISTI BAY (ACROSS SAN ANTONIO BAY) 33 GULF INTRACOASTAL WATERWAY – CORPUS CHRISTI TO PORT ISABEL / CHANNEL TO HARLINGEN 34 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us