INFRA Grant Application Summary Was an INFRA application for this project submitted previously? No If yes, what was the name of the project in the previous application? Previously Incurred Project Cost $0 Future Eligible Project Cost $48,000,000 Total Project Cost (This should be the sum of the previous two rows) $48,000,000 INFRA Request $23,000,000 Total Federal Funding (including INFRA) $ $23,000,000 Are matching funds restricted to a specific project component? No If so, which one? Is the project or a portion of the project currently located on National Highway Freight No Network? Is the project or a portion of the project located on the NHS? Yes Does the project add capacity to the Interstate system? No Is the project in a national scenic area? No Do the project components include a railway-highway grade crossing or grade separation No project? If so, please include the grade crossing ID. Do the project components include an intermodal or freight rail project, or freight project within the boundaries of a public or private freight rail, water (including ports), or No intermodal facility? If answered yes to either of the two component questions above, how much of NA requested INFRA funds will be spent on each of these projects components? State(s) in which project is located Florida Small or large project Small Urbanized Area in which project is located, if applicable Jacksonville Population of Urbanized Area 1.15M Is the project currently programmed in the: TIP No STIP No MPO Long Range Transportation Plan Yes State Long Range Transportation Plan N/A State Freight Plan No If selected, would you be interested in participating in a new environmental review and permitting approach Yes Executive Summary The Florida Department of Transportation (FDOT) in cooperation with the City of Jacksonville, Jacksonville Port Authority (JAXPORT), and Jacksonville Transportation Authority (JTA), is pleased to submit this grant application requesting $23 million in INFRA funding for the Talleyrand Connector in Jacksonville, Florida. The Talleyrand Connector will remove obstacles to goods movement in Northeast Florida’s international gateway to trade. The Talleyrand Connector proposes to remove and reconfigure the existing Hart Expressway (National Highway System facility) elevated ramp from A. Philip Randolph Boulevard to Festival Park Avenue, providing; 1) new freight access to the Talleyrand Port District; 2) freight and vehicle congestion relief along multiple points of the Hart Expressway; and 3) improved connectivity to eastern downtown Jacksonville. The Talleyrand Connector is the final piece of a larger initiative to improve freight access in Northeast Florida. By virtue of its geography and robust freight infrastructure network, Jacksonville is a logistics hub and gateway to the southeastern United States. Improving freight flow at this location benefits freight traveling to, from and through Northeast Florida to and from the southeastern United States and internationally via the Talleyrand Port District at the Port of Jacksonville. The FDOT and the City of Jacksonville are committed to providing $25 million in matching funds for the $48 million project. Summary of Benefits MERIT CRITERIA HOW CRITERIA ARE MET Eliminates a freight bottleneck on the freight corridor connecting I-95 and the Talleyrand Port District. This freight corridor is used to move goods throughout the Support for National or southeast U.S. and internationally via the Port of Jacksonville. Regional Economic Preserves Northeast Florida’s working waterfronts dependent on deep water, rail, Vitality and highway access. Supports opportunities for port redevelopment and expansion. Leveraging of Federal Leverages $95 million of recently expended and committed Federal and State Funding investments on this freight corridor. Utilizes FDOT’s environmental streamlining measures including NEPA delegation and State-wide Environmental Project Tracker. Potential for Innovation Completes Intelligent Transportation System (ITS) infrastructure on this freight corridor which is centrally managed at the state-of-the-art Regional Transportation Management Center (RTMC). Performance and Proposes to condition funding on the timely start of design build procurement in Accountability January 2019 which allows for construction to begin in January 2020. i Table of Contents 1.0 Project Description ....................................................................... 1 Project Improvements .................................................................................... 3 National and Regional Significance .................................................................................... 5 Transportation Challenges and Solutions ........................................................................ 6 2.0 Project Location ............................................................................ 9 3.0 Project Parties ............................................................................. 10 City of Jacksonville ........................................................................................ 10 Jacksonville Port Authority (JAXPORT) .................................................... 10 Jacksonville Transportation Authority (JTA) ........................................... 10 4.0 Grant Funds & Sources & Uses of Project Funds ................... 11 5.0 Merit Criteria ................................................................................ 12 Criterion #1: Support for National or Regional Economic Vitality .... 12 Support for National or Regional Economic Vitality ................................................. 12 Benefit Cost Analysis ................................................................................................................ 12 Criterion #2: Leveraging of Federal Funding .......................................... 13 Leveraging Transportation Investments ......................................................................... 14 Non-Federal Share across Program .................................................................................. 15 Full Lifecycle Costs ..................................................................................................................... 16 Criterion #3: Potential for Innovation ....................................................... 16 Innovation in Environmental Review and Permitting .............................................. 16 Innovation in Safety and Technology .............................................................................. 16 Criterion #4: Performance and Accountability ....................................... 17 6.0 Project Readiness ........................................................................ 17 Technical Feasibility ....................................................................................... 17 Project Schedule ............................................................................................. 17 Project Approvals ........................................................................................... 18 NEPA ..................................................................................................................................................... 18 State and Local Planning ...................................................................................................... 18 Project Risks .................................................................................................... 18 7.0 Large/Small Project Requirements .......................................... 19 ii List of Figures Figure 1: Project Location ...................................................................................................................................................................................... 2 Figure 2: Project Improvements ........................................................................................................................................................................ 3 Figure 3: One-Day Truck Drive ............................................................................................................................................................................ 5 Figure 4: Area Freight Generators ..................................................................................................................................................................... 6 Figure 5: PM Peak Congestion ............................................................................................................................................................................ 7 Figure 6: Existing Design Deficiencies ............................................................................................................................................................ 8 Figure 7: Five Year Work Program (FY 2017-2021) ............................................................................................................................ 16 Figure 8: Project Schedule .................................................................................................................................................................................. 17 List of Tables Table 1: Benefits of the Talleyrand Connector .......................................................................................................................................... 4 Table 2: Committed Funding Sources .......................................................................................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages24 Page
-
File Size-