FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office National Capital Region 1,651 projects 44,524,084,000 Las Piñas-Muntinlupa District Engineering Office 127 projects 2,935,899,000 CITY OF LAS PIÑAS 88 projects 1,857,184,000 OO1: Ensure Safe and Reliable National Road System 3 projects 154,500,000 Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long 150,000,000 Span Bridges 1. P00402135LZ 310206100029000 150,000,000 C-5-Quirino Flyover P00402135LZ-CW1 Construction of Flyover - Construction of Square 1,050.000 144,750,000 Central Office / C-5-Quirino Flyover Flyover meters National Capital Region P00402135LZ-EAO 5,250,000 Central Office / National Capital Region Bridge - Retrofitting/ Strengthening of Permanent Bridges 4,500,000 2. P00401578LZ 310303100807000 2,000,000 Zapote Br. 2 (EB) (B01798LZ) along Zapote-Alabang Rd P00401578LZ-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 1,960,000 Las Bridge - Zapote Br. 2 (EB) Strengthening of Bridges Piñas-Muntinlupa (B01798LZ) along Zapote-Alabang Bridge District Rd Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00401578LZ-EAO 40,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 3. P00401579LZ 310303100808000 2,500,000 Zapote Br. 3 (WB) (B01799LZ) along Zapote-Alabang Rd P00401579LZ-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 2,450,000 Las Bridge - Zapote Br. 3 (WB) Strengthening of Bridges Piñas-Muntinlupa (B01799LZ) along Zapote-Alabang Bridge District Rd Engineering Office / Las Piñas-Muntinlupa District Engineering Office MYPS: 03/04/2020 03:47:18 pm Page 1 of 561 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00401579LZ-EAO 50,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office OO2: Protect Lives and Properties Against Major Floods 13 projects 858,684,000 Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 858,684,000 4. P00420187LZ 320101104046000 300,000,000 Construction of Flood Control Structures along Zapote River and its tributaries (Upstream), Las Piñas City P00420187LZ-CW1 Construction of Flood Mitigation Construction of Lineal 2,144.000 289,500,000 Central Office / Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures along Zapote Structure District River and its tributaries Engineering Office (Upstream), Las Piñas City P00420187LZ-EAO 10,500,000 Central Office / Las Piñas-Muntinlupa District Engineering Office 5. P00421206LZ 320101104045000 100,000,000 Construction of Flood Control Structures along Las Piñas River and Its Tributaries, Las Piñas City P00421206LZ-CW1 Construction of Flood Mitigation Construction of Lineal 680.000 96,500,000 Central Office / Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures along Las Piñas Structure District River and Its Tributaries, Las Piñas Engineering Office City P00421206LZ-EAO 3,500,000 Central Office / Las Piñas-Muntinlupa District Engineering Office 6. P00421207LZ 320101104047000 58,000,000 Construction of Flood Control Structures including Maintenance Road at Tartar Creek, Las Piñas City P00421207LZ-CW1 Construction of Flood Mitigation Construction of Lineal 386.000 55,970,000 Central Office / Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures including Structure District Maintenance Road at Tartar Creek, Engineering Office Las Piñas City P00421207LZ-EAO 2,030,000 Central Office / Las Piñas-Muntinlupa District Engineering Office MYPS: 03/04/2020 03:47:18 pm Page 2 of 561 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 7. P00421208LZ 320101104459000 50,000,000 Rehabilitation/ Improvement of Drainage at Zapote and its Vicinity (Pamplona and Pulangupa), Las Pinas City P00421208LZ-CW1 Rehabilitation / Major Repair of Rehabilitation / Lineal 1,387.758 49,000,000 Las Flood Control Structure - Major Repair of meters Piñas-Muntinlupa Rehabilitation/ Improvement of Flood Control District Drainage at Zapote and its Vicinity Structure Engineering Office (Pamplona and Pulangupa), Las / Las Pinas City Piñas-Muntinlupa District Engineering Office P00421208LZ-EAO 1,000,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 8. P00421287LZ 320101104033000 80,000,000 Constrction of Revetment along Kaybuboy Creek Tributary, Sta. 1+120.40 to Sta. 1+276 (RS), Las Piñas City P00421287LZ-CW1 Construction of Revetment - Construction of Lineal 155.600 77,200,000 Central Office / Constrction of Revetment along Revetment meters Flood Control Kaybuboy Creek Tributary, Sta. Management 1+120.40 to Sta. 1+276 (RS), Las Cluster Piñas City P00421287LZ-EAO 2,800,000 Central Office / Flood Control Management Cluster 9. P00421543LZ 320101104451000 30,000,000 Construction of Flood Control Structure along Zapote River, Las Piñas P00421543LZ-CW1 Construction of Flood Mitigation Construction of Lineal 251.000 29,400,000 Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structure along Zapote Structure District River, Las Piñas Engineering Office / Las Piñas-Muntinlupa District Engineering Office MYPS: 03/04/2020 03:47:18 pm Page 3 of 561 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00421543LZ-EAO 600,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 10. P00421544LZ 320101104452000 30,000,000 Construction of Flood Control Structure, Dalig Creek, Las Piñas City P00421544LZ-CW1 Construction of Flood Mitigation Construction of Lineal 228.500 29,400,000 Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structure, Dalig Creek, Las Structure District Piñas City Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00421544LZ-EAO 600,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 11. P00421545LZ 320101104453000 30,000,000 Construction of Flood Control Structures along Las Piñas River (Verdant), and Its Tributaries, Las Piñas City P00421545LZ-CW1 Construction of Flood Mitigation Construction of Lineal 61.000 29,400,000 Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures along Las Piñas Structure District River (Verdant), and Its Tributaries, Engineering Office Las Piñas City / Las Piñas-Muntinlupa District Engineering Office P00421545LZ-EAO 600,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 12. P00421546LZ 320101104454000 50,000,000 Construction of Flood Control Structures along Las Piñas River, Las Piñas City MYPS: 03/04/2020 03:47:18 pm Page 4 of 561 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00421546LZ-CW1 Construction of Flood Mitigation Construction of Lineal 284.000 49,000,000 Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures along Las Piñas Structure District River, Las Piñas City Engineering Office / Las Piñas-Muntinlupa District Engineering Office P00421546LZ-EAO 1,000,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 13. P00421547LZ 320101104455000 25,000,000 Construction of Flood Control Structures and other Improvements at Manarigo, Las Piñas City P00421547LZ-CW1 Construction of Flood Mitigation Construction of Lineal 154.000 24,500,000 Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures and other Structure District Improvements at Manarigo, Las Engineering Office Piñas City / Las Piñas-Muntinlupa District Engineering Office P00421547LZ-EAO 500,000 Las Piñas-Muntinlupa District Engineering Office / Las Piñas-Muntinlupa District Engineering Office 14. P00421548LZ 320101104456000 25,000,000 Construction of Flood Control Structures and other Improvements at Pasong Baka, Las Piñas City P00421548LZ-CW1 Construction of Flood Mitigation Construction of Lineal 250.000 24,500,000 Las Structure - Construction of Flood Flood Mitigation meters Piñas-Muntinlupa Control Structures and other Structure District Improvements at Pasong Baka, Las Engineering Office Piñas City / Las Piñas-Muntinlupa District Engineering Office MYPS: 03/04/2020 03:47:18 pm Page 5 of 561 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    561 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us