Solukhumbu District EOI : DOED/EOI/05/NCB/2075/76/S Office Name: Department of Electricity Development Office Address: Sanogaucharan, Gyaneshwor Kathmandu

Solukhumbu District EOI : DOED/EOI/05/NCB/2075/76/S Office Name: Department of Electricity Development Office Address: Sanogaucharan, Gyaneshwor Kathmandu

EXPRESSION OF INTEREST (EOI) Title of Consulting Service: DOED/EOI/05/NCB/2075/76/S Method of Consulting Service: National Project Name : Feasibility and Environmental Impact Assessment (EIA) study of Middle Inkhu Hydropower Project (25.3 MW), Solukhumbu District EOI : DOED/EOI/05/NCB/2075/76/S Office Name: Department of Electricity Development Office Address: Sanogaucharan, Gyaneshwor Kathmandu Funding agency : Government Budget ABBREVIATIONS CV - Curriculum Vitae DoED - Department of Electricity Development EA - Executive Agency EOI - Expression of Interest GON - Government of Nepal MOFE - Ministry of Forest and Environment MoEWRI- Ministry of Energy, Water Resource and Irrigation PAN - Permanent Account Number PPA - Public Procurement Act PPR - Public Procurement Regulation PRoR - Peaking Run-off River RoR - Run-off River TOR - Terms of Reference VAT - Value Added Tax Table of Contents Section I. A. Request for Expression of Interest 4 Section II. B. Instructions for submission of Expression of Interest 6 Section III. C. Objective of Consultancy Services or Brief TOR 8 Section IV. D. Evaluation of Consultant's EOI Application 14 Section V. E. EOI Forms and Formats 17 A. Request for Expression of Interest Request for Expression of Interest Government of Nepal (GoN) Name of Employer: Department of Electricity Development Date: 30-04-2019 05:00 Name of Project: Feasibility and Environmental Impact Assessment (EIA) study of Middle Inkhu Hydropower Project (25.3 MW), Solukhumbu District 1. Government of Nepal (GoN) has allocated fund toward the cost of Feasibility and Environmental Impact Assessment (EIA) study of Middle Inkhu Hydropower Project (25.3 MW), Solukhumbu District and intend to apply portion of this fund to eligible payments under the Contract for which this Expression of Interest is invited for National consulting service 2. The Department of Electricity Development now invites Expression of Interest (EOI) from eligible consulting firms (“consultant”) to provide the following consulting services: Feasibility and Environmental Impact Assessment (EIA) study of Middle Inkhu Hydropower Project (25.3 MW), Solukhumbu District 3. Interested eligible consultants may obtain further information and EOI document free of cost at the address Department of Electricity Development,Department of Electricity Development Sanogaucharan, Gyaneshwor Kathmandu, Nepal during office hours on or before 21-05-2019 12:00 or visit e-GP system www.bolpatra.gov.np/egp or visit the client’s website http://doed.gov.np/ 4. Consultants may associate with other consultants to enhance their qualifications. 5. Expressions of interest shall be delivered online through e-GP system www.bolpatra.gov.np/egp on or before 21-05-2019 12:00 6. In case the last date of obtaining and submission of the EOI documents happens to be a holiday, the next working day will be deemed as the due date but the time will be the same as stipulated. 7. EOI will be assessed based on Qualification 35.0 %, Experience 55.0 %, and Capacity 10.0 % of consulting firm and key personnel. Based on evaluation of EOI, only shortlisted firms will be invited to submit technical and financial proposal through a request for proposal. 8. Minimum score to pass the EOI is 60 B. Instructions for Submission of Expression of Instructions for Submission of Expression of Interest 1. Expression of Interest may be submitted by a sole firm or a joint venture of consulting firms. 2. Interested consultants must provide information indicating that they are qualified to perform the services (descriptions, organization and employee and of the firm or company, description of assignments of similar nature completed in the last 7 years and their location, experience in similar conditions, general qualifications and the key personnel to be involved in the proposed assignment). 3. This expression of interest is open to all eligible consulting firm/ company/ organization or JV of consulting firm/ company/ organization. 4. In case, the applicant is individual consultant, details of similar assignment experience, their location in the previous 4 years and audited balance sheet and bio data shall be considered for evaluation. 5. The assignment has been scheduled for a period of 24 months. Expected date of commencement of the assignment is October 2019. 6. A Consultant will be selected in accordance with the QCBS method. 7. Expression of Interest should contain following information: (i) A covering letter addressed to the representative of the client on the official letter head of company duly signed by authorized signatory. (ii) Applicants shall provide the following information in the respective formats given in the EOI document: • EOI Form: Letter of Application (Form 1) • EOI Form: Applicant’s Information (Form 2) • EOI Form: Work Experience Details (Form 3(A), 3(B) & 3(C)) • EOI Form: Capacity Details (Form 4) • EOI Form: Key Experts List (form 5). 8. Applicants may submit additional information with their application but shortlisting will be based on the evaluation of information requested and included in the formats provided in the EOI document. 9. The Expression of Interest (EOI) document must be duly completed and submitted in sealed envelope and should be clearly marked as “EOI Application for Short-listing for the Feasibility and Environmental Impact Assessment (EIA) study of Middle Inkhu Hydropower Project (25.3 MW), Solukhumbu District.The Envelope should also clearly indicate the name and address of the Applicant. Alternatively, applicants can submit their EOI application through e-GP system by using the forms and instructions provided by the system. 10. The completed EOI document must be submitted on or before the date and address mentioned in the “Request for Expression of Interest”. In case the submission falls on public holiday the submission can be made on the next working day. Any EOI Document received after the closing time for submission of proposals shall not be considered for evaluation. C. Objective of Consultancy Services or Brief TOR A. OBJECTIVE OF CONSULTANCY SERVICES OR BRIEF TOR 1. OBJECTIVE OF STUDY The main objective of the consulting services is to conduct the Feasibility and EIA Study of the Middle Inkhu Hydropower Project. The current consulting service seeks the attractiveness of the Project for development. The Consultant needs to evaluate the viability of the project in technical, financial, socio-economic, institutional, and environmental along with other relevant aspects of project development based on detailed field surveys, investigations analysis, design, cost estimate and economical & financial analysis. The Feasibility Study shall include collection of secondary data, literature review, reconnaissance of project area, relevant baseline investigations, assessments and plans, alternative layout, optimization and cost estimates regarding technical, economic/financial, environmental, and socio-economic aspects, preparation of drawings, carry out economic and financial analysis within the stipulated time. The objective is also to conduct an Environmental Impact Assessment (EIA) Study based on the plan and design of the project proposed at feasibility level including social safeguard related studies. The output should be in the form of a bankable report that will analyze and document all important aspects required for the formal approval of the project by concerned government authorities of Nepal as well as potential financing partners. The Consultant shall follow National/International best practice during survey, design and report preparation in close coordination with DoED. 2. SCOPE OF WORKS The Consultant shall collect and review all available, relevant reports, data and information. The Consultant shall then identify and recommend the extent of studies that will be necessary to complete the full feasibility study and EIA study of the project. The Consultant shall submit all the drawings, formats, engineering calculations and reports to DoED for review. If DoED requires any changes, they shall be incorporated accordingly. However, the Inception Report must be accepted by DoED before any further work is embarked upon. The plant capacity should be designed based on the optimization study. Topographic surveys and field investigations shall be described in the proposal and a program for this work shall be further detailed and updated in the Inception Report. The work plan prepared as part of the proposal shall be updated in light of the information collected and program for surveys and field investigations shall be updated. The work plan shall show all contemplated activities which will be performed during the course of the study work. The work shall be broken down into discrete elements and the duration, scheduling, and resources required for each element shall be displayed on Critical Path Method Scheduling. The Consulting Service is divided into two components: • Feasibility Study, and • Environmental Impact Assessment (EIA) study including social safeguard related studies Both of those services shall be carried out simultaneously. The Feasibility Study report shall contain, apart from other studies a short description of the EIA component, while the detailed report on EIA shall be presented separately. The Feasibility Study shall be carried out in accordance with this TOR. For any other matters not covered in the TOR, the Consultant should refer the Guidelines for Study of Hydropower Projects (2018) or equivalent study guideline for similar works and Design Guidelines,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    33 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us