, Anglo American Platinum – Rustenburg Platinum Mines, Rustenburg Process Operations: Regulation 34 Environmental Report Prepared for Anglo American Platinum Limited Report Number 558834 Report Prepared by November 2020 SRK Consulting: 558834: Rustenburg Process Operations: External Environmental Audit, undertaken during August 2020 Page i Anglo American Platinum – Rustenburg Platinum Mines, Process Operations: Regulation 34 Environmental Audit of 2020 Anglo American Platinum Limited SRK Consulting (South Africa) (Pty) Ltd 265 Oxford Rd Illovo 2196 Johannesburg South Africa e-mail: [email protected] website: www.srk.co.za Tel: +27 (0) 11 441 1111 Fax: +27 (0) 11 880 8086 SRK Project Number 558834 November 2020 Compiled by: Peer Reviewed by: Ashleigh Maritz Franciska Lake Senior Environmental Scientist Partner Email: [email protected] Authors: Franciska Lake, Ashleigh Maritz, Kavilan Naidoo MARA/NKAV/LAKF 558834_RPM_EMPR_Final Reg 34 Audit Report_20201130 November 2020 SRK Consulting: 558834: Rustenburg Process Operations: External Environmental Audit, undertaken during August 2020 Page ii Executive Summary SRK Consulting (Pty) Ltd (SRK) was appointed by Rustenburg Platinum Mines Limited (RPM) to conduct the external environmental audit of the commitments contained in the Consolidated Retained Operations Environmental Management Programme (EMPR). The audit was undertaken in accordance with Regulation 34 and Appendix 7 of the National Environmental Management Act (Act 107 of 1998) (NEMA) Environmental Impact Assessment (EIA) Regulations, 2014 (as amended). The Retained Operations Consolidated EMPr includes the following operations: Waterval smelter; Acid Converting Process (ACP) facilities; Rustenburg Base Metal Refinery (RBMR); and Precious Metal Refinery (PMR). It is SRK’s understanding that the Frank Concentrator has been formally decommissioned under an Environmental Authorisation and that rehabilitation of this facility will take place in the near future in accordance with the environmental commitments contained in the authorisation document and EMP for this facility (not included within the ambit of this audit). With regards to the Western Limb Distribution Center (WLDC), it is assumed that the conditions contained within the Consolidated EMPR (included in Appendix C1) are applicable to this facility as no EMPR amendment/addendum since 2002 was issued directly to this facility. Audit results During the audit, the RPM personnel demonstrated a good understanding of the environmental management issues on site and the requirements of the Consolidated EMPR. Compliance achieved by the RPM operations largely related to the following: The combined efforts of and experienced and knowledgeable environmental team comprising of an environmental manager, two environmental coordinators and two environmental officers (who are each responsible for their particular operations) to ensuring compliance to the various environmental permits held by the retained operations Ongoing monitoring relating to surface water, groundwater and air quality parameters Ongoing engagement with relevant stakeholders Having an effective system to record and action incidents as they arise (Enablon) to ensure these are addressed as per an action plan which is generated per incident The audit results indicated that the non-compliances related to the following: Conditions within the EMPr which are either not practical, not relevant or not achievable which would need to be amended through an EMPr amendment process. It is the Auditor’s understanding that the EMPr amendment is planned for 2020/2021 Extension of various monitoring systems to encompass the effects of the Retained Operations on off-site receptors Several ongoing challenges around overflow of dams and resulting potential pollution to soils and water resources. Most of the non-compliances noted included conditions which are no longer applicable or practical for the RPM operations to implement. It is SRK’s understanding that the Consolidated EMPr will be amended in the near future (2020/2021) to either amend or remove these conditions. SRK has MARA/NKAV/LAKF 558834_RPM_EMPR_Final Reg 34 Audit Report_20201130 November 2020 SRK Consulting: 558834: Rustenburg Process Operations: External Environmental Audit, undertaken during August 2020 Page iii attempted to summarise the conditions requiring amendment in a separate memo which will be issued to the RPM Retained operations. In summary, the audit results indicated the following: The retained operations are largely compliant with the conditions contained within the EMPr. A higher level of compliance is attainable subject to the amendment of the EMPr; and Ongoing efforts by the environmental team will ensure that partial non-compliances are rated as compliant in the next audit. MARA/NKAV/LAKF 558834_RPM_EMPR_Final Reg 34 Audit Report_20201130 November 2020 SRK Consulting: 558834: Rustenburg Process Operations: External Environmental Audit, undertaken during August 2020 Page iv Table of Contents Executive Summary ..................................................................................................................................... ii Disclaimer .................................................................................................................................................... vi List of Abbreviations ................................................................................................................................... vii 1 Introduction .................................................................................................................. 1 2 Rustenburg Operations Overview............................................................................... 2 2.1 Property description ............................................................................................................................ 2 2.2 Physical project description ................................................................................................................ 2 2.2.1 Waterval Smelter and Anglo Converter Plant ......................................................................... 8 2.2.2 Rustenburg Base Metal Refineries (RBMR) ........................................................................... 8 2.2.3 Precious Metal Refiners (PMR) ............................................................................................... 9 3 Legislative Requirements .......................................................................................... 13 4 Audit Objectives ......................................................................................................... 14 5 Environmental audit work programme ..................................................................... 14 5.1 Project team ...................................................................................................................................... 14 5.2 Environmental audit methodology ..................................................................................................... 14 5.3 Statement of SRK Independence ..................................................................................................... 15 5.4 Assumptions, uncertainties or knowledge gaps ................................................................................ 16 5.5 Other information requested by the competent authority ................................................................. 16 6 Environmental Audit Results .................................................................................... 16 6.1 Overall level of compliance of the Retained Operations ................................................................... 16 6.2 Recommendation for Amendment .................................................................................................... 17 7 Conclusion .................................................................................................................. 18 8 Declarations ................................................................................................................ 20 8.1 Independent auditor declaration ....................................................................................................... 20 Appendices ...................................................................................................................... 21 Appendix A: Independent Environmental Auditors CVs ............................................ 22 Appendix B: Pre-site audit meeting presentation with notes from the meeting ........ 23 Appendix C: Audit checklists ......................................................................................... 24 Appendix C1: General EMPr Conditions ........................................................................ 25 Appendix C2: RBMR Conditions .................................................................................... 75 Appendix C3: Waterval Complex (Smelter and ACP) ................................................... 90 Appendix C4: PMR ......................................................................................................... 115 Appendix D: List of documents ................................................................................... 125 MARA/NKAV/LAKF 558834_RPM_EMPR_Final Reg 34 Audit Report_20201130 November 2020 SRK Consulting: 558834: Rustenburg Process Operations: External Environmental Audit, undertaken during August 2020 Page v List of Tables Table 1-1: Retained Operations ........................................................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages185 Page
-
File Size-