HR16D00002-"WSS PILELINE for Daire, Gali Dakhlyatsoha" 2,000,000 2,000,000 2,000,000 1,999,960 HARIPUR HR16D00003-WSS Mobeen Banda

HR16D00002-"WSS PILELINE for Daire, Gali Dakhlyatsoha" 2,000,000 2,000,000 2,000,000 1,999,960 HARIPUR HR16D00003-WSS Mobeen Banda

District. Project Description BE 2016-17 Final Budget Releases Expenditure HARIPUR HR16D00002-"WSS PILELINE FOR Daire, gali dakhlyatsoha" 2,000,000 2,000,000 2,000,000 1,999,960 HARIPUR HR16D00003-WSS Mobeen Banda. 1,500,000 1,500,000 1,500,000 1,500,000 HARIPUR HR16D00007-Boring of H/pump/ pressure pumps (10 No)in different villages in 1,205,133 1,205,133 1,205,133 1,201,256 Barkot. HARIPUR HR16D00008-provision of 02 No water bores UC BS KhaSher Khan. 450,000 450,000 450,000 - HARIPUR HR16D00010-"WSS Moh: M.Akram, Jabi Ghumawan." 400,000 400,000 400,000 400,000 HARIPUR HR16D00011-WSS Moh: Dhooman village Ghandian. 400,000 400,000 400,000 298,397 HARIPUR HR16D00012-Pavement of path at village Dheenda. 1,000,000 1,000,000 973,921 123,175 HARIPUR HR16D00015-Sanitation work near h/o Haji Taj andh/o M.Aslam village Chamba 550,000 550,000 550,000 548,260 Pind. HARIPUR HR16D00016-"Boring of 03 No. H/pumps in villageChamba Pind Motian, Dhedan, 450,000 450,000 450,000 450,000 Jhar etc." HARIPUR HR16D00017-"Sewerage system at Moh: Islam Nagar,Moh: Eidgah and Moh: Peeran 144,454 144,454 144,454 144,454 Wala." HARIPUR HR16D00018-Boring of H/pumps and extension ofpipelines at DW Khanpur. 602,180 602,180 602,180 587,306 HARIPUR HR16D00019-Pavement of streets/ path/ culverts/protection bund etc in different 2,800,000 2,800,000 2,511,778 2,511,778 Moh: of Kot Najibulah. HARIPUR HR16D00020-Improvement/ extension of WSS in DW KotNajibulah. 500,000 500,000 500,000 - HARIPUR HR16D00021-Provision of 02 No. bores andImprovement/ extension of existing 23,396 23,396 23,396 21,425 DWSS at DW Pandak. HARIPUR HR16D00022-Construction of path and pavement ofstreet at village Ganaya. 1,600,000 1,600,000 1,600,000 1,598,927 HARIPUR HR16D00023-Boring of H/pump/ pressure pump & ext:of pipeline in different village 800,000 800,000 599,068 599,068 in DW Panian HARIPUR HR16D00026-Boring of 02 No. H/pump in villageTarar. 191,233 191,233 191,233 190,867 HARIPUR HR16D00027-Provision of 09 Nos. Water Bores at DWSarai Niamat Khan 1,350,000 1,350,000 1,350,000 1,349,708 HARIPUR HR16D00028-Provision of 01 Nos. Water Tank atMohallah Plassi Maira Sarai Niamat 100,000 100,000 100,000 100,000 Khan. HARIPUR HR16D00029-Pavement of Streets/ Roads at DW SaraiNiamat Khan 306,622 306,622 306,622 301,807 HARIPUR HR16D00031-Extension of Pipeline for Village BandiGullu 200,000 200,000 200,000 198,402 HARIPUR HR16D00032-WSS Sirya 300,000 300,000 300,000 299,999 HARIPUR HR16D00033-Const: of Sewerage line from MasjidTarbela Sector No. 2 to H/O 154,278 154,278 154,278 141,692 Nusrat Hayat Khan Sector No. 2 HARIPUR HR16D00034-Extension of pipeline of WSS in DWBareela. 800,000 800,000 776,000 776,000 HARIPUR HR16D00035-Boring of 10 No. H/pumps/ pressure pumpsin DW Hattar. 701,499 701,499 701,499 700,919 HARIPUR HR16D00036-Boring of 05 No. hand-pumps/ pressurepumps in DW Kholian Bala 400,003 400,003 400,003 390,002 HARIPUR HR16D00037-Boring of 05 No. H/pumps/ Pressure pumps& Ext: of pipelines of WSS 700,064 700,064 675,284 675,284 in DW Mankarai. HARIPUR HR16D00038-Boring of 09 No. hand-pumps/ pressurepumps & Ext: of pipelines etc 1,700,000 1,700,000 723,089 723,089 in different villages/ Mohallahs in DWMuslimabad HARIPUR HR16D00039-Boring of 05 No. hand-pumps/ pressurepumps in different villages / 1,000,000 1,000,000 1,000,000 996,930 Moh: in DW Najafpur HARIPUR HR16D00040-Construction of Tube well for DWSSVillage Nartoppa (remaining work). 450,000 450,000 450,000 - HARIPUR HR16D00041-WSS Village Kundi. 500,000 500,000 440,551 440,551 HARIPUR HR16D00042-Const: of Path Village Kundi & OmerKhana. 1,000,000 1,000,000 1,000,000 990,896 HARIPUR HR16D00043-Construction of Path Village SalamKhand. 800,000 800,000 800,000 787,796 HARIPUR HR16D00044-Construction of Path Village Dul Mohat. 700,000 700,000 611,210 611,210 HARIPUR HR16D00045-Const:/Widening of Road Near Pakhral Chowk Sector No.2 1,000,000 1,000,000 1,000,000 995,025 HARIPUR HR16D00046-Construction of Drain/Widening of Path/Streets Sec No. 1 KTS. 293,600 293,600 293,600 293,240 HARIPUR HR16D00047-Const: of path at different villages/Mohallahs in DW Bakka. 600,000 600,000 600,000 600,000 HARIPUR HR16D00048-Rehabilitation of bridge at VillageKokliyan 300,000 300,000 300,000 298,278 HARIPUR HR16D00049-Construction of Path Village Sari nearHigh School 500,000 500,000 500,000 500,000 HARIPUR HR16D00050-Construction of Path Village Pindori 150,000 150,000 150,000 143,000 HARIPUR HR16D00051-Construction of Path Village Bakkah Jabinear H/O Riaz Javed 150,000 150,000 150,000 137,070 HARIPUR HR16D00052-Construction of Path Village Gherian 150,000 150,000 150,000 148,572 HARIPUR HR16D00056-Construction of Path Village Gudwaliannear H/O Fazal-e-Subhan 163,399 163,399 163,399 162,523 HARIPUR HR16D00058-Const: of Path from Soka to H/O HajiKhursheed Village Bareela 9,259 9,259 9,259 9,259 HARIPUR HR16D00059-Const: of Path from Soka to H/O HajiWazeer Village Padni 550,000 550,000 550,000 550,000 HARIPUR HR16D00060-Const: of Path from Soka to Moh: Baseera 200,000 200,000 200,000 200,000 HARIPUR HR16D00061-"Construction of Janazagah, Qutba" 329,910 329,910 329,910 329,909 HARIPUR HR16D00062-"PCC of path Mohallah Uper Arif Khan,Village Bhutri" 500,000 500,000 500,000 495,536 HARIPUR HR16D00064-"PCC of path Mohallah Musa, VillageGhandian" 148,600 148,600 148,600 148,600 HARIPUR HR16D00065-Construction of Path Village Phula Gali 48,600 48,600 9,300 9,300 HARIPUR HR16D00066-PCC of path Village Dara Bajwala 97,070 97,070 97,070 97,070 HARIPUR HR16D00067-PCC of path Moh: Yaqoob Khan VillageBajwala 300,000 300,000 300,000 300,000 HARIPUR HR16D00068-Construction of Path near H/O HashimKhan Jhamra (Chamda Pind) 600,000 600,000 600,000 600,000 HARIPUR HR16D00069-Construction of Path near H/O HajiJameel Village Ladha 175,000 175,000 175,000 175,000 HARIPUR HR16D00072-Construction of PCC Path Village ChambaPind near H/O Haji Khan Afsar 350,000 350,000 350,000 330,584 HARIPUR HR16D00074-PCC of path/ Pavement of street in DWHattar. 666,604 666,604 363,108 363,108 HARIPUR HR16D00075-Const: of PCC of path/ Streets indifferent mohallahs / villages of DW 2,000,000 2,000,000 2,000,000 1,983,963 Khanpur. PCC Main street to HozRani Wah. HARIPUR HR16D00076-Construction of paths/ streets indifferent village / mohallahs in DW 197,107 197,107 197,107 - Muslimabad HARIPUR HR16D00077-PCC of path/ Streets in differentvillages/ mohallahs in DW Najifpur And 414,339 414,339 414,339 404,919 pavement of street Darra DartianDW Najafpur. HARIPUR HR16D00078-Construction of Bridge/ Culvert atVillage Todu Road Panian 1,600,000 1,600,000 1,600,000 1,599,384 HARIPUR HR16D00079-Const: of Shingle Road near H/O HajiDost Muhammad Village Sarai 100,000 100,000 100,000 100,000 Niamat Khan HARIPUR HR16D00080-Const: of path Moh: Syedan to Moh: LalShah Village Bandi Mian Pir 250,000 250,000 250,000 250,000 Dad. HARIPUR HR16D00081-Const: of Kacha path and Dozer WorkVillage Kandal. 200,000 200,000 200,000 199,745 HARIPUR HR16D00082-Construction of Path Village Mang nearH/O Waheed Ayub 18,701 18,701 18,701 6,323 HARIPUR HR16D00083-PCC of path near H/O Dr. Zaman to H/ORaja Muhammad Younas 39,593 39,593 39,593 39,592 HARIPUR HR16D00084-Const: of R/Wall along Road near H/O Ch.Sajjad 35,808 35,808 35,808 35,808 HARIPUR HR16D00085-Const: of Path Village Mang near H/O Ch.Kashif 45,028 45,028 45,028 33,484 HARIPUR HR16D00086-Const: of Path Village Tarar Bala 200,000 200,000 200,000 200,000 HARIPUR HR16D00088-Const: of Path from Soka to Main PathVillage Rajpur 127,771 127,771 127,771 127,472 HARIPUR HR16D00090-Const: of Path from Islampur Khidhu Sokato H/O Akbar Dad 74,315 74,315 74,315 73,916 HARIPUR HR16D00091-Const: of Path from Islampur Khidhu Sokato H/O Saeed 44,613 44,613 44,613 44,612 HARIPUR HR16D00092-Leveling and dressing of Play Ground atVillage Ghari Serian 500,000 500,000 500,000 - HARIPUR HR16D00093-Leveling and dressing of Play Ground atVillage Guhmawan 500,000 500,000 - - HARIPUR HR16D00094-Const: of swimming pond/ Improvement ofspring at village Chamba 331,560 331,560 331,560 331,560 Pind for promotion of Youth activities. HARIPUR HR16D00095-"Construction of drains and filling ofBenazir Cricket Ground, Kangra. " 669,362 669,362 669,362 666,643 HARIPUR HR16D00096-"Additional Work in Community Centre at 1,000,000 1,000,000 940,000 940,000 village Gharri Maira" HARIPUR HR16D00097-Const: of R/wall at Nikki Kund. 68,842 68,842 68,842 68,842 HARIPUR HR16D00098-Construction of R/wall near Chungi No11. 400,000 400,000 400,000 393,183 HARIPUR HR16D00099-"Rehabilitation of sewerage system ofdifferent 630,000 630,000 - - wards of Women & Children Hospital Haripur." HARIPUR HR16D00100-Improvement/ rehabilitation of drainswith provision of slabs in DW 412,600 412,600 412,600 403,485 Khalabat Moh: Phultahar Sector# 4 and Moh:Khabal.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us