The Bronx Fourth Quarter - 2017 Reconstruction of E. 168th St. Step Street and Retaining Wall Between Clay and Teller Avenues Project # RWX018 The New York City Department of Design and designated areas for your trash collection, please Construction (NYCDDC) continues to manage a contact the CCL Lisa Lee. reconstruction project at E.168th Street between Clay and Teller Avenues in the Bronx. This -Parking/Traffic Restrictions: To perform certain project includes the total reconstruction of the work operations and allow construction work to Step Street and Retaining Wall. Additional lighting continue, parking and traffic detours restrictions and landscaping will be installed. The portico will be necessary. Advance notification will be located on E. 168th Street and Teller Avenue will given by the contractor regarding these be replaced. The anticipated completion date for restrictions/detours. “No Parking” signs will be this project is anticipated for the Spring of 2018. posted and distributed by the contractor in the . affected area. Please follow all posted signage during construction hours otherwise please follow Work Performed: Third Quarter 2017 all NYCDOT rules and regulations during non- •Concrete works for retaining walls construction hours to avoid possible towing of •Electrical conduit installation your vehicle. •Plumbing works •Granite works - Baiting: Is being done by the contractor, throughout the project area on a regular basis, in Anticipated Work Schedule: Fourth Quarter 2017 order to help control any rodent population. •Continue Concrete works for retaining walls Community Construction Liaison (CCL): •Continue Electrical conduit installation The DDC has assigned Lisa Lee of Haider •Continue Plumbing works Engineering PC as the Community Construction •Continue Granite works Liaison (CCL) for this project. Please contact Lisa Lee for any project related inquires and/or to •Begin Concrete works for Plaza be added to the electronic Neighborhood Notification Network (NNN) list. Work Hours: Phone: 212-392-5355 Fax: 917-801-2144 Monday-Friday 7:00AM-3:30PM Email: [email protected] However, the allowable work hours are Field Office: 400 E. 167th Street, 2nd Floor, Bronx Monday- Friday 7:00 AM to 6:00 PM. 10456 Community Impacts: Newsletter Distribution: -Special Needs: Individuals with special needs The Quarterly Newsletter for this project is who may be uniquely impacted by this project distributed by the CCL electronically through the should contact the project’s Community Neighborhood Notification Network (NNN) list, as Construction Liaison (CCL), as soon as possible, well as via hard copies throughout the project to make them aware of your situation. DDC will area, and can also be found at the following locations: work with you to minimize the inconvenience as much as possible. BX CB # 4 –1650 Selwyn Avenue, Suite 11A -Trash Collection: during a construction project Bronx, New York 10456 can be a challenge though, manageable with a minimum of disruption. Please dispose of your trash properly to avoid easy breakage or a spill over. Place it in the DSNY designated areas as close to collection time as possible. If you use a private carter, ensure your trash collection occurs on a timely fashion. If you are unaware of the Bill de Blasio DDC Website Mayor www.nyc.gov/ddc Ana Barrio DDC Video Acting Commissioner www.nyc.gov/webuild .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-