Summary report Submitted to Submitted by Transport for London AECOM 12 Regan Way Chilwell Nottingham NG9 6RZ United Kingdom Road safety standards for construction, supply and waste sites AECOM Page i Prepared by: Matthew Wainwright and Joanne Edwards Checked by: Johan Els Approved by: Paul Edwards 12 Regan Way, Chilwell, Nottingham, NG9 6RZ, United Kingdom Telephone: 0115 907 7000 Website: http://www.aecom.com Road safety standards for construction, supply and waste sites December 2016 AECOM Page ii Limitations AECOM Infrastructure & Environment UK Limited (“AECOM”) has prepared this Report for the sole use of Transport for London in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by AECOM. This Report is confidential and may not be disclosed by the Client nor relied upon by any other party without the prior and express written agreement of AECOM. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by AECOM has not been independently verified by AECOM, unless otherwise stated in the Report. The methodology adopted and the sources of information used by AECOM in providing its services are outlined in this Report. The work described in this Report was undertaken between December 2015 and August 2016 and is based on the conditions encountered and the information available during the said period of time. The scope of this Report and the services are accordingly factually limited by these circumstances. Where assessments of works or costs identified in this Report are made, such assessments are based upon the information available at the time and where appropriate are subject to further investigations or information which may become available. AECOM disclaim any undertaking or obligation to advise any person of any change in any matter affecting the Report, which may come or be brought to AECOM’s attention after the date of the Report. Certain statements made in the Report that are not historical facts may constitute estimates, projections or other forward-looking statements and even though they are based on reasonable assumptions as of the date of the Report, such forward-looking statements by their nature involve risks and uncertainties that could cause actual results to differ materially from the results predicted. AECOM specifically does not guarantee or warrant any estimate or projections contained in this Report. Where field investigations are carried out, these have been restricted to a level of detail required to meet the stated objectives of the services. The results of any measurements taken may vary spatially or with time and further confirmatory measurements should be made after any significant delay in issuing this Report. Copyright © This Report is the copyright of AECOM Infrastructure & Environment UK Limited. Any unauthorised reproduction or usage by any person other than the addressee is strictly prohibited. Road safety standards for construction, supply and waste sites December 2016 AECOM Page iii Contents Executive Summary ......................................................................................................................... 1 1 Introduction ............................................................................................................................... 2 1.1 Research Rational ................................................................................................................ 2 1.2 Research Methodology ........................................................................................................ 3 2 Tipper Truck Variants ............................................................................................................... 4 2.1 Standard (N3) ...................................................................................................................... 4 2.2 Low Entry Cab (LEC) ........................................................................................................... 4 2.3 Off- road capable (N3G) ....................................................................................................... 4 2.4 Vehicle Design Data ............................................................................................................. 5 3 Ground Conditions ................................................................................................................... 7 3.1 Paved ................................................................................................................................... 8 3.2 Unpaved .............................................................................................................................. 9 3.3 Materials ............................................................................................................................ 10 3.4 Rutting ............................................................................................................................... 11 3.5 Approach Angles ................................................................................................................ 12 3.6 Loose Material & Debris ..................................................................................................... 13 3.7 Water ................................................................................................................................. 14 4 CLOCS Site Assessment Handbook ...................................................................................... 15 4.1 CLOCS 5............................................................................................................................ 16 4.2 CLOCS 4............................................................................................................................ 16 4.3 CLOCS 3............................................................................................................................ 16 4.4 CLOCS 2............................................................................................................................ 16 4.5 CLOCS 1............................................................................................................................ 17 5 Construction, Supply and Waste Site Mapping and Assessment ....................................... 18 5.1 Construction Sites .............................................................................................................. 19 5.2 Waste Sites ........................................................................................................................ 20 5.3 Cement Works ................................................................................................................... 23 5.4 Concrete Batching Plants ................................................................................................... 24 5.5 Asphalt Plants .................................................................................................................... 25 5.6 Aggregate Served Railheads.............................................................................................. 26 5.7 Aggregate Served Wharfs .................................................................................................. 27 6 Global Best Practice ............................................................................................................... 28 6.1 Scandinavia ....................................................................................................................... 28 6.2 Ground Improvement ......................................................................................................... 29 7 Stakeholder Consultation ....................................................................................................... 32 8 Conclusions ............................................................................................................................ 33 9 Recommendations .................................................................................................................. 34 Acknowledgements ....................................................................................................................... 35 List of Appendices Appendix A. Site Visit Case Studies Appendix B. Supply and Waste Sites in London Boroughs Appendix C. All Mapped and Assessed Waste Sites Appendix D. PowerBI for Waste and Supply Site Directory Appendix E. CLOCS App Concepts Road safety standards for construction, supply and waste sites December 2016 AECOM Page iv List of Tables Table 2-1 LEC, N3 and N3G vehicle variant capabilities ................................................................... 5 Table 4-1 Assessment criteria ......................................................................................................... 15 Table 4-2 Site assessment ratings .................................................................................................. 16 Table 5-1 Cement work operators and locations in the South East, East and East Midlands .......... 23 Table 5-2 Concrete batching plant operators and locations in Greater London ............................... 24 Table 5-3 Asphalt plant operators and locations in Greater London ...............................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages73 Page
-
File Size-