Request for Bids (RFB) For CONSTRUCTION OF PRESIDENT GEORGE BUSH TURNPIKE WIDENING FROM NORTH OF BELT LINE ROAD TO IH-35E Solicitation Number: 04402-PGB-00-CN-PD Date Issued March 22, 2019 Date Revised Pre-Bid Conference April 5, 2019 at 3:00 p.m. CT 5900 West Plano Parkway Plano, Texas 75093 NTTA Board Room Bid Question Deadline April 12, 2019 at 5:00 p.m. CT Submit Questions via www.nttamarketplace.org Bid Due Date April 18, 2019 at 3:00 p.m. CT Solicitation Contact Person Reginald Valentine, Senior Buyer [email protected] Contract Term 27 months Project Description: Construction of 4th lane inside widening on the President George Bush Turnpike, including grading, drainage, concrete pavement, ITS, pavement markings, signing, and safety enhancements. NIGP Code(s) 23 D/M/WBE Goal % 913-27 913-45 913-56 801-87 750-30 968-77 2014 Specifications DOC_001A_Rev_0 Revised: August 2018 This Proposal for Construction has been formatted for double- sided printing with insertion of blank pages PROPOSAL FOR CONSTRUCTION OF CONSTRUCTION OF 4TH LANE INSIDE WIDENING INCLUDING GRADING, DRAINAGE, CONCRETE PAVEMENT, ITS, PAVEMENT MARKINGS, SIGNING, AND SAFETY ENHANCEMENTS FROM: North of Belt Line Road TO: IH-35E SEGMENT: IV and V CONTRACT: 04402-PGB-00-CN-PD FOR THE PRESIDENT GEORGE BUSH TURNPIKE NORTH TEXAS TOLLWAY AUTHORITY This Proposal for Construction has been formatted for double- sided printing with insertion of blank pages Contract No.: 04402-PGB-00-CN-PD TABLE OF CONTENTS Document Document Page to Be to Be Submitted Submitted at Bid after Opening Award 1. Contractor Information Sheet 1 2. Prequalification Requirements 3 3. Proposal 5 4. Bid Bond 11 5. Total Bid Amount 13 6. Certification of Interest in Other Bid Proposals 15 for This Work 7. Affidavit - Conflict of Interest 17 8. Affidavit - Anti-Collusion 21 9. Certification of Debarment 23 10. Disadvantaged, Minority, Women-Owned, and 25 Small Business Enterprises Program 11. Commitment Agreement Forms For All 29 Subcontractors (Form 4906) 12. Subcontractor Final Report (Form 4908) 31 13. Escrow of Bid Documents 33 14. Example of Bid Prices Submitted By 37 Computer Printout 15. Unit Description and Bid Price Schedule 39 16. Engineer’s Seal 79 17. Index of Governing Specifications, Special 81 Provisions, and Special Specifications 18. SP-000.01.0, Certificate of Interested Parties 85 (Form 1295) 19. SP-000.02.2, R.O.W. & Utility Relocations by 87 Others 20. SP-000.03.5, Mandatory Construction 91 Schedule 21. SP-000.04.1, Sales and Use Tax Exemption 93 22. SP-000.05.1, Existing Utilities 95 Revised: May 2017 DOC001C_Rev_3 1 of 4 TABLE OF CONTENTS 04402-PGB-00-CN-PD (Continue) Document Document Page to Be to Be Submitted Submitted at Bid after Opening Award 23. SP-000.08.1, Special Labor Provisions for 97 State Construction Projects 24. SP-000.17.1, Value Engineering Proposals 103 25. SP-000.19.2, NTTA Enterprise Project 105 Delivery System 26. SP-000.20.5, NTTA Business Diversity Prism 109 Contract Compliance Tracking Software 27. SP-001.07, Abbreviations and Definitions 111 28. SP-002.07, Instructions to Bidders 115 29. SP-003.07, Award and Execution of Contract 119 30. SP-003.INS.0, Award and Execution of 125 Contract 31. SP-004.03, Scope of Work 131 32. SP-005.03, Control of the Work 133 33. SP-006.04, Control of Materials 137 34. SP-007.17, Legal Relations and 141 Responsibilities 35. SP-008.13, Prosecution and Progress 151 36. SP-009.05, Measurement and Payment 167 37. SP-100.01, Preparing Right of Way 171 38. SP-132-002, Embankment 173 39. SP-161.02, Compost 175 40. SP-162.00, Sodding for Erosion Control 177 41. SP-300-015, Asphalts, Oils, and Emulsions 179 42. SP-341-001, Dense-Graded Hot-Mix Asphalt 183 43. SP-416.02, Drilled Shaft Foundations 185 44. SP-421-002, Hydraulic Cement Concrete 187 45. SP-427.01, Surface Finishes for Concrete 191 46. SP-506.00, Temporary Erosion, 193 Sedimentation, and Environmental Controls Revised: May 2017 DOC001_Rev_3 2 of 4 TABLE OF CONTENTS 04402-PGB-00-CN-PD (Continue) Document Document Page to Be to Be Submitted Submitted at Bid after Opening Award 47. SP-636.00, Signs 195 48. SP-636-001, Signs 197 49. SP-643-001, Sign Identification Decal 199 50. SP-647.00, Large Roadside Sign Supports 201 and Assemblies 51. SP-658.02, Delineator and Object Marker 203 Assemblies 52. SP-662.01, Work Zone Pavement Markings 205 53. SP-666-007, Retroreflectorized Pavement 207 Markings 54. SP-666.01, Retroreflectorized Pavement 209 Markings 55. SP-668.01, Prefabricated Pavement Markings 211 56. SP-672.01, Raised Pavement Markings 213 57. SP-677.01, Eliminating Existing Pavement 215 Markings and Markers 58. SP-678.01, Pavement Surface Preparation 217 Markings 59. SS-832.01, Coating Surface Finishes for New 219 Concrete 60. SS-850.03, Gray Concrete Color and Finish 223 61. SP-856.02, Moisture Treated Subgrade (MTS) 231 62. SS-857.02, Stabilized Subgrade 235 63. SS-860.01, Multi-Duct Conduit System 243 64. SS-865.01, CCTV Camera Pole Structure 249 65. SS-3004, Diamond Grinding and Grooving 251 Pavement 66. SP-3004.01, Diamond Grinding and Grooving 253 Pavement 67. SS-6001, Portable Changeable Message Sign 255 68. SS-6007, Intelligent Transportation System 257 (ITS) Fiber Optic Cable Revised: May 2017 DOC001_Rev_3 3 of 4 TABLE OF CONTENTS 04402-PGB-00-CN-PD (Continue) Document Document Page to Be to Be Submitted Submitted at Bid after Opening Award 69. SS-6019, Longitudinal Prefabricated 271 Pavement Markings (PPM) with Warranty 70. SS-6291, Mobile Retroreflectivity Data 277 Collection for Pavement Markings 71. SS-6088, Camera Pole Structure 281 72. SS-6148, Inverted Profile Pavement Marking 283 (Audible) 73. SS-6186, Intelligent Transportation System 289 (ITS) Ground Box 74. Payment Bond 295 75. Performance Bond 297 76. Warranty Bond 299 77. Contract 301 78. Certificate of Liability Insurance [to be inserted at contract execution] Revised: May 2017 DOC001_Rev_3 4 of 4 NORTH TEXAS TOLLWAY AUTHORITY CONTRACTOR INFORMATION SHEET Contract No.: 04402-PGB-00-CN-PD Highway: President George Bush Turnpike Segment: IV & V Project: Construction of 4TH Lane Inside Widening including Grading, Drainage, Concrete Pavement, ITS, Pavement Markings, Signing, and Safety Enhancements. Please Print or Type Bidder Name: Delivery Address: City/State/Zip: Mailing Address: City/State/Zip: Contact for this bid (Required for post-bid notifications, award notice, contracts, etc.) Name: Phone Number: E-mail Address: 2014 Specifications DOC_002A 1 of 2 Revised: Apr. 2017 1 This page intentionally left blank 2014 Specifications DOC_002A 2 of 2 Revised: Apr. 2017 2 March, 2019 NORTH TEXAS TOLLWAY AUTHORITY NOTICE TO THE BIDDERS "PREQUALIFICATION REQUIREMENTS" Contract No.: 04402-PGB-00-CN-PD Highway: President George Bush Turnpike, Segments: IV & V County: Dallas The checked box below indicates the type of qualification requirements for this project: FULL PREQUALIFICATION NTTA APPLICATION FOR QUALIFICATION (AFQ) BIDDER’S QUESTIONNAIRE NO PREQUALIFICATION REQUIREMENTS Qualification statements must be on file with TxDOT at least ten (10) days prior to the date of the bid opening. NTTA AFQs are due on or before the bid opening at NTTA’s general administrative offices. FULL PREQUALIFICATION Bidder must be a Prequalified Contractor under “Confidential Questionnaire” with the Texas Department of Transportation. NTTA APPLICATION FOR QUALIFICATION (AFQ) Bidder must complete a NTTA AFQ and submit per the requirements of NTTA Special Provision 000.25.1, “Qualification Requirements.” BIDDER’S QUESTIONNAIRE Bidder must be a Prequalified Contractor under “Bidder’s Questionnaire” with the Texas Department of Transportation. Any Bidder meeting the requirements of “Full Prequalification” automatically meets this requirement. NO PREQUALIFICATION REQUIREMENTS There are no prequalification requirements. 2014 Specifications1 of 1 Revised: Feb. 2019 DOC002B.3 3 This page intentionally left blank 4 Contract No.: 04402-PGB-00-CN-PD County: Dallas March, 2019 PROPOSAL TO THE NORTH TEXAS TOLLWAY AUTHORITY FOR THE CONSTRUCTION OF 4TH LANE INSIDE WIDENING INCLUDING GRADING, DRAINAGE, CONCRETE PAVEMENT, ITS, PAVEMENT MARKINGS, SIGNING, AND SAFETY ENHANCEMENTS FOR THE PRESIDENT GEORGE BUSH TURNPIKE A TURNPIKE PROJECT OF THE NORTH TEXAS TOLLWAY AUTHORITY SYSTEM From: North of Belt Line Road To: IH-35E Segments: IV and V The terms “bidder”, “Contractor”, “NTTA”, “Proposal”, “Contract”, “Payment Bond”, “Performance Bond”, “Warranty Bond”, “Work”, “Project”, “Substantial Completion”, “Final Completion”, “Special Provisions”, “Special Specifications”, “General Notes and Specification Data”, “Standard Specifications”, “Standard Specifications”, “Letting Official”, and other terms used herein or elsewhere in the Contract Documents that are defined in Item 1 of the Standard Specifications, as amended by Special Provision to Item 1, “Definition of Terms”; which is set forth below in this Contract, shall have the meanings indicated in said Item 1, as amended by said Special Provision to Item 1. The undersigned, as bidder, certifies that the only person or parties having an interest in this proposal as principals are those named herein; that this Proposal is made without collusion with any other person, firm or corporation; that none of the persons or parties having an interest in this proposal has any connection, official or otherwise, with NTTA, its agents, directors, employees, consultants or fiduciaries; that in submitting this proposal it is not acting as agent for 2014 Specifications 1 of 6 Revised: 02-17 DOC_003.5 5
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages316 Page
-
File Size-