Elysian Wind Farm

Elysian Wind Farm

Preliminary Environmental Assessment Elysian Wind Farm Reference No. 30012635 Prepared for Elysian WF Pty Ltd 31 March 2020 REFERENCE NO. 30012635 Table of Contents EXECUTIVE SUMMARY ..................................................................................................................................................... I ABBREVIATIONS AND CONVENTIONS ............................................................................................................................VI 1 INTRODUCTION ................................................................................................................................................... 1 1.1 Purpose of this document ......................................................................................................................... 1 1.2 Proponent details ..................................................................................................................................... 1 2 PROPOSAL IDENTIFICATION ................................................................................................................................. 2 2.1 Location .................................................................................................................................................... 2 2.2 Development overview ............................................................................................................................. 2 2.3 Major wind farm infrastructure components ............................................................................................ 8 2.4 Major electrical infrastructure ................................................................................................................ 11 2.5 Development phases .............................................................................................................................. 12 3 DEVELOPMENT JUSTIFICATION AND ALTERNATIVES CONSIDERED ..................................................................... 14 3.1 Global and regional agreements on emissions reduction ........................................................................ 14 3.2 Energy reform in Australia ...................................................................................................................... 14 3.3 Site selection .......................................................................................................................................... 15 3.4 Preliminary turbine layout ...................................................................................................................... 17 3.5 Alternatives considered .......................................................................................................................... 17 4 CONSULTATION ................................................................................................................................................. 19 4.1 Consultation ........................................................................................................................................... 19 4.2 Consultation activities undertaken to date ............................................................................................. 20 4.3 Stakeholder issues and interests ............................................................................................................. 21 4.4 Consultation summary ............................................................................................................................ 22 4.5 Next steps............................................................................................................................................... 23 5 PLANNING INSTRUMENTS AND CONTEXT .......................................................................................................... 25 5.1 Context for wind energy development ................................................................................................... 25 5.2 Commonwealth legislation ..................................................................................................................... 25 5.3 NSW state legislation .............................................................................................................................. 25 5.4 Environmental Planning Instruments ...................................................................................................... 28 5.5 Other policies and plans ......................................................................................................................... 30 5.6 Approvals required prior to commencement .......................................................................................... 31 6 ASSESSMENT OF KEY ISSUES .............................................................................................................................. 32 6.1 Landscape and visual assessment ........................................................................................................... 32 6.2 Noise and vibration................................................................................................................................. 54 6.3 Biodiversity ............................................................................................................................................. 62 6.4 Traffic and transport ............................................................................................................................... 73 6.5 Hazards and Risks ................................................................................................................................... 79 6.6 Aboriginal Heritage ................................................................................................................................. 87 6.7 Water and soils ....................................................................................................................................... 95 6.8 Waste ................................................................................................................................................... 102 6.9 Cumulative impacts .............................................................................................................................. 103 7 PRELIMINARY ENVIRONMENTAL RISK IDENTIFICATION.................................................................................... 105 8 CONCLUSION ................................................................................................................................................... 109 REFERENCES ............................................................................................................................................................. 110 PRELIMINARY ENVIRONMENTAL ASSESSMENT 31 March 2020 Elysian Wind Farm i Prepared for Elysian WF Pty Ltd Appendices APPENDIX A ELEVATION PROFILE TRANSECTS APPENDIX B COMMUNICATIONS LOG APPENDIX C COOMA-MONARO LEP RIPARIAN LAND APPENDIX D PRELIMINARY NOSIE LEVEL PREDICTIONS (RESONATE, 2019) APPENDIX E ABORIGINAL HERITAGE IMPACT ASSESSMENT REPORT List of Tables Table 1-1. Proponent details ..........................................................................................................................................1 Table 2-1. Summary of key project components ............................................................................................................7 Table 3-1. Site selection criteria – preferable site conditions .......................................................................................15 Table 3-2. Site selection criteria – constraints ..............................................................................................................16 Table 3-3. Preliminary site wind data ...........................................................................................................................17 Table 3-4. Benefit summary .........................................................................................................................................18 Table 4-1. Key issues raised during preliminary consultation .......................................................................................22 Table 6-1. Summary of dwellings and key viewpoints within the visual extent .............................................................48 Table 6-2. Preliminary wind farm noise predictions - dB(A) (source: Resonate, 2019) ..................................................57 Table 6-3. Acceptable vibration dose values (m/s 1.75) for intermittent vibration (DP&E, 2006) .................................59 Table 6-4. Transient vibration guide values for minimal risk of cosmetic damage (BS7385) .........................................60 Table 6-5. PCTs predicted to occur on site as listed on the BioNet Vegetation Classification (VIS 2.1) and Vegetation Types database.............................................................................................................................................................63 Table 6-6. Threatened flora species considered to have a moderate to high likelihood of occurring within the study area ..............................................................................................................................................................................67 Table 6-7. Threatened fauna species are considered to have a moderate to high likelihood of occurring within the study area ....................................................................................................................................................................68

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    180 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us