District Taluk Gram Panchayat Year Work Name Type of Building

District Taluk Gram Panchayat Year Work Name Type of Building

Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST 2] Construction of CC Road & Drain from Subalal Rajput House to Kallappa Katrabai House in Almel Bijapur Sindgi Almel 2006-07 CC Road and Drainage 20000 20000 0 Completed Village [@ Ward No-6] Bijapur Sindgi Almel 2006-07 3] Construction of CD near Khaji House in Almel Village [@ Ward No-2] Check dam 20000 20000 0 Completed 2] Construction of Drain from Subhas Hadapad house to Maragamma Temple in Almel Village [@ Bijapur Sindgi Almel 2006-07 Drainage 20000 20000 0 Completed Ward No-2] 3] Construction of CC Road from Kupendra Goundi House to Avappa Kambar House in Almel Bijapur Sindgi Almel 2006-07 CC Road 25000 25000 0 Completed Village [@ Ward No-6] Bijapur Sindgi Almel 2006-07 4] Construction of Drain from Nandi House to Chinivalar House in Alamel village @ Ward No-2 ] Drainage 25000 25000 0 Completed 1] Construction of CC Road from Pashupati Math House to Koralli House in Almel Village [@ Ward Bijapur Sindgi Almel 2006-07 CC Road 31000 31000 0 Completed No-5] Bijapur Sindgi Almel 2006-07 2] Construction of CC Road from Koralli House to Hatti House in Almel Village [@ Ward No-5] CC Road 31000 31000 0 Completed Bijapur Sindgi Almel 2006-07 3] Construction of CC Road behind Karnataka Bank in Almel Village [@ Ward No-5] CC Road 31000 31000 0 Completed Bijapur Sindgi Almel 2006-07 2] Construction of ladies Toilet Infront of Gundad House in Almel Village [@ Ward No-4] Construction of Toilet 31000 31000 0 Completed Bijapur Sindgi Almel 2006-07 3] Construction of ladies Toilet near Kadani Agasi in Almel Village [@ Ward No-4] Construction of Toilet 31000 31000 0 Completed 1] Construction of Drain from Veera Nagamma Temple to Kadani Agasi @ Ward No 4 in Almel Bijapur Sindgi Almel 2006-07 Drainage 31000 31000 0 Completed Village [@ Ward No-4] 1] Construction of CC Road & Drain from Kubechidra Goundi House to Shankar Ktra Bai House in Bijapur Sindgi Almel 2006-07 CC Road 46000 46000 0 Completed Almel Village [@ Ward No-6] Construction of CC Road & Drain @ Ward No-8 from Yadrami House to Buruda House in Almel Bijapur Sindgi Almel 2006-07 CC Road and Drainage 46000 46000 0 Completed Village Bijapur Sindgi Almel 2006-07 Construction of CC Road & Drain @ Ward No-7 from Main Road to House in Almel Village CC Road and Drainage 85000 85000 0 Completed Bijapur Sindgi Almel 2006-07 1] Construction of CD & Drain & Laying 2 Pipes in Almel Village [@ Ward No-2] Check dam 25000 25000 20000 Completed 1] Construction of Drain on Both Side from Ambabai Temple to Jogur House in Almel Village [@ Bijapur Sindgi Almel 2006-07 Drainage 86000 86000 40000 Completed Ward No-1] Construction of CC Road & Drain from Mulkasab Dange House to Girki Open Well @ Ward No 3 in Bijapur Sindgi Almel 2006-07 CC Road and Drainage 85000 85000 85000 Completed Almel Village [@ Ward No-3] Bijapur Sindgi Almel 2008-09 Construcation of Toliet Repair Repair Works 65000 65000 0 Completed Bijapur Sindgi Almel 2008-09 curent Cable and Ac In Gram Panchayath Building Construction of Gram Panchayat90000 Building 90000 0 Completed Bijapur Sindgi Almel 2008-09 Construction of gril and gate to gram panchayat Construction of Gram Panchayat125000 Building 125000 0 Completed Bijapur Sindgi Almel 2008-09 Construction of Marbl Stone BS Slabs flooring 180000 180000 0 Completed Bijapur Sindgi Almel 2008-09 Construction of Compound Gram Panchath Building Compound wall 190000 190000 0 Completed Bijapur Sindgi Almel 2008-09 Construction of Marbl Stone BS Slabs flooring 199000 199000 0 Completed Bijapur Sindgi Almel 2008-09 Construction of window and Finsing Gram Panchath Building Construction of Gram Panchayat199000 Building 199000 0 Completed Bijapur Sindgi Almel 2008-09 Construction of Drinage from Loni House to Dhanshree House Drainage 120000 120000 120000 Completed Bijapur Sindgi Almel 2009-10 Construction of gummaja right side other works 199000 0 0 Progress Bijapur Sindgi Almel 2009-10 Construction of gummaja left side other works 199000 0 0 Progress Bijapur Sindgi Almel 2009-10 administrative charges other works 12000 12000 0 Completed Bijapur Sindgi Almel 2009-10 solarisation for computer Solar System 40000 40000 0 Completed Bijapur Sindgi Almel 2009-10 Construction of compound and concrete to gram panchayat Compound wall 160000 160000 0 Completed Bijapur Sindgi Almel 2009-10 Construction of gril and gate to gram panchayat Construction of Gram Panchayat190000 Building 190000 0 Completed Bijapur Sindgi Almel 2009-10 Construction of c.c. road near temple and construction of drinage near loni house Drainage 135000 135000 135000 Completed Bijapur Sindgi Almel 2010-11 administrative charges other works 13000 0 0 Not Started Bijapur Sindgi Almel 2010-11 Construction of c.c. road from kallur house to veerbhadra temple CC Road 140000 0 0 Completed Bijapur Sindgi Almel 2010-11 Construction of c.c. road from jumma masajid to aravinda studio CC Road 199000 0 0 Completed Bijapur Sindgi Almel 2010-11 Construction of c.c. road from gopal badiger to kalmani house CC Road 199000 100000 100000 Completed Bijapur Sindgi Almel 2010-11 Construction of c.c. road from byakod shop i to akkatangi well CC Road 150000 120000 120000 Completed Bijapur Sindgi Aski 2006-07 Doing stone pitching to road at Aski Village (From Vanakyaldavar House to Pattar House) Pitching Work 60000 60000 0 Completed Bijapur Sindgi Aski 2006-07 Doing stone pitching to road at Aski Village (From Vanakyaldavar House to Pattar House) Pitching Work 60000 60000 0 Completed Bijapur Sindgi Aski 2006-07 Flooring to the road at Aski Village (@ Ward no 2 Near Tumbagi House) CC Road 60000 60000 0 Completed 1. Repairs to Anganawadi Building at Neeralagi Village, 2. Construction of Dhobhi Ghat at Janata Bijapur Sindgi Aski 2006-07 CC Road 50000 50000 30000 Completed Colony. 3. Construction of Road at Neeralagi Village (From Open Well to Peerapur Road) Construction of Drain at Bannetti PT Village (From Primary School to Halla) 2) Repairs to Water Bijapur Sindgi Aski 2006-07 Drainage 100000 100000 37000 Completed Tank at Bannetti PT (O.H.T) Bijapur Sindgi Aski 2006-07 Construction of Drain to road at Aski Village (From kariyappa House to SC Colony) CC Road and Drainage 50000 50000 50000 Completed Bijapur Sindgi Aski 2007-08 Construcation of Bus stand Bus Stand 0 0 0 Completed Bijapur Sindgi Aski 2007-08 Janata Kalani Water Pipelilne Drinking Water Supply 0 0 0 Completed Bijapur Sindgi Aski 2007-08 Administrative Amount other works 0 0 0 Completed Bijapur Sindgi Aski 2008-09 Construction of C.C.Road from Sangayya Math CC Road 70000 70000 0 Completed Bijapur Sindgi Aski 2008-09 Construction of Stone Road from Pattar house to surver House CC Road 70000 70000 0 Completed Bijapur Sindgi Aski 2008-09 Provoding Water supply work to Aski Village Drinking Water Supply 70000 70000 0 Completed Bijapur Sindgi Aski 2008-09 Construction of C.C.Road from Madar Coloney CC Road 110000 110000 0 Completed Bijapur Sindgi Aski 2008-09 Improvements to road CC Road 150000 150000 0 Completed Bijapur Sindgi Aski 2008-09 Construction of Gram Panchayath Building Construction of Gram Panchayat198000 Building 198000 0 Progress Bijapur Sindgi Aski 2008-09 Construction of stone Road from S P House socity CC Road 70000 70000 70000 Completed Bijapur Sindgi Aski 2008-09 Construction of Drinage from Near SC Borewell Drainage 80000 80000 80000 Completed Bijapur Sindgi Aski 2009-10 administrative charges other works 25000 0 0 Not Started Bijapur Sindgi Aski 2009-10 constuction of chak dam to pond Water Tank 85000 0 0 Progress Bijapur Sindgi Aski 2009-10 constuction of open drama building bannetti p.a Drama Theater 140000 0 0 Progress Bijapur Sindgi Aski 2009-10 constuction of bus stop in neeralagi village Bus Stand 179000 0 0 Progress Bijapur Sindgi Aski 2009-10 construction of g.p.building Construction of Gram Panchayat190000 Building 0 0 Progress Bijapur Sindgi Aski 2009-10 solarisation for computer Solar System 36000 36000 0 Completed Bijapur Sindgi Aski 2010-11 Construction of play ground to primary school School Compound and Buildings25000 0 0 Not Started Bijapur Sindgi Aski 2010-11 Construction of bus stand Bus Stand 50000 0 0 Not Started Bijapur Sindgi Aski 2010-11 Construction ofroad and improvement of road CC Road 50000 0 0 Not Started Bijapur Sindgi Aski 2010-11 providing water to school and anganawadi and consrtuction of toilet Construction of Toilet 50000 0 0 Not Started Bijapur Sindgi Aski 2010-11 Construction of drinage beside the road Drainage 50000 0 0 Not Started Bijapur Sindgi Aski 2010-11 Construction of drinage beside the road Drainage 50000 0 0 Not Started Bijapur Sindgi Aski 2010-11 consrtuction of shopping complexes Shopping mall 50000 0 0 Not Started Bijapur Sindgi Aski 2010-11 Construction of drinage and c.c.road Drainage 55000 0 0 Not Started Bijapur Sindgi Aski 2010-11 Construction of houses for public other works 55000 0 0 Not Started Bijapur Sindgi Aski 2010-11 aministrative charges other works 56000 0 0 Not Started Bijapur Sindgi Bagalur 2006-07 Construction of CC Road from Agasi to Chandrashekar Temple at Bagalur Village CC Road 125000 125000 0 Completed Construction of CC Road from Mahadevappa Hipparagi House to Saibanna Pujari House at Bagalur Bijapur Sindgi Bagalur 2006-07 CC Road 125000 125000 0 Completed Village. Construction of CC Road from Mahantappa Madar house to Sharanappa Diddiyavar House in Bijapur Sindgi Bagalur 2006-07 CC Road 125000 125000 0 Completed Chikkahavalagi Village. Bijapur Sindgi Bagalur 2006-07 Construction of CC Road from Main Road to Sangameshwar Temple at Bagalur Village.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us