Central Valley Project Overview July 2013 Central Valley of California TRINITY DAM FOLSOM DAM LV SL Hydrologic Constraints • Majority of water supply in the north • Most of the precipitation is in the winter/spring • Majority of demand in the south • Most of that demand is in the summer Geographic Constraints Sacramento/San Joaquin Delta Avg Annual Inflow in MAF (Billion Cu Meters) (5.3) 4.3 (1.7) 1.4 (1.1) 0.9 21.2 (26.2) Sacramento Delta Precip Eastside Streams San Joaquin California Water Projects • State Water Project • Central Valley Project • Local Water Projects Trinity CVP Shasta Major Storage Folsom Facilities New Melones Friant San Luis Trinity CVP Shasta Conveyance Folsom Facilities New Melones Friant San Luis CVP Features Summary • 18 Dams and Reservoirs • 500 Miles (800 Kilometers) of Canals • 11 Powerplants • 10 Pumping Plants • 20 Percent of State’s Developed Water Supply (about 7 million acre-feet, 8.6 billion cu meters) • 30 Percent of the State’s Agricultural Supply (about 3 mil acres of farm land, 1.2 mil hectares) • 13 Percent of State’s M&I Supply (about 2 million people served) CVP Authorized Purposes • Flood Control • River Regulation (Navigation) • Fish and Wildlife Needs • Municipal & Agricultural Water Supplies • Power Generation • Recreation TRINITY CVP - SWP FEATURES LEWISTON SHASTA SPRING CREEK POWERPLANT CARR POWERPLANT TINITY RIVER WHISKEYTOWN OROVILLE (SWP) TO SAN FRANCISCO BAY DELTA FOLSOM BANKS PP (SWP) JONES PP NEW MELONES O’NEILL TO SAN FELIPE SAN LUIS FRIANT TRINITY CVP - SWP FEATURES LEWISTON SHASTA SPRING CREEK POWERPLANT CARR POWERPLANT TINITY RIVER WHISKEYTOWN OROVILLE (SWP) TO SAN FRANCISCO BAY DELTA FOLSOM BANKS PP (SWP) JONES PP NEW MELONES O’NEILL TO SAN FELIPE SAN LUIS FRIANT Permits and Agreements Key Operating Agreements and Standards • Water Right Permits • Water Rights Decision 1641 • Biological Opinions • Flood Control Manuals • Central Valley Project Improvement Act • Coordinated Operations Agreement Delta Water Quality Standards Water Quality Standards 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 0 1978 1980 1982 1984 1986 Total Annual Water Annual ExportsTotal from 1978-2011 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 Total Exports Federal Exports Total State Exports Total System Constraints • Maximize contractual water supply deliveries given the constraints of the system: – Geographic – Hydrologic – Physical Capacity – Flood Control requirements – Environmental (i.e. water quality, outflow) – Contractual, ESA and Water Rights Requirements – Economic – Demand Patterns Questions ? .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages24 Page
-
File Size-