Weekly Road Report

Weekly Road Report

LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) !~~To Fr Weekly Road Report Western Region 24 May 2019 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: CHIFLEY ROAD – MR516 Work type: Bridge Approaches construction and road realignment. Location: 10Km East of Lithgow at Clarence Lane closures: intermittent lane closures during working hours. Works to be completed behind steel barriers Impact: Delays up to 10 minutes can be expected. Speed restrictions: 40, 60, km/h as directed. Working days: Mon – Saturday Working hours: 0700 – 1800 hours Mon-Fri - 0700 to 1300 Sat Expected completion: July 30 2020 Advice / Comments: Please obey all signs and proceed with care. Speed reduction in place after hours. Project Manager: Pat Pina – 0429 986 576 Communications Lead: Lisa Kennedy – 0473 837 959 PRIMARY LOCATION: CASTLEREAGH HIGHWAY – HW18 Work type: Traffic barrier repairs following crash damage to bridge. Location: Wyaldra Creek Bridge, 5km Northwest of Gulgong. Lane closures: One lane will be closed between 07:00 and 17:00 Impact: Temporary vehicle barriers on bridge resulting in narrow lanes of approx. 3.1m until further notice. Speed restrictions: 40 km/h as directed. Working days: Mon to Sun. Working hours: 24 hours. Expected completion: June 07 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Tim Stone – 0429 369 433 Communications Lead: PRIMARY LOCATION: DUCKMALOI ROAD – MR558 Work type: Bridge barrier upgrade Location: Duckmaloi Bridge, Duckmaloi River 14kms E of Oberon. Lane closures: None Impact: None Speed restrictions: 60km/h as directed over bridge Working days: N/A. Working hours: Speed restriction in place 24 hours/day. Expected completion: Reduced speed zone applies until further notice. Advice / Comments: Please obey all speed zone signs and proceed with care. Project Manager: Tim Stone – 0429 369 433 Communications Lead: Amy Millerd – 0427 063 855 Page 1 of 14 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: CASTLEREAGH HIGHWAY – HW18 Work type: Pavement Widening and drainage works Location: 0 - 3.7 km North of Riverlea Road on the Castlereagh Highway Lane closures: One lane closed during working hours Impact: Delays of up to 5 mins can be expected Speed restrictions: 40 km/h as directed. Working days: Mon – Sat Working hours: 0700-1800 Expected completion: June 20 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Karolina Kosmicki – 0428 400 448 Communications Lead: Kylie Buckenhofer – 0447 215 381 PRIMARY LOCATION: MITCHELL HIGHWAY – HW7 Work type: Installation of Flexible Centre Barrier and shoulder widening Location: Vittoria, 23km west of Bathurst on the Mitchell HWY Lane closures: Intermittent lane closures during working hours. Works to be completed behind steel barriers Impact: Delays up to 5 mins can be expected Speed restrictions: 40 km/h, 60 km/h as directed Working days: Monday – Saturday Working hours: 0700-1800 Mon-Fri and 0700 to 1300 Sat Expected completion: Late June 2019 Advice / comments: Please obey all signs and proceed with care. Speed reduction in place after hours Project Manager: Stuart Cope – 0409 837 491 Communications Lead: Amy Millerd – 0427 063 855 PRIMARY LOCATION: CASTLEREAGH HIGHWAY – HW18 Work type: Shoulder works and heavy patching with kerb and gutter works. Location: 0-3.1 km North of intersection with Razorback on the Castlereagh Highway Lane closures: One lane closed during working hours Impact: Delays of up to 5 mins can be expected Speed restrictions: 40 km/h as directed and 60km/hr after hours in work areas. Working days: Mon – Sat Working hours: 0700-1800 Expected completion: June 20 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Karolina Kosmicki – 0428 400 448 Communications Lead: Kylie Buckenhofer – 0447 215 381 PRIMARY LOCATION: MID WESTERN HIGHWAY – HW6 Work type: Guardrail upgrades Location: Cherry Tree Hill, 3 km West of Bathurst on the Mid Western HWY Lane closures: Intermittent lane closures during working hours Impact: Delays of up to 5 mins can be expected Speed restrictions: 40 km/h, 60km/h as directed. Working days: Monday-Friday Working hours: 0700-1800 Expected completion: 31st May 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Miles Harrison 0407047256 Page 2 of 14 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: GREAT WESTERN HIGHWAY – HW5 Work type: Wire rope Safety Barrier maintenance Location: 30 km West of Lithgow, Diamond Swamp Lane closures: One lane Closed during work hours. Impact: Delays of up to 5mins can be expected. Speed restrictions: 40, 60 km/h as directed. Working days: Mon - Tues Working hours: 0700-1700 Expected commencement: May 27 2019 Expected completion: May 28 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Miles Harrison Communications Lead: PRIMARY LOCATION: GREAT WESTERN HIGHWAY – HW5 Work type: Culvert Maintenance Location: Unnamed Creek, 27.6 km West of Lithgow Lane closures: No lane closures. Impact: No delays expected, reduced speed limit due to working near traffic. Speed restrictions: 80 km/h as directed. Working days: Mon - Fri Working hours: 0700-1700 Expected commencement: May 22 2019 Expected completion: May 31 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Tim Stone 0429 369 433 Communications Lead: PRIMARY LOCATION: GREAT WESTERN HIGHWAY – HW5 Work type: Installation of Flexible Centre Barrier and shoulder widening Location: Mt Lambie, 18km west of Lithgow on the Great Western HWY Lane closures: Intermittent lane closures during working hours Impact: Delays up to 5 mins can be expected Speed restrictions: 40 km/h, 60 km/h as directed Working days: Monday – Saturday Working hours: 0700-1800 Mon-Fri and 0700 to 1300 Sat Expected completion: Late June 2019 Advice / comments: Please obey all signs and proceed with care. Speed reduction in place after hours Project Manager: Brett Gould – 0428 778 944 Communications Lead: Amy Millerd – 0427 063 855 Page 3 of 14 LITHGOW / BATHURST DISTRICT (Inc. Lithgow, Bathurst, Orange and Mudgee areas) PRIMARY LOCATION: CANOWINDRA ROAD - MR310 Work type: Clear Zone improvement works Location: 0.00 to 2.7km north of Mount York Road, Canowindra Lane closures: One lane closed during working hours Impact: Delays of up to 5 mins can be expected Speed restrictions: 40/60 and 80 km/h as directed. Working days: Mon - Sat Working hours: 0700 - 1800 Expected completion: May 31 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Angelo Emmanuel – 0427 780 212 Communications Lead: Amy Millerd – 0427 063 855 PRIMARY LOCATION: MID WESTERN HWY – HW6 Work type: Clear Zone improvement works Location: 9.2km to 32km north east from Cowra Lane closures: One lane closed during working hours Impact: Delays of up to 5 mins can be expected Speed restrictions: 40/60 and 80 km/h as directed. Working days: Mon – Sat Working hours: 0700-1800 Expected completion: June 30 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Angelo Emmanuel – 0427 780 212 Communications Lead: Amy Millerd – 0427 063 855 Page 4 of 14 DUBBO DISTRICT (Inc. Forbes, Cobar, Coolah, Bourke, Parkes, Walgett & Wellington areas) PRIMARY LOCATION: GOLDEN HIGHWAY – HW27 Work type: Electrical utility relocations Location: Craboon Village to Castlereagh Hwy, 6-8km east of Dunedoo Lane closures: Safety barriers in place – lane width restricted Impact: Lane width restricted to 8 metres for length of 250 metres Speed restrictions: 60 km/h Working days: Mon to Sun Working hours: 24 hr Expected completion: May 31 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Kim Woodman – 0439 586 830 Communications Lead: PRIMARY LOCATION: GOLDEN HIGHWAY – HW27 Work type: Bridge Traffic Barrier Repairs Location: Talbragar Bridge and Piper’s Bridge at Uarbry, 40km E of Dunedoo Lane closures: 1 lane of 2 will be closed during daytime work hours. Impact: Delays of 5 minutes can be expected Speed restrictions: 40 km/h Working days: Mon to Fri Working hours: 0700 to 1700 Expected commencement: May 27 2019 Expected completion: June 14 2019 Advice / comments: Please obey all signs and proceed with care. Project Manager: Tim Stone – 0429 369 433 Communications Lead: PRIMARY LOCATION: NEWELL HIGHWAY – HW17 Work Type: South Dubbo Rehabilitation Location: Newell Highway – near Golf Links Creek and Minore Road Lane Closures: Intermittent Lane Closure Impact: Short delays may be expected Speed restrictions: 40, 60,80 km/h as directed. Working days: Monday to Saturday Working hours: Monday-Friday 0700-1800 , Sat 0700 to 1700 Expected commencement: April 29 2019 Expected completion: June 28 2019 Advice / Comments: Please obey all signs and proceed with care Project Manager: Isaac Widdison 0400 821 755 Communications Lead: Kylie Buckenhofer – 0447 215 381 Page 5 of 14 DUBBO DISTRICT (Inc. Forbes, Cobar, Coolah, Bourke, Parkes, Walgett & Wellington areas) PRIMARY LOCATION: NEWELL HIGHWAY – HW17 Work Type: SLCR Kerbs Location: Approx 16kms south of Gilgandra on the Newell Highway Lane Closures: Intermittent lane closures. Impact: Potential short delays may expected. Speed restrictions: 40, 60, 80 km/h as directed. Working days: Mon to Fri Working hours: Mon – Fri 0700 to 1800 Commencement

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us