Final Report - Task 6 Environmental Impact Assessment (Volu~

Final Report - Task 6 Environmental Impact Assessment (Volu~

DRAINAGE SERVICES DEPARTMENT LAND DRAINAGE DIVISION Agreement No. CE 27/94 r FINAL REPORT - TASK 6 ENVIRONMENTAL IMPACT ASSESSMENT (VOLU~ . • . Li lJl :1.C'~f May 1997 Hyder Consulting Limited in association with Delft Hydraulics • Dredging Research Limited University of Strathclyde • Hyder Environmental Limited [ Agreement No CE27/94 Territorial Land Drainage and Flood Control Strategy Study Phase III - Sedimentation Study [ Final Report, Task 6 - Environmental Impact Assessment E EP.D. Libr2\l-Y [ [ C D D c FINAL REPORT - TASK 6 o ENVIRONMENTAL [ IMPACT ASSESSMENT (VOLU~p_.B.b··.'., I• -,." ~,--." '1''' ~ ....... - '"; - _,,; .~. t)i .r.lJ Y [ May 1997 C [ C [ [ [ [ \[ Hyder Consulting Limited RT-1360-84/0 IICOVER.DOC 1L [ [ Q [ C o o o o o [ [ o [ o [ c VOLUMEB [ [ L f L Agreement No CE27/94 Territorial Land Drainage and Flood Control Strategy Study Phase ill - Sedimentation Study [ Final Report, Task 6 - Environmental Impact Assessment C VOLUMEB LIST OF FIGURES LIST OF TABLES C LIST OF APPENDICES o 10. EIA OF DREDGING WORKS IN RIVER SILVER 10.1 Introduction 10.2 Existing Environment o 10.3 Proposed Works 10.4 Key Issues o 10.5 Impact Assessment o 10.6 Mitigation Measures 11. EIA OF DREDGING WORKS IN STAUNTON CREEK NULLAH D 11.1 Introduction 11.2 Existing Environment o 11.3 Proposed Works 11.4 Key Issues [ 11.5 Impact Assessment o 11.6 Mitigation Measures 12. EIA OF DREDGING WORKS IN KAI TAK 12.1 Introduction o 12.2 Existing Environment 12.3 Proposed Works c 12.4 Key Issues 12.5 Impact Assessment o 12.6 Mitigation Measures o 13. EIA OF DREDGING WORKS IN SHING MUN RIVER CHANNEL 13.1 Introduction [ 13.2 Existing Environment 13.3 Proposed Works [ 13.4 Key Issues 13.5 Impact Assessment [ 13.6 Mitigation Measures [: , Contents Page .", Hyder Consulting Limited . ') RT-1360-84/01 I CONT.DOC Page 6 of13 Agreement No CE27/94 L Territorial Land Drainage and Flood Control Strategy Stody Phase III - Sedimentation Stody Final Report, Task 6 - Environmental Impact Assessment [ 14. EIA OF DREDGING WORKS IN TAl PO I LAM TSUEN RIVER CHANNELS AND TRIBUTARIES E 14.1 Introduction 14.2 Existing Environment [ 14.3 Proposed Work 14.4 Key Issues [ 14.5 Impact Assessment 14.6 Mitigation Measures o 15. EIA OF DREDGING WORKS IN THE RIVER INDUS CHANNEL 15.1 Introduction c 15.2 Existing Environment 15.3 Proposed Works o 15.4 Key Issues .......... 15.5 Impact Assessment o 15.6 Mitigation Measures o 16. EIA OF DREDGING WORKS IN THE SAN TIN RIVER CHANNEL 16.1 Introduction o 16.2 Existing Environment 16.3 Proposed Works [ 16.4 Key Issues 16.5 Impact Assessment 16.6 Mitigation Measures c 17. EIA OF DREDGING WORKS IN YUEN LONG, KAM TIN AND NGAU TAM c MEl MAIN DRAINAGE CHANNEL 17.1 Introduction o 17.2 Existing Environment 17.3 Proposed Works c 17.4 Key Issues 17.5 Impact Assessment 17.6 Mitigation Measures c 18. EIA OF DREDGING WORKS IN TIN SHUI W AI RIVER CHANNELS [ 18.1 Introduction 18.2 Existing Environment [ 18.3 Proposed Works [ Hyder Consulting Limited Contents Page RT-1360-84/01 I CONT.DOC Page 7 of13 r L ) Agreement No CE27/94 Territorial Land Drainage and Flood Control Strategy Study Phase III - Sedimentation Study [ Final Report, Task 6 - Environmental Impact Assessment n 18.4 Key Issues L 18.5 Impact Assessment 18.6 Mitigation Measures [ 19_ EIA OF DREDGING WORKS IN TUEN MUN RIVER CHANNEL o 19.1 Introduction 19.2 Existing Environment 19.3 Proposed Works o 19.4 Key Issues 19.5 Impact Assessment o 19.6 Mitigation Measures o 20. EIA OF DREDGING WORKS IN SO KWUN WAT RIVER CHANNEL 20.1 Introduction o 20.2 Existing Environment 20.3 Proposed Works o 20.4 Key Issues 20.5 Impact Assessment c 20.6 Mitigation Measures [ 21. EIA OF DREDGING WORKS IN TAl LAM CHUNG RIVER CHANNEL 21.1 Introduction o 21.2 Existing Environment 21.3 Proposed Works [ 21.4 Key Issues 21.5 Impact Assessment 21.6 Mitigation Measures 22. EIA OF DREDGING WORKS IN SHAM TSENG NULLAH o 22.1 Introduction 22.2 Existing Environment o 22.3 Proposed Works 22.4 Key Issues [ 22.5 Impact Assessment 22.6 Mitigation Measures [ REFERENCES APPENDICES [ COMMENTS AND RESPONSES Hyder Consulting Limited Contents Page ! - RT-1360-84/01 I CONT.DOC Page 8 of 13 Agreement No CE27/94 L Territorial Land Drainage and Flood Control Strategy Stndy Phase III - Sedimentation Stndy Final Report, Task 6 - Environmental Impact Assessment [ LIST OF FIGURES 10.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging E Locations: River Silver 10,2 Water Quality Monitoring Results from 15/04/1996: River Silver [ 10.3 Sediment Grab Analysis Results: River Silver [ 11.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: Staunton Creek Nullah 11.2 Sediment Core Analysis Results: Staunton Creek Nullah and Kai Tak o Nullah c 12.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: Kai Tak Nullah 12.2 Sediment Grab Analysis Results: Kai Tak Nullah o .13.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging o Locations: Shing Mun River and Tributaries 13.2 Water Quality Monitoring Results from 17/04/1996: Shing Mun River and Tributaries o 13.3 Sediment Grab Analysis Results: Shing Mun River and Tributaries 13.4 Sediment Core Analysis Results: Shing Mun River and Tributaries o 14.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: Tai Po RiverlLam Tsuen River Channel and Tributaries 14.2 Water Quality Monitoring Results from 17/0411996: Tai Po RiverlLam Tsuen River Channel and Tributaries o 14.3 Sediment Core Analysis Results: Tai Po RiverlLam Tsuen River Channel and Tributaries c 15.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: River Indus Channel and Tributaries - Present Scenario o 15.2 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: River Indus Channel and Tributaries - Future Scenario c 15.3 Water Quality Monitoring Results from 16/04/1996: River Indus and Tributaries [ 15.4 Sediment Core Analysis Results: River Indus and Tributaries 16.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging l Locations: San Tin Main Drainage Channels - Present Scenario 16.2 Potential Noise and Air Sensitive Receivers Near Proposed Dredging [ Locations: San Tin Main Drainage Channels - Future Scenario [ Hyder Consulting Limited Contents Page RT-1360-84/011 CONT.DOC Page 9 of13 r L Agreement No CE27/94 Territorial Land Drainage and Flood Control Strategy Study Phase III - Sedimentation Study C Final Report, Task 6 - Environmental Impact Assessment 16.3 Sediment Core Analysis Results: San Tin Main Drainage Channels 16.4 Bird Transect Locations: San Tin Drainage Channels 16.5 Proposed Dredging Locations In Relation To Restricted Areas: [ Tin Shui wai W &E Drainage Channels San Tin Main Drainage Channels - Present Scenario 16.6 Proposed Dredging Locations In Relation To Restricted Areas: c San Tin Main Drainage Channels and Yuen Long - Futnre Scenario o 17.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: Yuen Long / Kam Tin / Ngau Tam Mei River Channels - o Future Scenario 18.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging o Locations: Tin Shui Wai Western and Eastern Drainage Channels 18.2 Water Quality Monitoring Results from 16/04/1996: Tin Shui Wai Western and Eastern Drainage Channels o 18.3 Sediment Core Analysis Results: Tin Shui Wai Western and Eastern Drainage Channels o 18.4 Bird Transect Locations: Tin Shui Wai Western and Eastern Chainage Channels c 19.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: Tuen Mun River Channel c 19.2 Water Quality Monitoring Results from 18/04/1996: Tuen Mun River Channel o 19.3 Sediment Core Analysis Results: Tuen Mun River Channel 20.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging Locations: So Kwun Wat Drainage Channel o 20.2 Sediment Grab Analysis Results: So Kwun Wat Drainage Channel 21.1 Potential Noise and Air Sensitive Receivers Near Proposed Dredging o Locations: Tai Lam Chung River Channel 21.2 Sediment Grab Analysis Results: Tai Lam Chung River Channel [ 22.1 Potential Noise.and Air Sensitive Receivers Near Proposed Dredging Locations: Sham Tseng Nullah [ 22.2 Water Quality Monitoring Results from 18/04/1996: Sham Tseng Nullah [ [ Hyder Consulting Limited Contents Page [ RT-1360-84/01/CONT.DOC Page 10 of 13 Agreement No CE27/94 L Territorial Land Drainage and Flood Control Strategy Study Phase III - Sedimentation Study Final Report, Task 6 - Environmental Impact Assessment [ LIST OF TABLES E 10.1 Summary of Baseline Air Quality Monitoring Results 10.2 Summary of Baseline Noise Monitoring Results C 10.3 Summary of Water Quality Monitoring Results 10.4 Description of Noise Sensitive Receivers C 10.S Typical mix of Equipment for Dredging Operations 10.6 Unmitigated Noise Levels at NSRs 10.7 Mitigated Noise Levels at NSRs D 11.1 Description of Noise Sensitive Receivers D 11.2 Typical mix of Equipment for Dredging Operations 11.3 Unmitigated Noise Levels at NSRs D 13.1 Summary of Baseline Air Quality Monitoring Results D 13.2 Summary of Baseline Noise Monitoring Results 13.3 Summary of Water Quality Monitoring Results D 13.4 Description of Noise Sensitive Receivers 13.S Typical mix of Equipment for Dredging Operations D 13.6 Unmitigated Noise Levels at NSRs 13.7 Mitigated Noise Levels atNSRs D 14.1 Summary of Baseline Air Quality Monitoring Results 14.2 Summary of Baseline Noise Monitoring Results D 14.3 Summary of Pollutant Loadings into Tolo Harbour 14.4 Summary of Water Quality Monitoring Results 0 14.S Water Quality at Station ES 14.6 Water Quality at Station E6 0 14.7 Description of Noise Sensitive Receivers 14.8 Typical mix of Equipment for Dredging Operations C 14.9 Unmitigated Noise Levels at NSRs .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    313 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us