South Eastern Freeway Pavement Rehabilitation – Tollgate to Heysen Tunnels Detour for Oversize Vehicles – Update

South Eastern Freeway Pavement Rehabilitation – Tollgate to Heysen Tunnels Detour for Oversize Vehicles – Update

Notification · March 2021 Roads South Eastern Freeway Pavement Rehabilitation – Tollgate to Heysen Tunnels Detour for Oversize Vehicles – Update Further to our previous notification on Wednesday, 24 February 2021, vehicles up to 3.4 metres in width are now able to travel on the city bound lanes of the freeway between the Stirling Interchange and the Glen Osmond Tollgate, effective immediately. Previously, this access was limited to vehicles up to 3.2 metres in width. City bound vehicles greater than 3.4 metres in width need to continue detouring through Murray Bridge via Hindmarsh Road, Maurice Road and Cypress Terrace and then follow Mannum Road towards the Sturt Highway via Randell Road, onto Ridley Road, Angas Valley Road and Halfway House Road, onto the Sturt Highway. Access for city bound oversize vehicles is permitted up until the Stirling Interchange. All other heavy vehicle movements (vehicles less than 3.4 metres in width) are permitted. Signage located in Tailem Bend is in place to advise heavy vehicle operators of the changed conditions. Oversize operators, should consider if permits are affected by the above restrictions. If you require an amendment to your permit, please contact the National Heavy Vehicle Regulator on 1300 696 487 or [email protected] From early April 2021, until approximately mid-2021, weather permitting, vehicles greater than 3.4 metres wide will not be permitted to travel uphill (outbound) on the South Eastern Freeway between the Glen Osmond Tollgate and Stirling Interchange. Detour will be via the Sturt Highway and Murray Bridge, as outlined above. Please note also that there will be five weekends (from 7pm Friday – 6am Monday) between April and mid- 2021, where detours for vehicles greater than 3.4 metres in width will be required. Advance notification of these dates will be provided. For more information on the project, or to register for project updates, please contact the project team via: visit: www.dit.sa.gov.au/SEFreeway email: [email protected] telephone: 1300 103 456 SitePodium: stay up to date with the project via the SitePodium app, visit www.dit.sa.gov.au/SEFreeway for details on how to download the app. Kind regards South Eastern Freeway Pavement Rehabilitation Project Team Notification · February 2021 Road .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us