Coventry Very Light Rail – a 21St Century Low-Cost Tram Solution

Coventry Very Light Rail – a 21St Century Low-Cost Tram Solution

Coventry Very Light Rail – a 21st Century low-cost tram solution Dr Nick Mallinson, Programme Manager Context Coventry is growing rapidly • as are many medium sized cities in the UK Significant road congestion and emissions • urgent need for an improved public transport system which encourages modal shift from cars Affordable long-term solution required • trams are too expensive but rail based solutions offer permanence not provided by buses The Quest for Low Cost Urban Rail In 2017, Coventry City Council commissioned WMG to carry out 2 feasibility studies: • A study focussed on low cost ‘tram’ vehicles • A study focussed on low-cost utility-friendly track solutions In early 2018 Coventry City Council awarded an £5.0m contract to WMG to oversee the development of a battery powered vehicle (to be ‘autonomous ready’) – a contract for delivery of a track solution is close to agreement The aim is to achieve a total whole-system target cost of around £7m per kilometre Note: traditional tram solutions typically cost between £35m to £60m per kilometre A fleet of shuttles running at 3 to 5 minute intervals will provide ‘tube-like’ service Autonomous (driverless) vehicles will cut operational costs Coventry VLR Research & Development Four work streams: • Vehicle – (led by WMG) design and construction of a lightweight vehicle prototype, including a battery propulsion system • Track – (led by WMG) creation of an innovative low-cost track form which can be installed into roads with minimal disruption to utilities’ equipment • Route Selection – (Coventry City Council) route development, business case and Transport & Works Act Order • Operations – (Transport for West Midlands): system operation (control, security, ticketing), passenger information and communications Route Aspirations A clover leaf network covering high density housing and commercial areas of the city Future shuttle line from city centre to HS2 station at Birmingham Airport Vehicle Workstream Main features: • Bi-directional car • Low floor, 2 bogies • 15m radius cornering capability • 6.8 tonnes tare • Capacity 50+ (18 seats plus standees) • Composite construction • Battery powered (no overhead catenary) • Charging of batteries via contacts on vehicle roof – electric bus chargers to be used • Control system to SIL 3 • Autonomous ready Coventry VLR Shuttle Dimensions • 10 m long • 2.7m wide • 2.95m high • 4 doors Industrial Partners working with WMG TDI: lead designers Tikab & Arogus: bogie design/supply & SIL 3 control system RDM: vehicle assembly & autonomous technology Transcal: metal fabrications, seating & interior fittings Vehicle Components Vehicle Interior – Standard Mode Passenger Capacity Track Solution • The construction cost of new tram routes is dominated by the relocation costs of utilities • Ways to minimise the need for utility diversions will create opportunities for large savings • Early consultation with utilities is crucial – this has been a main priority in recent months • Discussions with utilities have been constructive • WMG now ready to procure industrial partners to work on the track solution Track Work Stream Requirements of novel track form: • Acceptance from utilities that relocation of their assets is not generally required • No thicker than tarmac layer on surface of the road • Subsoil loads no greater than with existing road traffic • Reduced disruption during installation with minimal ‘precision’ excavation • Modular construction - 6m to 8m long sections manufactured off-site • Rapid, easy removal and reinstatement for utilities • Quiet and cyclist friendly Low Profile Rall System Surface Course Binder Course Base Course Sub-base High performance Fibre Reinforced Cementitious Composite(HPFRCC) Sub-grade Coventry VLR high level plan R&D track available Coventry VLR City of Culture First Route start R&D track Exhibition build of construction 2018 2019 2020 2021 2022 2023 Vehicle supplier Vehicle design Vehicle ready Vehicle ready Autonomous vehicle contracted sign off for track test start testing Low cost trackform research low cost trackform prove out Transport Works Act for Coventry Very Light Rail Track research project ‘Hub-to-Home’ • Our vision is that VLR shuttles will be part of integrated public transport solutions • Journeys might begin or be completed by autonomous road “pods”, providing travellers with frictionless public transport from door-to-door Questions? Contact: Nick Mallinson [email protected] Tel: 07876218112 or Nicola Small [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us