5. Tree and Woodland Priorities by Landscape Character Area

5. Tree and Woodland Priorities by Landscape Character Area

A TREE AND WOODLAND STRATEGY FOR THE WEST OF ENGLAND 5. Tree and Woodland Priorities by Landscape Character Area with local and regional experts. It is therefore The Principles for Tree and Woodland recommended that expert advice, including from Establishment and Management, as set out ecologists, is sought when interpreting these in Section 4, provide an important reference priorities where possible. For advice relating to for augmenting the benefits that trees and trees and woodland in a riparian (i.e. riverbank) woodlands can provide. However, in order to context, it is recommended that advice is sought ensure that the right trees are established in from the Bristol Avon Rivers Trust – their the right places, and thereby truly maximise the approach to tree planting is a useful starting benefits of trees and woodlands, it is necessary point. for landowners, delivery bodies, communities The tables below also indicate within which of and individuals to know the context in which the following three broader areas each GI Area they work. and LCA falls: The tables below set out a list of tree and l The Mendip Hills Area of Outstanding Natural woodland priorities for each Landscape Beauty (AONB); Character Area (LCA) in the West of England, l The Cotswolds AONB; or organised by the numbered Green Infrastructure (GI) Areas as developed through the JGIS l The Forest of Avon, which is the West of and shown on the map in Figure 9. As the England’s Community Forest and covers the boundaries of the GI Areas do not always follow area in the West of England outside of the two those of LCAs, particularly at the borders AONBs. between local authorities, some LCAs are Definitions of any acronyms used can be found included under two GI Areas. Urban areas in Appendix II: List of Acronyms used. (for which LCAs are not provided for some local authorities) are included under adjacent Every effort has been made to ensure LCAs, which is made clear in the text. A map is consistency between these priorities and the provided at the start of each GI Area showing guidelines and plans in place in the AONBs. the subdivisions under which the priorities are However, in areas that are within the Cotswolds listed. AONB or the Mendip Hills AONB particular attention should be paid to ensuring that action It is intended that the priorities are used to is consistent with their character, including inform and prioritise tree planting, woodland referring to the Cotswold AONB Landscape creation and management in the LCAs, and Strategies and Guidance or the Mendip Hills also to highlight areas in which tree planting AONB Management Plan. is not or may not be appropriate. Their use could be both at the local (e.g. community tree The priorities have been determined through planting) and strategic (e.g. local authority plans interpretation of Nature Recovery Network for increasing tree and woodland cover) level. mapping; Landscape Character Assessment They will also inform delivery of the Strategic mapping and descriptions, in the context of Woodland Areas contained in Section 2.2.4 of MAGIC habitat, designation and grant scheme this document. mapping; and Agricultural Land Classification mapping. They reflect the Principles set out The priorities are expressed as actions for in Section 4 (reiterating aspects of these) brevity. However, it should be made clear that and are also consistent with the approach these priorities are for guidance only and place in a Community Forest Plan. For those LCAs no obligation on landowners or delivery bodies. within either of the AONBs, the relevant AONB Neither are the priorities a substitute for on- Management plan has been used to inform the-ground knowledge and local expertise, and, the priorities and the AONB Units have been ideally, they should facilitate further discussion consulted on the text. 67 THE FOREST OF AVON PLAN Delivery against these priorities will require close working with landowners, as well as action by a wide range of partners, with specific reference to planning policy and guidance including, as appropriate, Environmental Impact Assessments (EIAs) and statutory consultation requirements65. Figure 9 West of England Green Infrastructure (GI) Areas, as defined in the West of England Joint Green Infrastructure Strategy (JGIS). These GI Areas have been used to organise Tree and Woodland Priorities by Landscape Character Area. The numbering is consistent with that used in this section (e.g. GI Area 1 is within Section 5.1). 65 https://www.gov.uk/guidance/assess-environmental-impact-before-you-create-new-woodland 68 A TREE AND WOODLAND STRATEGY FOR THE WEST OF ENGLAND 5.1 Clevedon, Portishead and Gordano Forest of Avon Map Ref: 1.1 Map Ref: 1.2 Clapton Moor (NSC A2) Portbury Settled Coastal Edge a. Work with Natural England, Avon Wildlife Trust (NSC C2) and other landowners to ensure all woodlands a. Ensure all woodlands have a current Forestry have a Forestry Commission management plan Commission management plan (or equivalent), (or equivalent), addressing nature conservation addressing broad objectives, supporting their and also landscape objectives supporting their preparation and delivery. preparation and delivery. Set out a long-term b. Conserve and establish groups of high impact replacement plan for high landscape impact poplar landscape trees to screen and break up significant trees, maintaining these as a landscape feature. hard landscaping associated with Royal Portbury b. Ensure any new development requires the Dock. conservation and planting of trees within the site c. Ensure any new development requires the and as determined by scale and impact, includes conservation and planting of trees within the site off-site tree and woodland planting. and as determined by scale and impact, includes c. Conserve and regenerate hedgerow boundaries off-site tree and woodland planting. with an initial focus on those outside Grant d. Conserve and regenerate hedgerow boundaries Schemes, which are not low cut and/or where with an initial focus on those outside Grant hedgerow trees are present. Schemes, which are not low cut and/or where d. Conserve hedgerow and field trees and plant new hedgerow trees are present. ones at irregular spacings where absent within e. Conserve hedgerow and field trees and plant new hedged boundaries, reflecting NNR and SSSI ones at irregular spacings where absent within guidance where applicable. hedged boundaries. e. Ensure public access routes are easy to use and f. Ensure public access routes are easy to use and follow. follow. 69 THE FOREST OF AVON PLAN Map Ref: 1.3 Map Ref: 1.4 Clevedon & Portishead Ridges Tickenham Ridges and Combes and Combes (includes NSC E4) (part of NSC E5) a. Ensure all woodlands have a current Forestry a. Ensure all woodlands have a current Forestry Commission management plan (or equivalent), Commission management plan (or equivalent), addressing broad objectives, supporting their addressing broad objectives, supporting their preparation and delivery. Focus on the number of preparation and delivery. Focus on the ASNW first. ASNW and PAWS first. b. Buffer ASNW by establishing fringing areas for b. Buffer ASNW and PAWS by establishing fringing natural regeneration. areas for natural regeneration. c. Ensure any new development requires the c. Establish native trees and shrubs within conservation and planting of trees within the site greenspaces in Clevedon and Portishead through and as determined by scale and impact, includes the rewilding project, working with residents to off-site tree and woodland planting. deliver this. d. Conserve and regenerate hedgerow boundaries d. Establish individual and groups of trees and small with an initial focus on those outside Grant woodlands within primary and secondary school Schemes, which are not low cut and/or where grounds, with school responsibility for their care. hedgerow trees are present. e. Establish individual and small groups of trees e. Conserve hedgerow and field trees and plant new in/ adjacent to streets, addressing inequalities in ones at irregular spacings where absent within tree canopy cover and with a strong community hedged boundaries. dimension to their location, size and care. Reflect f. Ensure public access routes are easy to use the historic character of Clevedon, by replacing and follow, working with landowner to support Clevedon’s pines with similar species when continued provision of permissive paths. necessary. f. Conserve areas of coastal scrub, absorbing Park Map Ref: 1.5 Homes and residential development into the wider Abbots Leigh Sandstone Uplands landscape. (part of NSC F1) g. Ensure any new development requires the conservation and planting of trees within the site a. Ensure all woodlands have a current Forestry and as determined by scale and impact, includes Commission management plan (or equivalent), off-site tree and woodland planting. addressing broad objectives, supporting their preparation and delivery. Focus on the number of h. Conserve and regenerate hedgerow boundaries ASNW and PAWS first. with an initial focus on those outside Grant Schemes, which are not low cut and/or where b. Buffer ASNW and PAWS by establishing fringing hedgerow trees are present. areas for natural regeneration. i. Conserve hedgerow and field trees and plant new c. Ensure any new development requires the ones at irregular spacings where absent within conservation and planting of trees within the site hedged boundaries. and as determined by scale and impact, includes off-site tree and woodland planting. j. Ensure public access routes are easy to use and follow d. Conserve and regenerate hedgerow boundaries with an initial focus on those outside Grant Schemes, which are not low cut and/or where hedgerow trees are present. e. Conserve hedgerow and field trees and plant new ones at irregular spacings where absent within hedged boundaries. f. Ensure public access routes are easy to use and follow 70 A TREE AND WOODLAND STRATEGY FOR THE WEST OF ENGLAND Map Ref: 1.6 Avon Rolling Valley Farmland (NSC J6) a.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    54 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us