Environmental Impact Assessment Report

Environmental Impact Assessment Report

ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR PROPOSED CONSTRUCTION OF 20 PIERS OF APPROACH ROAD AND METRO SPUR LINE TO MOGHARPADA CAR DEPOT AND CASTING YARD AT KAVESAR FOR METRO LINE – 4 PROJECT PROJECT BY MUMBAI METROPOLITAN REGION DVELOPMENT AUTHORITY PREPARED BY GLOBAL MANAGEMENT AND ENGINEERING CONSULTANTS INTERNATIONAL 102, HIREN INDUSTRIAL ESTATE, MOGUL LANE, MAHIM (WEST), MUMBAI – 400 016 MAY 2019 EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 INDEX Page CONTENTS Sr. No. no. 1 LIST OF TABLES 2 LIST OF FIGURES 3 LIST OF ABBREVIATIONS CHAPTER 1 – INTRODUCTION 1.1 Project Background 1-1 1.2 Need of Project 1-2 1.2.1 GENERAL ADVANTAGES OF METRO RAILWAY SYSTEM 1-3 1.3 Scope of EIA 1-4 1.3.1 Study Area 1-4 1.4 Approaches and Methodology 1-4 1.4.1 Establishing Baseline Environmental Status 1-5 1.4.1.1 Physical Resources 1-5 1.4.1.2 Ecological Resource 1-7 1.4.1.3 Economic Development 1-8 1.4.2 Anticipated Environmental Impacts 1-8 1.4.3 Environmental Management Plan 1-8 CHAPTER 2 – PROJECT DESCRIPTION 2.1 Introduction Of The Project 2- 1 2.1.1 Transport Situation in Mumbai & Thane City 2-1 2.1.1.1 Rail 2-1 2.1.1.2 Bus 2-2 2.1.1.3 Water 2-2 2.1.1.4 Road 2-2 2.1.1.5 Air 2-3 2.1.1.6 Sea 2-3 2.2 Background Of The Project 2-4 2.3 Need Of The Project 2-6 2.3.1 General Advantages of Metro Railway System 2-6 2.4 Project Location 2-7 2.4.1 CRZ Status 2-13 2.5 Brief Description of Metro Line-4 2-16 2.5.1 Metro Corridor 2-16 2.5.2 Route Alignment 2-16 2.5.3 Route Lengths and Stations 2-17 2.5.4 Integration of AFC with other Lines And Modes of Transport 2-18 1 Mumbai Metropolitan region Development Authority EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 2.5.5 Boarding and Alighting 2-19 2.5.6 Metro Operation Plan 2-20 2.5.6.1 Salient features 2-20 2.5.6.2 Metro formation 2-20 2.6 DESCRIPTION OF THE PROJECT 2-22 2.6.1 Mogharpada Car-Shed Depot 2-22 2.6.1.1 Site Photographs of Car-shed depot at Mogharpada 2-24 2.6.2 Casting Yard at Kavesar 2-26 2.6.2.1 Site Photographs of Casting Yard at Kavesar 2-28 2.7 Salient features of the project 2-29 2.7.1 Project Cost 2-29 2.7.2 Potential Project Components 2-29 2.7.2.1 Water requirement 2-29 2.7.2.2 Infrastructure Facilities 2-29 2.7.2.3 Water quality 2-30 2.7.2.4 Biological/ Ecological Environment 2-30 2.7.2.5 Land Environment 2-30 2.7.2.6 Socio-Economic Status 2-31 2.7.2.7 Solid Waste Management 2-31 2.7.2.8 Traffic Management 2-31 CHAPTER 3 BASELINE ENVIRONMENT 3.1 Scope Of Work 3-1 3.2 Baseline Environmental Status 3-2 3.2.1 Land Environment 3-2 3.2.2 Topography 3-3 3.2.3 Geography &Geology 3-3 3.2.4 Hydrogeology 3-3 3.2.4.1 Hard Rock Areas: Deccan Trap Basalt 3-4 3.2.4.2 Seismicity 3-5 3.3 Soil Quality 3-6 3.4 Reconnaissance Survey 3-8 3.5 Ambient Air Quality Studies 3-9 3.6 Climates And Meteorology 3-12 3.6.1 Rainfall 3-12 3.6.2 Temperature 3-13 3.6.3 Humidity 3-13 3.6.4 Wind 3-13 3.7 Noise Level Studies 3-20 3.7.1 Noise Monitoring Result 3-21 3.8 Water Environment 3-21 3.8.1 Surface Water 3-22 2 Mumbai Metropolitan region Development Authority EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 3.8.2 Ground Water 3-22 3.8.3 Baseline Status-Surface Water 3-23 3.9 Ecology &Biological Environment 3-25 3.9.1 Activities Undertaken During The Study 3-25 3.9.2 Terrestrial Ecology 3-26 3.9.3 Marine Ecology 3-36 3.9.4 Mangrove vegetation 3-39 3.10 Photographs 3-41 CHAPTER 4 – ENVIRONMENTAL IMAPCT ASSESSMENT 4.1 Introduction 4- 1 4.1.1 EIA Definitions 4-1 4.1.2 Purpose Of Environment Impact Assessment 4-1 4.1.3 Potential Environment Impacts Of The Project 4-3 4.2 Environment Impact Assessment And Mitigation Measures 4-3 4.2.1 Introduction 4-3 4.2.2 Significant Environmental Impacts And Mitigative Measures 4-3 4.2.3 Checklist of Impacts 4-4 4.2.4 Matrix Procedure for Impact Assessment and Quantification 4-6 4.3 Negative Environmental Impacts 4-8 4.3.1 Impacts from the project Location 4-8 4.3.1.1 Land Use 4-8 4.3.1.2 Loss of trees 4-9 4.3.1.3 Issues related to Utility/ Drainage 4-9 4.3.1.4 Socio-Economic Impact 4-10 4.3.1.5 Impact on Historical places 4-10 4.3.1.6 Risk Due to Earthquake 4-10 4.3.2 Project Design Related Impacts 4-10 4.3.2.1 Engineering Design 4-10 4.3.2.2 Project Scheduling 4-10 Through post construction by providing facilities to Govt. 4-11 4.3.2.3 departments 4.3.3 Impacts Due To Project Construction 4-11 4.3.3.1 Soil Erosion Impact 4-11 4.3.3.2 Traffic Coordination issues 4-12 4.3.3.3 Risk to Existing Building 4-12 4.3.3.4 Excavated Soil Disposal 4-12 4.3.3.5 Air pollution due to Dust Emission 4-12 4.3.3.6 Water Demand 4-13 4.3.3.7 Supply of Construction Material 4-14 4.3.3.8 Construction and Demolition Waste Impacts (Debris) 4-14 4.3.3.9 Casting Yard Impacts 4-14 3 Mumbai Metropolitan region Development Authority EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 4.3.3.10 Noise Levels 4-16 4.3.3.11 Loss of Historical and Cultural Monuments 4-19 4.3.3.12 Impacts due to Labour Camps 4-19 4.3.4 Impacts Due To Project Operation 4-19 4.3.4.1 Noise Pollution 4-19 4.3.4.2 Water Pollution 4-19 4.3.4.3 Air Pollution 4-20 4.3.4.4 Solid Waste Generation 4-20 4.3.4.5 Aesthetics 4-20 4.3.5 Impacts Due To Depot 4-20 4.3.5.1 Water Requirement 4-21 4.3.5.2 Oil spills 4-21 4.3.5.3 Noise Pollution 4-21 4.3.5.4 Solid Waste 4-21 4.4 Positive Environmental Impacts 4-22 4.4.1 Improved Aesthetics 4-22 4.4.2 Increased Employment Opportunities 4-23 4.4.3 Enhancement of Economy 4-23 4.4.4 Mobility Safety and Reduced Accidents 4-23 4.4.5 Traffic Congestion Reduction 4-23 4.4.6 Reduced Fuel Consumption 4-23 4.4.7 Reduced Air Pollution 4-23 4.4.8 Carbon Credits 4-24 4.4.9 Improvement of Quality of Life 4-27 CHAPTER 5 - ENVIRONMENTAL MONITORING PROGRAMME 5.1 The Need 5- 1 5.2 Areas Of Concern 5-4 5.3 Water Quality 5-4 5.4 Soil Quality 5-4 5.5 Ambient Air Quality 5-5 5.6 Noise 5-5 5.7 Biological Environment 5-6 5.8 Summary Of Environmental Monitoring Programme 5-6 CHAPTER 6 – EMERGENCY MANAGEMENT PLAN & DISASTER MANAGEMENT PLAN 6.1 Disaster Management Plan 6- 1 6.1.1 Disaster Management 6-1 6.1.2 Preparedness for Disaster Management 6-2 6.1.3 Need for Disaster Management Measures 6-2 4 Mumbai Metropolitan region Development Authority EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 6.1.4 Identification and Assessment of Hazards 6-3 6.1.5 Planning During Conceptual Stage 6-3 6.1.6 Emergency planning and response procedures 6-4 6.1.7 Serious Incidents Requiring Disaster Management Measures 6-4 6.1.8 Provisions at Metro Stations/Other Installations 6-5 6.2 Emergency Measures 6-7 6.3 Various Scenarios Of Risks And Disaster In The Project 6-10 6.2.1 SCENARIO 1: Evacuation of People 6-10 6.2.21 SCENARIO 2: Accidents 6-10 6.3.3 SCENARIO 3: Spillage and Leakages Of Oil 6-11 CHAPTER 7 – PROJECT BENEFITS 7.1 Introduction 7- 1 7.2 Background Of The Project 7-1 7.3 Need of project 7-3 7.4 Benefits of Metro Railway System 7-4 7.4.1 Technical Benefits 7-2 7.4.2 Environmental Benefits 7-2 7.4.3 Economic Benefits 7-3 CHAPTER 8 – ENVIRONMENTAL MANAGEMENT PLAN 8.1 Introduction 8- 1 8.2 Summary Of Critical Impacts/ Issues 8-3 8.3 Identification Of Implementing Authority 8-4 8.4 Implementation Of Recommended Mitigation Measures 8-4 8.5 Monitoring Plan 8-5 8.6 Environmental Training 8-5 8.7 Budgets For Environmental Management Plan 8-6 8.8 Environmental Monitoring Plan 8-12 8.9 Performance Indicators 8-12 8.10 Budgets For Environmental Management Plan 8-16 CHAPTER 9 – EXECUTIVE SUMMARY 9.1 Introduction 9- 1 9.2 Project Description 9-1 9.3 Need Of The Project 9-2 9.4 About the Project 9-3 9.4.1 Project Location 9-3 9.4.2 CRZ Status 9-6 9.5 Project Description 9-8 9.5.1 Mogharpada Car-Shed Depot 9-8 9.5.2 Casting Yard At Kavesar 9-9 5 Mumbai Metropolitan region Development Authority EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 9.6 Description of the Environment 9-9 9.6.1 Establishing Baseline Environmental Status 9-9 9.6.2 Soil Quality 9-10 9.6.3 Air Quality 9-11 9.6.4 Water Quality 9-12 9.6.5 Noise Quality 9-13 9.6.6 Ecology & Bio-Diversity 9-13 9.7 Environment Management Plan 9-13 9.8 Project Benefits 9-16 9.9 Project Cost 9-17 9.10 Disaster Management Plan 9-17 9.11 Environmental Managementcost 9-17 CHAPTER 10 – CONSULTANTS ENGAGED 10 Consultants Engaged 10 -1 6 Mumbai Metropolitan region Development Authority EIA FOR PROPOSED CONSTRUCTION OF CAR-SHED DEPOT AND CASTING YARD FOR METRO LINE -4 LIST OF TABLES Table Pg.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    211 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us