ALASKAN WAY CONSTRUCTION NOVEMBER 2019 MOVING NORTH OF PIKE IN DECEMBER As early as December 2, Waterfront Seattle will expand its work area north of Pike Street in the footprint of the former viaduct to begin construction of the new Elliott Way. This road over the railroad tracks and carved into the hillside, will be a key connection between Alaskan Way and Belltown. Activities include establishing the work zone, mobilizing equipment, locating utilities, and removing asphalt and landscaping. In addition, we plan to replace the eastern segment of the Lenora Pedestrian Bridge in order to meet the appropriate grades of the new Elliott Way sidewalk and roadway. The Port of Seattle plans to perform maintenance activities on the elevator here. All of these activities require closure of the Lenora pedestrian bridge, including elevator access, starting as early as January 2, until it is connected to the new Elliott Way. WORK ZONES LEGEND Current work zones • Footprint of the former Alaskan Way Future work zone/Temporary parking WSDOT work zone Viaduct between Pike and Bell streets Current pedestrian paths PIER 66 Stairs (see map) Elevators Lenora pedestrian bridge closed Bell Street Bridge Alaskan Way Elliott Ave SCHEDULE AND HOURS PIER 63 PIER 62 Railroad Tracks Wall St SEATTLE • Monday through Friday, 7 AM to 5 PM AQUARIUM Battery St Pine St Pine Bell St PIER 58 • Occasional overnight and weekend work St Pike Victor Blanchard St Steinbrueck Park WesternLenora St Ave 1st Ave PEDESTRIAN AND VEHICLE PIKE HILL MARKETFRONT CLIMB Virginia St ACCESS Western Ave PIKE PLACE MARKET Stewart St Pine St 2nd Ave • No vehicle access impacts, all work Union St will be in WSDOT’s previous viaduct 2nd Ave demolition work zone Map of work zones 3rd Ave • Pedestrian access will be maintained to all businesses and residences OTHER WORK • Closure of the Lenora Pedestrian bridge • Private utility work on Pine Street east of Alaskan Way is starts as early as January 2 scheduled to begin Monday, November 25, and anticipated to be completed in early December. Work hours are 7 AM to 4 PM. If PARKING AND LOAD ZONES you have any questions about this work contact Daniel Aguilar at • On-street parking will be restricted [email protected] for more information. between Pike and Pine streets and on Pine Street adjacent to the work zone • The Washington State Ferries is replacing aging structures and • Access to nearby parking garages will remodeling the passenger terminal at Colman Dock. Visit www. remain open wsdot.wa.gov/Projects/Ferries/ColmanMultimodalTerminal for more information. EQUIPMENT AND NOISE • Expect construction equipment and vehicles moving in and out of the work zone from Pine St and Elliott Ave • Construction trucks and equipment may be noisy, with the most significant noise coming from breaking and removing roadway pavement and from vacuum trucks locating utilities WATERFRONTSEATTLE.ORG Photo of new work area and site of future Elliott Way. SIGN UP FOR CONSTRUCTION UPDATE EMAILS Sign up for our construction update email list at waterfrontseattle.org/construction- updates-mailing-list VISIT DOWNTOWNSEATTLEPARKING.ORG Visit downtownseattleparking.org to find rates, hours and directions to thousands of parking spaces in the area. WATERFRONTCONSTRUCTION.ORG The Waterfront is going to be a busy place over the next several years. Visit waterfrontconstruction.org for more information on multiple projects compiled all in one place. QUESTIONS? If you have questions or would like more information about the Waterfront Seattle program, please call, email or visit our website. 206.499.8040 [email protected] waterfrontseattle.org NOVEMBER 2019 WATERFRONTSEATTLE.ORG.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-