Indiana Department of Transportation (INDOT)

Indiana Department of Transportation (INDOT)

Indiana Department of Transportation (INDOT) State Preservation and Local Initiated Projects FY 2016 - 2019 SPONSOR DES STIP ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL Estimated PROGRAM PHASE FEDERAL MATCH 2016 2017 2018 2019 NAME CATEGORY Cost left to Complete Project* Lake County Hammond 1500416 M 09 IR 1025 Bike/Pedestrian Erie Lackawanna Trail, Calumet LaPorte 0 TA Northwest Indiana CN $2,000,000.00 $0.00 $2,000,000.00 Facilities Avenue Bridge MPO 100% Local PE $0.00 $451,000.00 $451,000.00 Funds Northwest Indiana PE $0.00 $0.00 $0.00 MPO 100% Local CN $0.00 $3,719,000.00 $3,719,000.00 Funds Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Hobart 1500417 M 09 ST 1033 Construct ADA Middle School Corridor LaPorte .62 TA 100% Local CN $0.00 $61,800.00 $61,800.00 Approved Sidewalk Sidewalks Funds Ramps Northwest Indiana CN $247,200.00 $0.00 $247,200.00 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Lake County 0088990 M 09 IR 1000 Bridge Replacement, Bridge #36 State Line Road LaPorte 0 STP Northwest Indiana CN $707,584.00 $0.00 $707,584.00 Other Construction over Kankakee River MPO Local Bridge CN $875,200.00 $0.00 $875,200.00 Program Northwest Indiana CN $111,416.00 $0.00 $111,416.00 MPO - PYB 100% Local CN $0.00 $423,550.00 $423,550.00 Funds Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Lake County 0600752 M 09 IR 1036 New Bridge, Other Replace Lake County Bridge LaPorte .2 STP 100% Local CN $0.00 $215,291.68 $215,291.68 306: Broad St over Turkey Funds Creek Northwest Indiana CN $856,366.74 $0.00 $856,366.74 MPO - PYB Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Lake County 9980080 M 09 ST 1000 Intersection 45th Ave from Colfax to LaPorte 1.5 STP 100% Local CN $0.00 $1,916,400.00 $1,916,400.00 Improvement Whitcomb (earmark) (PH3) Funds Northwest Indiana CN $7,665,600.00 $0.00 $0.00 $7,665,600.00 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Schererville 0401062 M 09 SP BIKE Bike/Pedestrian Pennsy Greenway NW Trail - LaPorte 0 TA 100% Local RW $0.00 $447,141.00 $447,141.00 Facilities Crown Point, Schererville, and Funds Munster - Acquisition Page 1 of 18 Report Created:8/25/2015 10:04:09AM *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes. Indiana Department of Transportation (INDOT) State Preservation and Local Initiated Projects FY 2016 - 2019 SPONSOR DES STIP ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL Estimated PROGRAM PHASE FEDERAL MATCH 2016 2017 2018 2019 NAME CATEGORY Cost left to Complete Project* Schererville 0401062 M 09 SP BIKE Bike/Pedestrian Pennsy Greenway NW Trail - LaPorte 0 TA Northwest Indiana RW $1,788,563.00 $0.00 $1,788,563.00 Facilities Crown Point, Schererville, and MPO - PYB Munster - Acquisition Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Crown Point 1172428 M 09 ST 1008 Road Rehabilitation North Street (109th) from LaPorte 1 STP Northwest Indiana CN $120,000.00 $0.00 $120,000.00 (3R/4R Standards) Indiana to Broadway MPO - PYB Demonstration PE $15,125.00 $0.00 $15,125.00 Fund Program Demonstration CN $153,946.00 $0.00 $153,946.00 Fund Program 100% Local CN $0.00 $30,000.00 $30,000.00 Funds Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Crown Point 1173426 M 09 IR 1029 Intersection Construct Roundabout, 93rd LaPorte 0 STP 100% Local CN $0.00 $421,042.60 $421,042.60 Improvement, Ave and Chase Street Funds Roundabout Northwest Indiana CN $1,684,170.40 $0.00 $1,684,170.40 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Crown Point 1173427 M 09 ST 1001 Other Type Project Storm Drainage Imp. SR 53 and LaPorte 0 STP 100% Local RW $0.00 $50,000.00 $50,000.00 (Miscellaneous) 101st Ave intersection Funds Northwest Indiana RW $200,000.00 $0.00 $200,000.00 MPO 100% Local CN $0.00 $274,103.75 $274,103.75 Funds Northwest Indiana CN $1,096,415.00 $0.00 $1,096,415.00 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Lake Station 1173429 M 09 ST 1001 Intersection Intersection Improvement LaPorte 0 STP Northwest Indiana CN $2,088,000.00 $0.00 $0.00 $2,088,000.00 Improvement, Central Ave at Fairview Ave. MPO Roundabout 100% Local RW $0.00 $522,200.00 $522,200.00 Funds 100% Local CN $0.00 $232,000.00 $232,000.00 Funds Northwest Indiana RW $225,000.00 $0.00 $225,000.00 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Hobart 0900071 M 09 ST 1039 Road Reconstruction 61st Avenue SR 51 to Arizona LaPorte 1.1 STP Northwest Indiana CN $9,080,400.00 $0.00 $9,080,400.00 (3R/4R Standards) Street MPO Page 2 of 18 Report Created:8/25/2015 10:04:09AM *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes. Indiana Department of Transportation (INDOT) State Preservation and Local Initiated Projects FY 2016 - 2019 SPONSOR DES STIP ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL Estimated PROGRAM PHASE FEDERAL MATCH 2016 2017 2018 2019 NAME CATEGORY Cost left to Complete Project* Hobart 0900071 M 09 ST 1039 Road Reconstruction 61st Avenue SR 51 to Arizona LaPorte 1.1 STP 100% Local CN $0.00 $4,008,209.58 $4,008,209.58 (3R/4R Standards) Street Funds Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Lake County 1297288 M 09 ST 1039 Bridge Rehabilitation Rehab/widen Lake Co. Bridge LaPorte 0 STP 100% Local CN $0.00 $328,445.23 $328,445.23 Or Repair 102 on 61st Ave Funds Northwest Indiana CN $1,313,780.94 $0.00 $1,313,780.94 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Schererville 1173595 M 09 ST 1033 Bike/Pedestrian Pennsy Greenway Phase 2 LaPorte 1.5 TA Northwest Indiana CN $1,187,002.00 $0.00 $1,187,002.00 Facilities Main Street to 137th Street MPO 100% Local CN $0.00 $296,750.50 $296,750.50 Funds Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Munster 1173597 M 09 IR 1025 Bike/Pedestrian Bike/Ped Trail Connector:at LaPorte .15 STP Northwest Indiana CN $784,080.00 $0.00 $784,080.00 Facilities Cady ditch and Marsh Ditch MPO 100% Local CN $0.00 $196,020.00 $196,020.00 Funds Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Lake County 1172007 M 09 ST 1038 Road Reconstruction 45th Ave. from Whitcomb to LaPorte 1.5 STP 100% Local CN $0.00 $438,000.00 $438,000.00 (3R/4R Standards) Chase (Ph 2B) Funds Northwest Indiana CN $1,752,000.00 $0.00 $1,752,000.00 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Hammond 1297017 M 09 SR 312 Road Reconstruction Chicago St. (SR 312) Calumet LaPorte 2.114 STP 100% Local RW $0.00 $300,000.00 $300,000.00 (3R/4R Standards) Ave to White Oak Ave Phase 3 Funds Demonstration RW $5,614,320.00 $0.00 $5,614,320.00 Fund Program Northwest Indiana RW $0.00 $0.00 $0.00 MPO Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Merrillville 1173706 M 09 ST 1033 Bike/Pedestrian C&O Trail, Phase 2 from SR 53 LaPorte 1.17 CMAQ 100% Local CN $0.00 $200,358.00 $200,358.00 Facilities to Mississippi St. north of US Funds 30 Northwest Indiana CN $819,240.00 $0.00 $819,240.00 MPO - PYB Comments: NIRPC FY 16-19 TIP in cooperated into STIP 2016-2019 by reference July 1, 2016 for phases and year. Hobart 0810541 M 09 ST 1001 Landscaping Downtown Hobart along Third LaPorte 0 STP 100% Local RW $0.00 $44,720.00 $44,720.00 Street from Main Street to Funds Center Street. Page 3 of 18 Report Created:8/25/2015 10:04:09AM *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us