Long‐Term Maintenance Dredging Management Plan for Port of Townsville and Port of Lucinda 2019 – 2029

Long‐Term Maintenance Dredging Management Plan for Port of Townsville and Port of Lucinda 2019 – 2029

Port of Townsville Limited Long‐Term Maintenance Dredging Management Plan for Port of Townsville and Port of Lucinda 2019 – 2029 POT 2128 REVISION 3 Document Control Sheet Revision history Revision No. Effective Date Comments 0 17/12/2018 First Published Administrative update (typos, alignments); modification of 1 12/03/2019 Figure 16 layout; addition of Figure 17b; addition of Contingency Planning to Section 5.3 Reformatting and minor administrative updates following 2 11/03/2020 first informal review; addition of Social Values to Sections 3 and 12 Update to new Port branding; modification of Section 1 in line with DTMR comments; updates following expiry of 3 11/09/2020 Section 19 Deed of Agreement and issue of master plan; addition of new research and monitoring results © Port of Townsville Limited Document Type Plan Document No. POT 2128 A.C.N. 130 077 673 Revision 3 Only electronic copy on server is controlled. To ensure paper copy is current, check Date 11/09/2020 revision number against entry in Qudos ‐ Master Document List Page Page 2 of 107 CONTENTS 1 Introduction ............................................................................................................................................. 5 Schedule 1 – Port of Townsville ....................................................................................................................... 17 2 Port Locality, Setting and Shipping ........................................................................................................ 17 3 Port of Townsville Environmental Values .............................................................................................. 26 4 Consultation and Key Issues .................................................................................................................. 37 5 Port Sediment Characteristics ............................................................................................................... 39 6 Risk Assessment Framework ................................................................................................................. 58 7 Identification and Treatment of Key Risks ............................................................................................. 67 8 Environmental Management ................................................................................................................. 69 9 Monitoring Framework .......................................................................................................................... 79 10 Performance Review .............................................................................................................................. 82 Schedule 2 – Port of Lucinda ............................................................................................................................ 84 11 Port Locality, Setting and Shipping ........................................................................................................ 84 12 Port of Lucinda Environmental Values .................................................................................................. 88 13 Consultation and Key Issues .................................................................................................................. 94 14 Port Sediment Characteristics ............................................................................................................... 95 15 Risk Assessment Framework ................................................................................................................. 96 16 Identification and Treatment of Key Risks ............................................................................................. 97 17 Environmental Management ................................................................................................................. 98 18 Monitoring Framework .......................................................................................................................... 99 19 Performance Review ............................................................................................................................ 100 20 Reference Material and Supporting Documentation .......................................................................... 102 21 Definitions and Acronyms.................................................................................................................... 105 Tables Table 1: Current Maintenance Dredging Approvals for the Port of Townsville................................................ 9 Table 2: Approved Design Depths for All Lawful Structures at the Port of Townsville .................................. 23 Table 3: Threatened Bird Species of Cleveland Bay ........................................................................................ 33 Table 4: Drains and Creeks Discharging to Cleveland Bay (TCC Stormwater GIS Layer) ................................. 43 Table 5: Commonwealth Dredging Approvals since 1988, for Both Maintenance and Capital Dredging ...... 45 Table 6: Historic and Predicted Maintenance Dredging Volumes (Historic 2007‐2018, Predicted 2019‐2028) ......................................................................................................................................................................... 46 Table 7: Maintenance Dredge Schedule – Sea Placement 10‐year Plan ........................................................ 47 Table 8: Key Implications for Each Maintenance Dredging/Placement Alternative ....................................... 55 Table 9: Description of Impact Assessment Threshold Values ....................................................................... 60 Table 10: Risk Assessment for the Port of Townsville, to / from Maintenance Dredging within Cleveland Bay ......................................................................................................................................................................... 64 Table 11: The Last 19 Years of Long and Short‐Term Research Programs at the Port of Townsville ............. 68 Table 12: Comparison of Dredge Equipment Production Rates at the Port of Townsville ............................. 77 Table 13: Monitoring Programs at the Port of Townsville .............................................................................. 79 Table 14: Research and Monitoring Programs 2020‐2025 ............................................................................. 80 Table 15: Monitoring Programs at the Port of Lucinda .................................................................................. 99 © Port of Townsville Limited Document Type Plan Document No. POT 2128 A.C.N. 130 077 673 Revision 3 Only electronic copy on server is controlled. To ensure paper copy is current, check Date 11/09/2020 revision number against entry in Qudos ‐ Master Document List Page Page 3 of 107 Figures Figure 1: Port of Townsville and Port of Lucinda .............................................................................................. 5 Figure 2: The Long‐Term Maintenance Dredging Management Framework (DTMR 2016) ............................. 7 Figure 3: Port of Townsville, Port Limits within Cleveland Bay ....................................................................... 13 Figure 4: Cleveland Bay Maintenance Dredge Material Placement Area ....................................................... 13 Figure 5: Port Governance Structure Flow Chart (as per Port Website 2020) ................................................ 14 Figure 6: The Port of Townsville within Cleveland Bay ................................................................................... 18 Figure 7: Snapshot for the 2018‐2019 Financial Year (2018/2019 Annual Report, Port 2019) ...................... 19 Figure 8: Lawful Structures within the Port of Townsville (DES Allocation Notice CA0000014) .................... 21 Figure 9: Lawful Structures Within the Port of Townsville and Cleveland Bay (DES Allocation Notice CA0000014) ...................................................................................................................................................... 22 Figure 10: Onshore Maintenance Dredge Material Placement Areas (DES Allocation Notice CA0000014) .. 24 Figure 11: Platypus and Sea Channel Typical Cross Section ........................................................................... 25 Figure 12: Ross River Channel Cross Section .................................................................................................. 25 Figure 13: Reef Communities around Magnetic Island (extract from Port Expansion AEIS, 2016) ................ 28 Figure 14: Coastal Habitats in and around Cleveland Bay .............................................................................. 35 Figure 15: Quantitative Summary of Sediment Resuspension at Port of Townsville (BMT WBM 2018) ....... 38 Figure 16a: Bathymetry Chart of Cleveland Bay AUS 827 (2004) ................................................................... 40 Figure 17: Risk Assessment Process ................................................................................................................ 58 Figure 18: El Nino Year – Modelled Zones of Impact for a Typical Dredging Period ...................................... 61 Figure 19: El Nino Year – Modelled Zones of Impact over a 12‐month Period .............................................. 61 Figure 20: La Nina Year – Modelled Zones of Impact for a Typical Dredging Period .....................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    107 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us