he new University of Houston Football BIM Start Date September, 2013 stadium – to be built on the site of the Tcurrent Robertson Stadium following BIM End Date October, 2013 the 2012 season – is expected to cost around $105 million. The stadium will be the home Team Size 30 Engineers of the Houston Cougars football team, which represents the University of Houston in Client Letsos Company collegiate football. Plans call for the new Architect PageSoutherlandPage facility to hold 40,000 fans with Phase II expansion designs that could increase that Engineer Rogers Moore Engineers LLC total to 60,000. The new facility will be specially coated with corrugated metal MEP Contractor/Consultant M-E Engineers, Inc exterior skin, and possess an opening on the stadium’s northwest side that will showcase General Contractor Manhattan the downtown Houston skyline. With a Owner University of Houston planned completion date in July 2014, the University of Houston has announced it's intention to open the stadium to the public beginning in the 2014 season. Scope of Work The scope included 3D Modeling, Wall sleeve drawings, floor sleeve drawings, Shop drawings, Coordination of plumbing trade. Pinnacle’s Value Addition Rerouted pipes to find out the shortest path; thus reducing material cost. 3D BIM Model Fixing up the Plumbing Fixture location. Generated RFI’s for design validation. Space constrain in corridor area was managed with innovative solutions. Quick turnaround project. As this has been a oval shaped stadium project, We have used the Autodesk Fabrication software for the modeling; Also odd angle fittings were not available hence pipe routings were difficult to implement as the pipes were penetrating the wall with an odd angle. 2D Shop Drawing Global Leader in BIM Services www.pinnaclecad.com Copyright © 2011 Pinnacle Infotech, Inc..
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-